/ Reducing Risk of Collision within T3 possessions: 5/15mph Brief London North Western.

Slides:



Advertisements
Similar presentations
ES PICOP LEARNING FROM INCIDENTS Learning from incidents:
Advertisements

SCORT/TRB Rail Capacity Workshop - Jacksonville Florida1 1  A Primer on Capacity Principles  New Technologies  Public Sector Needs 22 September
Share with Pride Train Mounted Laser Survey of Birmingham New Street Area Resignalling Phase 7. Neil Archer – Signalling Innovations Group Rob Dutton -
HSSE Policy Z Contractor HSSE Induction V2. HSSE Policy Z Contractor HSSE Induction V2.
Manchester Central Site Induction Aims of this induction: Identifing key information and instruction necessary to work safely at Manchester Central,
Transport Railways Incident Procedures. Aim To give students information about the emergency procedures to be adopted at incidents involving railways.
Line Blockage Guidance for Planners & GZAC
Planning & Delivering Safe Work. /23-May-15 Presentation Title: View > Header & Footer 2 Planning & Delivering Safe Work 10 point plan overview Roles.
Conductor Decertification Discipline
Guidelines for Traffic Control at Surface Mines
RAILWAY INDUSTRY TRAIN PLANNING LEVEL 2 TRAINING Module 7 Engineering Overview.
Created and Presented by Chelsea Jean Leppanen CVTC Safety Coordinator.
RAILWAY INDUSTRY TRAIN PLANNING LEVEL 2 TRAINING Module 2 - Who, What Why?
SafeZone Martin Baker Road Safety Team Leader Poole Borough Council Kevin Jones UK Product Sales Manager Siemens.
Defensive Driving The safety modules may be used by anyone with the understanding that credit be given to AgSafe.
Indonesian Timetabling Conference Introducing Timetabling and Train Control where there a Multiple Operators 31 May 2011.
1  Confirm if a Safe Journey Plan is required before starting the journey.  Discuss the Safe Journey Plan with the Journey Manager.  Understand the.
High Output Track Renewals A Lean Yellow Railway Journey Ben Brooks, Project Director October 2015.
Evaluation of ITS applications on the Køge Bugt Motorway, Denmark Jens Toft Wendelboe Technical Consultant Traffic Management Department Danish Road Directorate.
Learning from incidents: Ufton LC Near Miss ES LXA PICOP.
Back in February, we told you that we were about to start work on further enhancements to Sentinel. Network Rail, the rail industry and trade unions are.
CDM Site Induction SCS FORMULATE HALL 1, RICOH ARENA 15 – 16 NOVEMBER 2016 CDM SITE INDUCTION.
Policies Controlling Risk
Standard 019 Update Briefing
Standard 019 Update Briefing
Why is Rail Safety Important to me?
VTS - Purpose VTS is being introduced to improve the safety of our staff by helping them to drive within the speed limit by providing a system that enables.
Public Conference December
Navigating the 2016 Solar Car Challenge
IRSC 2005 Cape Town - South Africa 9 – 14 october 2005
Ken KUSUKAMI, Ryoichi IMATA Safety Research Laboratory
Road Manager Module National Heavy Vehicle Regulator
Accident investigations: developments and roles
ANNUAL SUSTAINABLE MOBILITY CONFERENCE
Accident investigation: what’s the point?
M1 J32-35a 60mph through Roadworks trial
Safety Technical & Engineering
Croydon Tram Accident 9 November 2016
Warhorse Vacuum Services
Driving in the Interior
OVERVIEW: POSITIVE TRAIN CONTROL (ptc)
Quantitative Methods
Quantitative Methods
Quantitative Methods
Quantitative Methods
Standard 019 Update Briefing
NR/L3/OHS/019-IP Work Instruction Briefing
Fatigue Risk Management
ES PICOP LEARNING FROM INCIDENTS Learning from incidents:
Standard 019 PDSW “One Year On”
ScotRail Alliance Performance Improvement Alliance
Safety Hour Discussion Pack
End of Year Performance Review Meetings and objective setting for 2018/19 This briefing pack is designed to be used by line managers to brief their teams.
Lifesaving Rule: Plant Exclusion Zones (RRV Operations) Key Principles
Dangers of using a mobile phone
Motor Vehicle Incidents 2016 حوادث المركبات
Proposals from the Informal Working Group on AEBS
Rule Book Updates December 2018
Line Blockage Guidance for IWA,COSS or PC
Safety Hour Discussion Pack
Safety Hour Discussion Pack
DPI Must Win Route Best Practice Sharing Updates – Feb17.
Near Miss Incident Pipe Movement
Changes to the Rulebook
Safety Hour Discussion Pack
That person will have been involved in the planning of the work.
Ladbroke Grove Rail Accident
Life Cycle Costing.
Could it happen anywhere?
Presentation transcript:

/ Reducing Risk of Collision within T3 possessions: 5/15mph Brief London North Western

/ Collision at Badminton 31 October 2006 At about 22:54 hrs on Tuesday 31 October 2006 two self-propelled track maintenance machines, a tamper and a ballast regulator, collided near the site of the former station at Badminton, Gloucestershire. The tamper was travelling at about 35 mph (56 km/h), and the ballast regulator was stationary. The immediate cause of the accident was that the driver of the tamper did not control his speed or react to the presence of the stationary regulator on the line ahead, so as to be able to stop short of it. In addition, the following factors were considered to be contributory to the severity of the accident: The custom of OTM drivers of driving at more than 20 mph (32 km/h) in work sites and the the lack of a defined speed limit for movements in work sites.

/ Collision near Logan, East Ayrshire 1 August 2015  On 1 August 2015 at about 11:11 hrs, a freight train travelling within a work site collided with the rear of a stationary freight train at 28 mph (45 km/h). Engineering staff had authorised the driver of the moving freight train to enter the work site at New Cumnock station, travel about 3 miles (4.8 km) to the start of a track renewal site, and bring the train to a stand behind the stationary train.  The immediate cause was that the moving train was travelling too fast to stop short of the rear of the stationary train when its driver first sighted the train ahead. This was due to a combination of the train movement in the work site not taking place at the default speed of 5 mph (8 km/h) or at caution, as required by railway rules, and the driver of the moving train believing that the stationary train was further away than it actually was.

/ Collision between a stoneblower and ballast regulator near Arley, Warwickshire 10 August 2012 At around 04:21 hrs on Friday, 10 August 2012, a stoneblower, collided with a stationary engineering machine, at approximately 22 mph (35 km/h), near Arley, in Warwickshire. The investigation found that when the stoneblower driver sighted the stationary machine he was driving too fast to avoid a collision. Although not a factor in this accident, it is observed that, for driving at night, the 40 mph (64 km/h) maximum speed of travel permitted in engineering worksites is incompatible with the braking and headlight capabilities of the type of engineering machine involved in the collision.

/ Background It was found through investigations into the previous incidents that excessive speed was a contributing factor where collisions within T3 possessions occurred. Currently the rule book states that a speed up to 40mph can be authorised. In response to the RAIB reports there have been numerous national workshops over the past 12 months with the goal to reduce the risk of collisions within T3 possessions. One output from the workshops, initially as an interim measure prior to a Rule book change, was to reduce the authorised speeds both within worksites and PICOP land. Many FOCs have already briefed their drivers and implemented this working arrangement. All FOCs not already instructing their drivers to adhere to 5/15mph within possessions have agreed to do so by 1 st September The LNE route are continuing to trial this method of work. In support of our FOC colleagues, the LNW route will be the first Network Rail route to implement this method of work from the 1 st August 2016 with full support from Martin Frobisher – Route MD. The aspiration is to have the 5mph/15mph limit in worksite/PICOP land respectively introduced into the Rule Book in the December 2016 roll–out but as the current rules dictate a MAXIMUM speed of up to 40 mph (depending on worksite conditions), lowering this maximum speed NOW can only have a positive effect on safety.

/ Within PICOP land All train movements will travel at caution with a speed no greater than 15mph. - Current Ruling as per Module T3 (Driver) You must: make the movement at caution not exceed 40 mph (65 km/h) at any point in the journey when entering, making a movement within, or leaving the possession make any movement in a work site at no greater than 5 mph (10 km/h) unless you are given specific instructions by the ES or SWL on the maximum speed to be applied be prepared to stop before reaching a handsignal that is being displayed. Instructions via Engineering Supervisor Instructions via PICOP Instructions via Signaller Reduction in authorised speed within T3

/ Within Engineering Worksite All train, On-Track Machines and plant will travel at caution with a speed no greater than 5mph. - Current Ruling as per Handbook 12 (ES/SWL) You must tell the driver or MC that the movement must be made at no greater speed than 5 mph (10 km/h) through the site of work if you have agreed this with an IWA or COSS. If you have agreed that the COSS will use lookout warning during darkness or where the site of work is in or near a tunnel, you must instruct the driver or MC that the movement must be made at no greater speed than 20 mph (30 km/h) through the site of work. If you have not made any agreements with IWAs or COSSs to reduce the speed of movements, you may authorise movements to run at any speed up to 40 mph (65 km/h). Instructions via Engineering Supervisor Instructions via PICOP Instructions via Signaller Reduction in authorised speed within T3

/ Impact Clearly there will be impacts on planning and delivery teams due to this change and there may inevitably be late change requirements to ensure this change in possession/worksite speed is as non-disruptive as possible. However, in studies it was found that the vast majority of trains in possessions currently travel at a speed less than 20MPH in PICOP land so the impact of this should be minimal. It is the minority of train/OTM movements that travel with excessive speed as highlighted in the previous collision examples, that this instruction is aimed to reduce. 5mph within worksite will certainly be a challenge and planning of haulage/OTMs along with worksite & possession length needs to be considered.

/ Next Steps - LNW Route implementation 1 st August National FOC implementation 1 st Sept Further reviews/trials to continue throughout - Attendance and presentation to TOMSC/RSSB - Rule book implementation of 5/15mph rule book amendments & national roll out December 2016

/ Feedback  Please discuss on your area planning meetings  Feedback to your manager potential/current issues  A. Briggs or R. Weatherstone who will collate issues for the LNW route and feedback to Project (Safety, Technical and Engineering Directorate) team: Thanks!