1Proprietary and Confidential GERAN WG3 #70 Meeting Report - Plenary Presentation – GP-160348.

Slides:



Advertisements
Similar presentations
World Class Standards TC SCP TEC Status Report to TC SCP Plenary #49 Paul JOLIVET, Chairman, LG Electronics Sebastian HANS, Vice chairman, Oracle SCP(11)0177.
Advertisements

ETSI TC SCP WG TEST Status Report to TC SCP Plenary #49
EP E2NA Meeting # 6 –Wrap up Closing plenary notes, Jun 20, 2013 Co-Located meetings E2NA plenaries and WGs M493 #15 NTECH #3 INT #21 AFI #13 DECT #57.
'eCall: Next Steps for Deployment' Competititiveness of European Automotive Software Industry WS Brussels, 28/04/10 Emilio Dávila González
The MCC Specs database A guided tour. The Specifications panel …
7 Feb 2000JMM1 Editing a GSM spec - tips for experts.
All you always wanted to know about 3GPP … but were too afraid to ask.
TC SCP REQ STATUS REPORT TO PLENARY #63 Davide Pratone, Chairman, Telecom Italia SCP(14)
TV-Anytime Kobe Metadata Phase 1 3rd Plenary November 2003.
SECURITY SIG IN MTS 28 TH JANUARY 2015 PROGRESS REPORT Fraunhofer FOKUS.
Copyright © 2004 Juniper Networks, Inc. Proprietary and Confidentialwww.juniper.net 1 ANCP protocol draft updates draft-ietf-ancp-protocol-00.txt ANCP.
TST WG Progress Report at TP 17 Group Name: TST WG Source: TST WG Chair, JaeSeung Song (KETI) Meeting Date: to , Sapporo, Japan Agenda.
The life-cycle of a 3GPP Spec Abridged for family viewing.
GSC-8xxx SOURCE:TIA TITLE:IPR Working Group Report AGENDA ITEM:Closing Plenary Agenda Item 1.1 DECISION DISCUSSIONX INFORMATIONX 21/10/2015 Report on the.
Protocol Testing GSM /GPRS Protocols: MM, CC, RR,Physical Layer, RF & NAS UMTS Protocols: NAS, RRC,RLC,MAC,BMC,PDCP, Physical Layer, RF,QoS Core specs.
TP#13 oneM2M testing discussion TP#13 Source: Laurent Velez, ETSI, Meeting Date:
1 LTE standards Status for this work in 3GPP and what next for the Future Francois COURAU 3GPP TSG RAN Chairman.
Doc.: IEEE /0154r0 Submission January 2014 S. Rayment, Ericsson & S. McCann, BlackBerrySlide 1 3GPP Liaison Report Date: Authors:
WPM ad-hoc group report TP#17 closing Group Name: WPM (TP adhoc) Source: convener WPM Roland Hechwartner, Meeting Date:
MCC TF160 / SS VENDORS SESSION 3GPP RAN5#69 16 th – 20 th November 2015 Anaheim, USA R5-15xxxx MCC TF160 © ETSI All rights reserved.
Status of Active Work Items Level of Completeness Group Name: WPM Source: Roland Hechwartner, WPM Convenor Updated:
ITU-T Study Group 13 and L1 VPNs Marco Carugi ITU-T SG13 Liaison Officer to IETF CCAMP/VPN WGs Q.2/13 Rapporteur
Doc.: IEEE /1292r0 Submission November 2008 George Bumiller, Research In MotionSlide 1 3GPP use of the TGu Interworking with External Networks.
The lifecycle of a GSM spec Or All you ever wanted to know about where little GSM specs come from.
Kapsch CarrierCom ||Titel der PräsentationUntertitel der Präsentation WG FM Correspondence Group on GSM-R ETSI & GERAN update on ER-GSM band.
Kapsch CarrierCom ||Titel der PräsentationUntertitel der Präsentation ETSI RTEGSM-R #18 ETSI & GERAN update on ER-GSM band introduction 27.
LTE Standards Strategy for Public Safety Andrew Thiessen.
A LOOK AT AMENDMENTS TO ISO/IEC (1999) Presented at NCSLI Conference Washington DC August 11, 2005 by Roxanne Robinson.
WG5 – MAS#24 Status Report Group Name: WG5 MAS (Management, Abstraction & Semantics) Source: Yongjing Zhang (Huawei, WG5 Chair) Meeting Date:
Status of Active Work Items Level of Completeness
Jürgen Großmann, Fraunhofer FOKUS
.
CT WG6 status report to TSG CT #75
Status Report RAN WG6 to TSG-RAN #73
WG2 - ARC TP#29 Status Report
3GPP interworking in R3 Group Name: ARC
Security Activities in ETSI
WPM ad-hoc group report TP#24
Status Report RAN WG6 to TSG-RAN #73
WPM ad-hoc group report TP#25
WG5 – MAS#27 Status Report Group Name: WG5 MAS (Management, Abstraction & Semantics) Source: Yongjing Zhang (Huawei, WG5 Chair) Meeting Date:
WG2 - ARC TP#29 Status Report
MCC TF160 Status Report (Pre-RAN5#75)
WF on measurement capability and measurement gap for NR
3GPP RAN WG5 Chair Phil Brown NTT DoCoMo Inc. R
OmniRAN Introduction and Way Forward
3GPP RAN WG5 Chair Phil Brown NTT DoCoMo Inc. R Draft v2
Shanghai, China, April 11-15, 2011 Source: Qualcomm Incorporated
Motivation for WI on "LTE-based V2X Services"
WF on LTE-NR DC with UL coexistence
Report from TSG GERAN2#21bis St Paul’s Bay, Malta, 4th – 8th October 2004 Diana Edwin, Siemens 3GPP TSG GERAN WG2 Chairman +44 (0) ,
July 2010 doc.: IEEE /0xxxr0 A summary of draft LS from 3GPP in response to IEEE 802 LS in March May 2017 Authors: Name Company Phone.
LTE M and NB IoT Crash Course
3GPP Status.
Presentation to TGax relating to coexistence efforts in Coexistence SC
Security Activities in ETSI
Liaison statement and Request for Specification and Implementation of Harmonised Pan-European Emission Limits relevant for the GSM-R Operating Range.
Update on Reporting Information point 10
July 2010 doc.: IEEE /0xxxr0 A summary of draft LS from 3GPP in response to IEEE 802 LS in March May 2017 Authors: Name Company Phone.
IEEE IMT-Advanced Review Process
IEEE Coexistence SC closing report in St Louis in Jan 2019
OmniRAN Introduction and Way Forward
IEEE IMT-Advanced Review Process
Report on Date: Authors: July 2016 July 2013
NGV SG Closing Report – Bangkok, Thailand
GERAN update on ER-GSM band
Report on Date: Authors: July 2016 July 2013
AANI SC Agenda Dec Teleconference
'eCall: Next Steps for Deployment' Competititiveness of European Automotive Software Industry WS Brussels, 28/04/10 Emilio Dávila González
ETSI BRAN Update (IEEE Co-Existence Workshop)
Presentation transcript:

1Proprietary and Confidential GERAN WG3 #70 Meeting Report - Plenary Presentation – GP

2Proprietary and Confidential Participation  X companies/organisations took part in this F2F Meeting  XX CRs were agreed.  Agreed CRs pre Spec  Agreed CRs for the last 3 meetings per meeting 4 LS were received during this meeting, 1 reply LS was sent. General Information – GERAN WG3 Numbers

3Proprietary and Confidential For the first time in GERAN History, no maintenance CR was received Work Progress – Maintenance

4Proprietary and Confidential GP New Work Item on Extended DRX (eDRX) for GSM – MS conformance testing part GP – Final version of Work Plan – GP GP-160 – TS Default condition section amended with eDRX/PEO – 1 TC on PEO Reduced Monitoring removed following TS essential corrections – 1 TC on PEO Reduced Monitoring updated following TS essential corrections – 10 new TCs covering reselection, paging, NAS, mixing with PSM and Extended UL were added. – Overall Completion: 100 %- Completed GP New Work Item on UE Power Consumptions Optimizations (UEPCOP) - MS conformance testing part GP – Final version of Work Plan – GP GP-160 – 5 NAS TC were added (and one « PSM/eDRX » paging TC in eDRX Work Plan) – Overall Completion: 100 % - Completed Work Progress – Active Wis1/2

5Proprietary and Confidential GP-15xxxx New Work Item on Extended Coverage GSM (EC-GSM) for support of Cellular Internet of Things – MS conformance testing part GP-15 – Initial version of Work Plan – GP GP-160 – Analysis of the requirement up to GERAN #69 completed, XX TCs identified (RF, selection/reselection, RLC, MAC, no NAS) – XX TCs and most of the EC default testing configuration drafted. – Overall Completion: 40 % - Target Completion RAN5#72 (August) Work Progress – Active Wis2/2

6Proprietary and Confidential Follow up to the ETSI LS received in Anaheim (GERAN#68, GP LS on the transposition of HS for GSM MS under the RE-D from ETSI MSG) :  the GERAN WG3 delegation was made aware that the EN was updated, and is under approbation, to comply with the new EU RE-D Directive. GSM receiver requirements were added. Others

7Proprietary and Confidential Incoming (3) – GP LS on Test Case Optimisation - optimising LTE Inter-RAT protocol (GCF CAG) GP- – GP LS on Test Case Optimisation - optimising of extreme testing - 2G (GCF CAG) GP-1 – GP LS on Test Case Optimisation - optimising of extreme testing - 3G (GCF CAG) GP-1 – GP LS on Clarification of GERAN3/RAN5 Test Cases and Timelines for LPWA IoT Solutions (MIoT GSMA) GP-1 Outgoing (1) – GP Reply LS on Clarification of GERAN3/RAN5 Test Cases and Timelines for LPWA IoT Solutions Liaison Statements

8Proprietary and Confidential Next meetings MeetingDatesLocation RAN WG5 #7222 – 26 August 2016Gothenburg, Sweden

9Proprietary and Confidential The King (GERAN3) is dead, long live the King (RAN5) !