KEK Computing Resources after Earthquake Akiya Miyamoto 30-March-2011 ILD Software WG meeting Status as of today.

Slides:



Advertisements
Similar presentations
ATLAS Tier-3 in Geneva Szymon Gadomski, Uni GE at CSCS, November 2009 S. Gadomski, ”ATLAS T3 in Geneva", CSCS meeting, Nov 091 the Geneva ATLAS Tier-3.
Advertisements

Report of Liverpool HEP Computing during 2007 Executive Summary. Substantial and significant improvements in the local computing facilities during the.
Kamisu, Japan / 2MW x 7 ・ This wind farm withstood Tsunami on 3.11 ・ 7 units of 2MW Wind Turbine ・ Being developed as private sector for future such as.
Workshop on Accelerator Operations 2012 RIKEN Nishina Center’s Response to Fukushima Daiichi Nuclear Disaster -Radiation Screening at Fukushima, How We.
S. Gadomski, "ATLAS computing in Geneva", journee de reflexion, 14 Sept ATLAS computing in Geneva Szymon Gadomski description of the hardware the.
ATLAS computing in Geneva Szymon Gadomski, NDGF meeting, September 2009 S. Gadomski, ”ATLAS computing in Geneva", NDGF, Sept 091 the Geneva ATLAS Tier-3.
The Top Three Nuclear Power Plants in the World Brianna Coley Ashley Girola Charlotte Sappo.
Japan Earthquake and Tsumani Maryam AL-Naimi 9C. What Happened? In March Japan was hit by an earthquake that devastated the whole country, this.
1 INDIACMS-TIFR TIER-2 Grid Status Report IndiaCMS Meeting, Sep 27-28, 2007 Delhi University, India.
Large scale data flow in local and GRID environment V.Kolosov, I.Korolko, S.Makarychev ITEP Moscow.
Case Study- Nuclear Radiation In Japan In March2011 PROJECT-BASED LEARNING 1.
US ATLAS Western Tier 2 Status and Plan Wei Yang ATLAS Physics Analysis Retreat SLAC March 5, 2007.
Computing for ILC experiment Computing Research Center, KEK Hiroyuki Matsunaga.
Nuclear Accident at the Fukushima Dai-ichi NPP June 2, 2011 Embassy of Japan in Bulgaria.
Computing for ILC experiments Akiya Miyamoto KEK 14 May 2014 AWLC14 Any comments are welcomed.
NUCLEAR DISASTER IN FUKUSHIMA. INDEX 1. DISASTER 2. DAMAGES 3. PEOPLE WHO HELPED 4. NOWADAYS 5. PHOTOS 6. VIDEO.
Tsunami in Tokyo, Japan. Tokyo's Tsunami On March 11, 2011 the Tsunami hit Tokyo, Japan. This tsunami lasted six minutes. It hapened on Friday at 2;46.
Software Common Task Group Meeting Akiya Miyamoto 6-June-2011.
Software tools and Computing Akiya Miyamoto KEK 29-September-2006 At FJPPL meeting.
PC clusters in KEK A.Manabe KEK(Japan). 22 May '01LSCC WS '012 PC clusters in KEK s Belle (in KEKB) PC clusters s Neutron Shielding Simulation cluster.
Software Overview Akiya Miyamoto KEK JSPS Tokusui Workshop December-2012 Topics MC production Computing reousces GRID Future events Topics MC production.
Summary of Software and tracking activities Tokusui Workshop December 2015 Akiya Miyamoto KEK.
Next Step Akiya Miyamoto, KEK 17-Sep-2008 ILD Asia Meeting.
Large scale data flow in local and GRID environment Viktor Kolosov (ITEP Moscow) Ivan Korolko (ITEP Moscow)
KEK GRID for ILC Experiments Akiya Miyamoto, Go Iwai, Katsumasa Ikematsu KEK LCWS March 2010.
Report from SB2009 Working Group Akiya Miyamoto 8-July-2010 DESY ILD Software and Integration Workshop.
Recovery from the earthquake Takashi Sasaki. Disaster recovery “Disaster” comes from human error or hardware failure was considered before We were preparing.
Dominique Boutigny December 12, 2006 CC-IN2P3 a Tier-1 for W-LCG 1 st Chinese – French Workshop on LHC Physics and associated Grid Computing IHEP - Beijing.
Computer System Replacement at KEK K. Murakami KEK/CRC.
Vendredi 27 avril 2007 Management of ATLAS CC-IN2P3 Specificities, issues and advice.
The CMS Beijing Tier 2: Status and Application Xiaomei Zhang CMS IHEP Group Meeting December 28, 2007.
Computing requirements for the experiments Akiya Miyamoto, KEK 31 August 2015 Mini-Workshop on ILC Infrastructure and CFS for Physics and KEK.
Claudio Grandi INFN Bologna Workshop congiunto CCR e INFNGrid 13 maggio 2009 Le strategie per l’analisi nell’esperimento CMS Claudio Grandi (INFN Bologna)
BY Darin Rosellini Winter Quarter 2017
ILD MCProduction with ILCDirac
The Beijing Tier 2: status and plans
Xiaomei Zhang CMS IHEP Group Meeting December
Fukushima Daiichi Jourdan Robbins 12/6/ /16/16.
A Nuclear TVHS By John Parrish.
Belle II Physics Analysis Center at TIFR
The Fukushima Nuclear Power Plant
Akiya Miyamoto KEK 1 June 2016
LCG Deployment in Japan
Bulk production of Monte Carlo
CC - IN2P3 Site Report Hepix Spring meeting 2011 Darmstadt May 3rd
My media story Daniella vincent.
Brief summary of discussion at LCWS2010 and draft short term plan
Update on Plan for KISTI-GSDC
Sergio Fantinel, INFN LNL/PD
Philippe Charpentier CERN – LHCb On behalf of the LHCb Computing Group
Readiness of ATLAS Computing - A personal view
Oxford Site Report HEPSYSMAN
Simulation use cases for T2 in ALICE
Computing in ILC Contents: ILC Project Software for ILC
ALICE Computing Model in Run3
ILD Ichinoseki Meeting
Welcome to our Nuclear Physics Computing System
Interoperability of Digital Repositories
REMOVAL AND RELOCATION OF SPENT NUCLEAR FUEL FROM THE SAN DIEGO REGION
Fukushima Lessons Learned
Welcome to our Nuclear Physics Computing System
5C present simple or present continuous?
5C present simple or present continuous?
Today’s agenda Hardware architecture and runtime system
Simulation plan -- GLDPrime --
A SNAPSHOT OF THE SITUATION ASSESSMENT IN JAPAN ON DAY 4
Connecting Science and Life with Trust
Computer communications
Welcome to CBCS Custom Networks
Smart meters and energy usage: a survey of energy behaviour among those who have had a smart meter, and those who have yet to get one April 2019.
Presentation transcript:

KEK Computing Resources after Earthquake Akiya Miyamoto 30-March-2011 ILD Software WG meeting Status as of today

Earthquake – direct damage Earthquake hit east Japan on 11-March. Ex. My KEK office, 11-March  I appreciate many warm words we received since then. No injuries among our colleagues. For KEK situation, See Many damages on accelerator facilities. See Toge’s report at ALCPG11 for example. After March 11, 1 week to check buildings, another 1 week to turn on power to each bld. No damages to servers maintained by our group. Our servers, except CPU servers, are in operation since this week Servers at KEKCC: Some concern on HPSS. Other components seem to be OK, but still waiting check after power on /03/30 Akiya Miyamoto, ILD SW WG meeting

Fukushima nuclear plant Fukushima Plant is about 160 km north of KEK. On going crisis. Radiation are continuously monitored at many places in Japan. Ex. KEK site /03/30 Akiya Miyamoto, ILD SW WG meeting KEK Fukushima NP Tohoku Tokyo Vent Rain ~0.2  Sv/h now. Mainly Iodine. Half life 8 days. ~80  Sv when integrated, which is less than does by a round trip flight from Narita to NewYork(200  Sv) But future of plant is unpredictable ! Will take long for a complete settle down. 3/15 Shinshu 3/30 3/22

Electricity Due to earthquake, Tokyo Electric Power Company (TEPCO) lost about 1/4 of their generators, which includes nuclear and non-nuclear power plants. To avoid a big blackout, rolling blackout has been started soon after the earthquake. The rolling blackout may be avoided in May-June when power consumption is low. But highest demand in July to September for air conditioning. Power recovery will take long. Some people says that the power shortage may continue till summer Ibraki prefecture, where KEK is sited, is not included in rolling prefecture because of the earthquake hit the area. However, due to a special contract between KEK and TEPCO, KEK power consumption is limited to 2MW for the moment. Thus,  We operate group servers without air conditioning  Login servers ( which mounts home disks ) at KEKCC are turned on only weekends  No power to CPU servers for batch and GRID WNs ( > 2000 cores ) and SE /03/30 Akiya Miyamoto, ILD SW WG meeting

Consequences to ILD study No CPU resources in KEK:  Whizard for ttH 8 fermion: needs > 2GB memory, CPU time > 7 days  Mokka/Marlin : hard to generate big samples. Access to GRID SE  Until GRID SE is back online, no access to 350 GeV samples, both generators ( ~ 2 TB ) and Simulated/DST files ( ~ 35 TB )  copy to other places is not a simple job if stable operation is not available. GRID UI  We can access GRID sites in Europe. We’d like to use them. But file transfer is time consuming /03/30 Akiya Miyamoto, ILD SW WG meeting For the moment, our analysis activity is slow down. I don’t know for sure how long it will be. But we are trying to give more electric power to servers and I hope the situation is improved soon.