MoW&M&P Report Group Name: TP19 Source: MoW Convenor, Enrico Scarrone, Telecom Italia, Meeting Date: 2015-09-07.

Slides:



Advertisements
Similar presentations
Status summary of the ad-hoc discussions 13th of July 2012 oneM2M call.
Advertisements

Copyright © 2008 Software Defined Radio Forum, Inc. All Rights Reserved SDR Forum Document Development Process.
Special Education Student Information System Project New York City Department of Education | Special Education Student Information System Project 1 SESIS.
Joint Legal/Participation Ad-Hoc 21 March 2012 Report.
Release 2: Work Items best practices Group Name: TP15 Source: Scarrone Enrico, Telecom Italia Meeting Date:
Doc.: IEEE /324r0 Submission May 2001 Bruce Kraemer, IntersilSlide 1 PARTNERSHIP PROJECT DESCRIPTION During the meeting held in Copenhagen, 2.
Methods Of Work Ad hoc Report TP#11 Source: Enrico Scarrone, Telecom Italia, Meeting Date:
Doc.: IEEE /1454r7 Submission March 2013 IEEE 802 JTC1 Standing Committee Proposal for SC6 contribution process 20 March 2013 Haasz et al, IEEESlide.
M2M Global Initiative OneM2M April 24, 2012
Report of Methods and Procedures Subcommittee Group Name: Steering Committee Source: Laurent Laporte, Sprint, Meeting Date:
Doc.: IEEE Submission March 2004 Tom Siep, TMS ConsultingSlide 1 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs)
1 Session # Relay TG –Rev.2 Alignment Adhoc Report IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE j-08/141.
IEEE-SA myBallot TM myBallot ™ IEEE Standards Association New Electronic Balloting System Sponsor Tools.
Post Seoul VSWG Update Seoul IRT October Plus code dialing –Reference document #145 approved by WG Pre-paid roaming –drafted white.
Summary of main questions on the Partnership Agreement and the secretariat support End of day 1.
Work Programme Management Ad hoc Group Report Group Name: one M2M TP9 Source: Convenor WPM Joachim Koss, Gemalto M2M,
Timeline for the oneM2M Partnership Project Timeline and Milestones [Joachim Koss, ETSI] Contribution to oneM2M plenary, 05 Mar 2012 Doc: Source: ETSI.
MoW&M&P Report Group Name: TP19 Source: MoW Convenor, Enrico Scarrone, Telecom Italia, Meeting Date:
Guidelines for: Release Maintenance, Small Enhancement and Feature Work Items Group Name: TP15 Source: Mow Convenor, (Scarrone Enrico, Telecom Italia)
International Telecommunication Union ITU Workshop on Standards and Intellectual Property Rights (IPR) Issues Yukio Hiramatsu Chairman, TTC IPR Committee.
Doc.: IEEE /0748r2 Submission May 2011 Tom Siep, CSRSlide 1 Process for Creating TGai Draft Date: Authors:
Report of the oneM2M Legal Subcommittee Group Name: oneM2M Steering Committee Source: Thomas Goode, ATIS, Meeting Date:
Human Resources 1 G-Top Global Workflow Employee View September 2014.
Timeline for the oneM2M Partnership Project Timeline and Milestones [Steve Barclay, ATIS] [Joachim Koss, ETSI] Contribution to oneM2M-Cons#4, 28 Mar 2012.
3GPP2 Publication Process Training TSG-S PMT. December Presentation Overview Background OP Input and Intent Publication Process Overview The Revised.
Geneva, October 9, 2012 GSC16bis-IPR-09 TTC Activities on IPR in Standards October 9, 2012 Yukio Hiramatsu Chairman, TTC IPR Committee Document No: GSC16bis-IPR-09.
WG 2 Progress Report at TP#9 Group Name: oneM2M TP #9 Source: WG2 leadership Meeting Date: /21 Agenda Item: WG Reports.
MoW&M&P Report Group Name: TP18 Source: MoW Convenor, Enrico Scarrone, Telecom Italia, Meeting Date:
Summary of main questions on the Partnership Agreement and the secretariat support.
Release Timeline Discussion R2 and beyond Group Name: TP_WPM Source: Roland Hechwartner, WPM Convenor, Meeting Date:
Release Timeline Discussion R2 and beyond Group Name: TP_WPM Source: Roland Hechwartner, WPM Convenor, Meeting Date:
Timeline for the oneM2M Partnership Project Timeline and Milestones [Joachim Koss, ETSI] Contribution to oneM2M plenary, 14 Mar 2012 Doc: Source: [ETSI]
Doc.: IEEE /0281r1 Submission James D. Allen (Appairent Technologies, Inc.) Project: IEEE P Working Group for Wireless Personal Area Networks.
Doc.: IEEE r0 Submission September 1999 Ian Gifford, M/A-COM, Inc.Slide 1 IEEE Working Group for Wireless Personal Area Networks WG Ballot.
MoW Report Group Name: TP21 Source: MoW Convenor, Enrico Scarrone, Telecom Italia, Meeting Date:
Technical Plenary Terms for the collaboration with P2413 From: oneM2M TP Chair Source: Meeting Date: Agenda Item:
WG5 – MAS#22 Status Report Group Name: WG5 MAS (Management, Abstraction & Semantics) Source: Tim Carey(Alcatel-Lucent, WG5 Vice Chair) Meeting Date:
Methods of Work Report Group Name: TP#10 Source: Enrico Scarrone, Telecom Italia, Meeting.
MoW Report Group Name: TP20 Source: MoW Convenor, Enrico Scarrone, Telecom Italia, Meeting Date:
Doc.: IEEE /1454r0 Submission Jan 2013 IEEE 802 JTC1 Standing Committee Proposal for SC6 contribution process 15 January 2013 Haasz et al, IEEESlide.
31 January Table of Contents (1) 3- Draft Partnership Project Description22- The Partnership Project Agreement (1)3- Draft Partnership Project Description22-
IEC TC93 Liaison Report to DASC Alex Zamfirescu IEC USNC TA TC93 Convener IEC TC93 WG2 September 2004.
IEEE 802 JTC1 Standing Committee Proposal for SC6 contribution process
Global Standards Collaboration (GSC) GSC-15
WG1 status report to TP#15 Group Name: oneM2M TP15
Release Timeline Discussion R2 and beyond
The Standards Development Process
Virtual Network Meeting: Consolidated Application
Office of Grant Resources
IEEE 802 JTC1 Standing Committee Proposal for SC6 contribution process
OASIS Overview TC Process
OASIS Overview TC Process
IEEE 802 JTC1 Standing Committee Proposal for SC6 contribution process
IEEE 802 JTC1 Standing Committee Proposal for SC6 contribution process
IEEE White Space Radio Status Report
FGDC Metadata Working Group Meeting
Memorandum of Understanding
Office of Sponsored Projects
Financial Engineering Modification of the Council Regulation
IEEE IMT-Advanced Review Process
Proposed TGv Selection Process
IEEE IMT-Advanced Review Process
IEEE Standards Development
What is a CA document? Date: Authors: March 2005 March 2005
IEEE 802 JTC1 Standing Committee Proposal for SC6 contribution process
Proposed TGv Selection Process
Update of PWG Process and IP Policy
DSG Governance Group Recommendations.
SAE Standards Works Training Module - Useful Tabs
Presentation transcript:

MoW&M&P Report Group Name: TP19 Source: MoW Convenor, Enrico Scarrone, Telecom Italia, Meeting Date:

MoW Activities – 3 calls held from the last SC meeting jointly with M&P – MoW activity was concentrated to give guidelines about the transition workflow among subsequent releases, in particular the relation about the 3-stages starting date relations. The result is included as a new sectionat the end of the updated MoW in TP (v1.3.2), presented for approval at this TP 19. © 2015 oneM2M Partners TP MoW_M&P_Report_at_TP19 2

M&P Activities – Update of M&P DRAFTING RULES -submitted for approval at SC 27 (SC ) but sent back for revision, planned to be submitted at TP 28 (30 th of September).SC Editorial updates – adding TSDSI, change copyright date. Removal of the mathematical formulae print screens as this option is no longer available in MS Word, Updated paragraphs to remove the possibility of hanging paragraphs Clarifications on normative references and editors notes Added information on Test Methods descriptions Updated the definitions, to assure that the definitions are identified with a capital initial letter © 2015 oneM2M Partners TP MoW_M&P_Report_at_TP19 3

M&P Activities – New partner type for member based organizations - current understanding: 1) A new type of partnership for member based organizations and government agencies (PT3, or associated partners as appropriate) 2) No financial and IPR obligations 3) No possibility of direct technical contribution for the organization and its members (still possible to collaborate via liaisons and have contribution via oneM2M members/PT2) 4) No need to sign the PA (separate document or , as appropriate) 5) No rights of vote at SC and TP 6) Rights to attend TP and SC 7) PT3 needs to be approved by SC 8) No need for PT1 and PT2 to sign again the PA, the approval is made during SC meetings or by 9) The PT3 have the right to refer to oneM2M in their document in their Webste, etc. partnership 10) The PT3 have the obligation to agree on the principle of oneM2M as described in the PA and support actively the promotion and visibility of oneM2M. © 2015 oneM2M PartnersTP MoW_M&P_Report_at_TP19 4

M&P Activities – New partner type for member based organizations -open issues 1) Clarification of requirements (which are re potential interested organizations?, what are their expectations?) 2) Is there a real difference respect to the rights/obligations of associated members? 3) A new type of membership (e.g. sponsor members) could be enough? © 2015 oneM2M PartnersTP MoW_M&P_Report_at_TP19 5

Future planned work – Next calls jointly with MoW: 14 September 1015 ( Focus on new partner type) 21 September 1015 ( Focus on capitalization of definitions) Other two calls before TP20 are foreseen.. © 2015 oneM2M Partners TP MoW_M&P_Report_at_TP19 6