Handling Discussions LAGUNA-LBNO/Layout Study Group - Friday 19/7/2013 Keith Kershaw EN-HE.

Slides:



Advertisements
Similar presentations
F&T Inc. OVERHEAD CRANE SAFETY.
Advertisements

CMS ZDC Crane Emergency Payload Removal Procedures This document proposes the viability of using a portable hydraulic actuator Hand crane (Davit crane)
Best Practices for Remote Assembly and Maintenance Keith Kershaw, Sources, Targets and Interactions Group Thanks to: Alessandro Tesini and Jim Palmer of.
MODULE TRANSPORT CLIC Module Working Group 27 September 2010 Keith Kershaw CERN EN-HE.
FHM TRAINING TOOLS This training presentation is part of FHM’s commitment to creating and keeping safe workplaces. Be sure to check out all the training.
1 ZDC Status, 9th December ‘07 Fitting in the TAN slot Getting in and out of the TAN Schedule Trigger Yasar Onel (Michael Murray) for ZDC group.
TCC2-TDC2 working group Handling means for the TAX repairs JL GRENARD EN-HE 21th September 2011.
R. Rinaldesi, K. Kershaw – HE Group
Collimation Remote Handling Highlights from work for collimation remote handling and remote survey. Plans Keith Kershaw EN-HE 14 June 2011.
Remote Handling design progress for the Collimation Upgrade project Keith Kershaw EN-HE 6 June 2011.
Warm magnets and the remote handling system in the J-PARCν beam line E. Hirose, K. H. Tanaka, Beam Channel Group.
HIGH RADIATION TO MATERIALS: EXPERIMENTAL AREA DESIGN Ans Pardons HiRadMat review, 26 th of May 2011 Outline  Location of experimental area & services.
Addendum to EDMS document “Instruction Manual for inserting the CMS ZDCs using the HXTC crane” In addition to the ZDC detectors in the TAN instrument.
E8 / PPA Solar PV Design Implementation O&M Marshall Islands March 31-April 11, Field investigation Installation site confirmation Roof-mounted.
ZDC/Dummy Absorber Exchange Crane Proposal Paul Debbins Ianos Schmidt Univ. of Iowa - Nov. 5, 2007.
October 21, 2003H.J. Krebs1 LST Mechanical Design Review Handling & Installation Fixtures Design and Fabrication Status H.J. Krebs October 10, 2003.
CMS ZDC Remote Exchange Crane Paul Debbins University of Iowa June 26, 2008.
NuMI NBI2006 September 9, 2006 NuMI Repairs for Hot Components Jim Hylen / FNAL Page 1 NuMI Repairs for Hot Components (1 sievert = 100 rem) Problem On.
MARS 2 Design Review-Optomechanical Review 07 Nov 2002 GLW1 MARS 2 Mechanical Design Review.
Transport and handling at CERN for FAIR
LIU – TCDI. INTEGRATION STATUS 1 ST APRIL 2015 Frédéric Galleazzi EN/MEF/INT Antoine Kosmicki EN/MEF/INT EDMS :
1 Target Station Design Dan Wilcox High Power Targets Group, Rutherford Appleton Laboratory EuroNu Annual Meeting 2012.
REMOTE-HANDLING OVERVIEW I. Bailey Cockcroft Institute / University of Liverpool.
STATUS REPORT: ALIGNMENT OF COLLIMATORS P. BESTMANN /O. ABERLE Collimation Working Group 26/09/2011.
GLAST LAT ProjectMarch 08, 2004 Page 1 ACD Installation, Post LAT CDR Response to GLAST LAT CDR RFA Number 13: MGSE Detailed Dimension Study [for ACD Installation]
Status of LS1 collimator maintenance O. Aberle – 03/03/14 With input from P. Bestmann, S. De Man and J. Lendaro.
Transport of the CLIC Modules and Elements CLIC Workshop October 2007 Two Beam Hardware and Integration Working Group Keith Kershaw (CERN)
Transport and Handling (T&H) considerations for HL-LHC
1 Target Station Design for Neutrino Superbeams Dan Wilcox High Power Targets Group, Rutherford Appleton Laboratory NBI 2012, CERN.
Columbus McKinnon Corporation 125 years old. Publicly traded. More than a hoist and chain company.
GLAST LAT Project Page 1 ACD Installation, Post LAT CDR Response to GLAST LAT CDR RFA Number 13: MGSE Detailed Dimension Study [for ACD Installation] –A)
ILC TRANSPORT AND INSTALLATION Questions from last CES: Beam height explanation, Transport implications of sloping access tunnels proposed for access to.
Transport & Handling of Detectors TAN Workshop S. Prodon –
HIGH RADIATION TO MATERIALS: EXPERIMENTAL AREA HiRadMat Users meeting, 14/7/2011 Outline  Location  Test zone  Test tables geometry and position  Services.
Cryostat & LHC Tunnel Slava Yakovlev on behalf of the FNAL team: Nikolay Solyak, Tom Peterson, Ivan Gonin, and Timergali Khabibouline The 6 th LHC-CC webex.
Additional muon stations for the Upgrade of the Elevator Regions in the ATLAS Muon Spectrometer. Installation scenario, status on the installation tools.
CLIC MODULE TRANSPORT AND INSTALLATION Keith Kershaw CES, 8 October 2008.
LHC Cryostat evaluation Nikolay Solyak Thanks Rama Calaga, Tom Peterson, Slava Yakovlev, Ivan Gonin C11 workshop. FNAL, Oct 27-28, 2008.
An Integrated Remote Target Handling System for CERN’s MEDICIS Radioactive Isotope Production Facility Keith Kershaw, Stefano Marzari, Jean-Louis Grenard.
 Reduce costs.  Reduce damage.  Increase space and equipment utilization.  Increase throughput.  Increase productivity.  Improve working conditions.
SECONDARY BEAM HANDLING AND INFRASTRUCTURE DESIGN STATUS BRUNO FERAL (CERN/EN) DIAMANTO SMARGIANAKI (CERN/EN) Project Leader: I.Efthymiopoulos (Cern/EN)
Integration Prototype1 BaBar Integration as a Prototype for SuperB Bill Wisniewski SuperB Workshop at LNF 6 April 2011.
PRELIMINARY VERSION Mechanical integration in the ESS Accelerator tunnel HENRY PRZYBILSKI.
High Energy Dump of the Super Proton Synchrotron at CERN – Present and Future designs A. Perillo-Marcone (EN-STI) Contributions from several colleagues.
LBNE Remote Handling Layout Options Adam Carroll Van Graves Tom Burgess FNAL/ORNL Videoconference March 11, 2010.
Sébastien MICHALMarch Sébastien MICHALMarch 2009 EES 1 GROOVE EES 1 laid on table to be milled EES 1 laid on table to be milled –Move horizontally.
Final Concept Lead Filter Movement System Dennis Haasler EN-MEF-EBE.
Remote Measurement and Alignment Applications for Survey and Alignment P. Bestmann for BE/ABP/SU
1 Target Station Design Dan Wilcox February 2012.
Kitakami Side AHCAL Assembly or anywhere in any detector.
TPC Support Installation 26 Apr 2016Dan Wenman Mechanical Engineer1 Overview Installation of the support rails Details of the rail from the SAS to the.
Hire Different Varieties of Lifting Gear in UK
CLIC Handling Engineering Update
HL-LHC IT STRING and Series test of SC link
ProtoDUNE – DSS Installation, Alignment and QA
Installation step 4. (3 days)
Press “Space” to start presentation
EN-HE SPS works during EYETS
Planned activities on collimator for LS1
IT-4328: Technical Specification
LUCID Mechanical support and cooling proposal Status of the current design development Erik Richards, Raphael Vuillermet December 10th 2013.
Linac4-PSB 160 MeV connection readiness review ( TE/VSC )
Magnet electrical and hydraulic (dis)connections for coating
nTof pipe cutting proposal Robotic platform design
TEST PLANS for HL LHC IT STRING
F&T Inc. OVERHEAD CRANE SAFETY.
Cryomodule Assembly Plan
BGC Collaboration Meeting –
CDS-EL IRR Closeout 28 March 2019 J.G. Weisend II, Chairman.
MRV system budget and scheduling Short overview installation
Presentation transcript:

Handling Discussions LAGUNA-LBNO/Layout Study Group - Friday 19/7/2013 Keith Kershaw EN-HE

Introduction These slides follow up initial discussions of handling with Ilias. Ilias’ proposal: target and horn to be installed in 18% slope tunnel

Some Recommendations for Remote Handling (ITER) – of interest at concept stage Consider RH compatibility from earliest stage of development cycle Prefer vertical load transfer during installation and removal Use of a crane provides compliance in 5 d.o.f. (helps self alignment) Provide for self alignment (into position and with handling equipment) – typically use of cones Keep operations simple Recovery techniques vital Provide space for handling trajectories and for vision Provide visual clues for gross alignment motions Protect sensitive equipment

LHC Collimators: First mock up tests Collimator mini workshop 17,18 Nov Dummy collimator installed on base using modified truck loader crane fitted with hoist and spreader rotation. Operation with camera viewing and remote control

Reserved space for collimator handling LHCHMUMC_0001 Implications for infrastructure Implications for collimator dimensions It was necessary to modify water pipes 5Collimator mini workshop 17,18 Nov 2010

Plug – ins: Careful guidance during LHC installation 6Collimator mini workshop 17,18 Nov 2010

Plug-in behaviour tests 2010 Practical Investigations in mock-up by EN-STI, EN-MME and EN- HE. 7Collimator mini workshop 17,18 Nov 2010

Cryoline protection Collimator mini workshop 17,18 Nov At end of crane boom Behind collimator

Remote collimator handling crane

ITER Monorail Crane (Neutral beam remote handling system)

Monorail Design Support Rails – Including Power & Control conductor bus Central I beam rail has been developed to have a wider hollow vertical section to resist the torsion introduced in eccentric load conditions Stabiliser rails react eccentric loads Rails contain bus bar power connection lines Cross-beams

Design Layout Hoist DrumHoist Drive Bogey with twin travel drive Support Wheel Cable Reeler Equaliser Block Emergency Brake Power & Control Collector Trolley Power and control plug for lifting adaptors Twist-locks Hoist Assembly

Monorail Support Rails Drives and linear slides Switch System

Twist locks Any questions?

EXTRA SLIDES

Crane, BLT and BS RHE

ITER Remote Handling Beam Line Transporter

SOME IMPLICATIONS OF TRANSPORT AND INSTALLATION ON COLLIMATOR AND INFRASTRUCTURE DESIGN Lift points – Adjustable and blocked for C of G Dimensions – Respect transport zone when installed (covers to manage cables and hoses) – Respect Space next to other beam pipe and infrastructure Plug-ins – Compatible with vertical lowering when collimator suspended from single support point Vacuum – Clearance when lowering on pins ( + remote disconnection…) Infrastructure – Respect space required for handling (see LHCHMUMC_0001) 18Collimator mini workshop 17,18 Nov 2010