Snag Boat Midterm Presentation  Eric Speight  Matthew Funk  Courtney Johnson.

Slides:



Advertisements
Similar presentations
SHIP LOAD DIAGRAMS A ship may be regarded as : Non-uniform beam
Advertisements

Chapter 6 Cranes Crane Operation • Industrial Cranes • Mobile Cranes • Crane Inspections.
Mast Storage Rack NNSY Sean Ellis, Philip Crist, Max Carpenter, Gershom Obeng.
Jimmy E. Fowler Coastal and Hydraulics Laboratory
Cranes and Slings Major Causes of Crane Accidents
ENG-1010 Lecture 16 Bridge Design.
Ship’s measurement Lesson 3.
Moments of Inertia Polar moment of inertia – Used when calculating the torsion – Indication of resistance to torsion – Solid Shaft – J = π R 4 / 2 Area.
EQUILIBRIUM OF RIGID BODIES
Bridge Engineering: Lessons from Rome to Tacoma
Water, Waves, and Ships Science. Learn About: Science Water, Waves & Ships - Re-supplying at sea - Severe weather at sea - Stability in wind and waves.
Crane Operations Objective
CTC / MTC 222 Strength of Materials Chapter 1 Basic Concepts.
ENGR-1100 Introduction to Engineering Analysis
Calculating Buoyancy (# Pennies) Penny Barge Design
Shipbreaking Module 4: Heavy Equipment & Material Movement 4.1 Hoisting, Emergency, Inspect Susan Harwood Grant Number SH F-23.
SS Cape May’s CAF Crane. Project Advisor: Dr. Han Bao Team Shannon Ershen Alonza Frazier Stanley Reese.
Overhead Crane Safety.
1 Cranes Module 13. 2Objectives After this module you should be able to – identify the most common crane hazards – take the necessary steps to avoid those.
1st Quarter Contractor Business Meeting March 13 th, 2015 Yesika L. Kain/Ben Mulherin Plant Engineering Facilities Session.
CHS PROBLEM SOLVING
SHIP STRUCTURES Unique Structures (6.1) What are they optimized for?
Lecture # 2 Allowable Stress Objective:
STABILITY PROBLEMS NO. 1.
Introduction Problems of Castings R+D Assortment Registrations Summary VICONTEX Ltd. has been developing and producing steel containers’ elements since.
Integrated Civil Engineering Design Project (Building Structure Design Example) CIVL 395 HKUST By : Ir. K.S. Kwan Date: 4/07.
Office of Research and Engineering Finite Element Analysis Carl R. Schultheisz.
Composite Beams and Columns
Page1 Canal Boat Captain The year is 1848 and you are a canal boat captain. It is your job to transport a boat full of goods from Fort Wayne, Indiana to.
CRANE TIP OVER Date: May 12 th, INCIDENT A galloway was being pre-assembled to determine proper fit. It was then to be disassembled and sent underground.
Courtesy of Holbert Apple Associates Georgia Avenue Building Introduction Statistics Gravity System Lateral System Problem Statement & Solution.
Intake & Exhaust Team James Hogge Rebekah McNally Alisa Phillips Henos Woldegiorgis Front Upright Analysis Joseph Perry Rear Upright Analysis Taylor Watkins.
SunTrust Tenant Improvements June 30, Background Current Situation Proposed Work Cost of Proposed Work Questions Presentation Outline.
Floors and Double Bottoms
1 Differences Between BRASS and AASHTO Standard Spec Engines Virtis Opis BRIDGEWare Users Group Meeting 2011 Helena, Montana.
FOOTINGS. FOOTINGS Introduction Footings are structural elements that transmit column or wall loads to the underlying soil below the structure. Footings.
Lecture #4 Equilibrium of a Particle and Intro to Free Body Diagram (ref: Chapter 3.1, 3.2) ΣFx = 0 ΣFy = 0 ΣFz = 0 Required for Static Equilibrium!! R.
INDE 6332 ENGINEERING PROJECT MANAGEMENT CHAPTER 3 Part 2 University of Houston Dept. of Industrial Engineering Houston, TX (713)
MAE126B Report Writing Lecture Refer also to MAE126A Report Writing Lecture.
Chapter 1: Stress Review important principles of statics
Petroleum Engineering 406 Lesson 9b Station Keeping.
6.5 Space Trusses A space truss consists of members joined together at their ends to form a stable 3D structure The simplest space truss is a tetrahedron,
Deck Beams. athwart ship member located under the deck plating usually fitted on every frame more desirable to fit extra beams then to increase thickness.
Marine Debris Collector Green A: Sketch Model Review.
BARGE DAVY CROCKETT RESPONSE
Tides. Tides The rise and fall of the ocean water levels along the coast are called tides. The amount of water in the ocean doesn’t change but moves in.
Chapter 12: Properties of Matter
Chapter Twelve: Properties of Matter  12.1 Properties of Solids  12.2 Properties of Fluids  12.3 Buoyancy.
Kngreddykngreddy Marine Engineering Technology & Solutions Pvt. Ltd.
Static Analysis Static Analysis, Internal Forces, Stresses: Normal and Shear 1.
Hjj Ship Stability RONALD M H Ronald M H.
INTRODUCTION SUPPORT STRUCTURSE FORCE - LONGITUDINAL FORCE - TRANSVERS
Ship Computer Aided Design MR 422. Outline 1.Classification and Regulation. 2.Tooling and Manufacturing. 3.Maintenance and Repair. 4.Levels of definition.
What Makes Up a Ship?.
Arlington Gateway Hotel 801 North Glebe Road Arlington, Virginia Michael Gray Penn State University AE Senior Thesis Presentation 2005.
3. Longitudinal strength calculation
Floor Framing.
Accidents Case Studies
Snag Boat Final Presentation
3-D Printed Pressure Vessel Design to Maximize Volume to Weight
WALL Barrios Laura Bigott Dairet
SBN Far Detector Installation & Integration
What is Buoyancy?.
Stick Together & Civil Structures
Know the Problems Associated With your Pool Pump
Bridge Engineering: Lessons from Rome to Tacoma
Measuring Mass and Calculating Density
Schilick’s formula for Calculating ships Hull frequency
Using the Rated Load Chart
A Numerical Modeling Approach of Composite Riser Hoses Amaechi Chiemela Victor 3rd Year PhD Student – Engineering Department Supervisor: Prof. Jianqiao.
Presentation transcript:

Snag Boat Midterm Presentation  Eric Speight  Matthew Funk  Courtney Johnson

Outline  Introduction  James River Reserve Fleet  Background  Use of Snag Boat  Problem  Solution / Proposal  Proposed Approach  Accomplishments  Center of Mass Calculation  Buoyancy Force Calculation  Structural Properties  Gantt Chart  Complications  Questions

Introduction  What is a Snag boat?  Traditional use of the ROS Snag boat was to clear debris from rivers for safe navigation.

Introduction  During its ownership by the USACE the crew would be deployed for extended periods of time.

Introduction  JRRF acquired the vessel in March  Cost of transferring the vessel was $750,000

JRRF BACKGROUND  The JRRF is located at FT. Eustis in Virginia.

JRRF USE OF ROS SNAGBOAT  To maintain and inspect moorings. e.g. Anchors, chains.

JRRF USE OF ROS SNAGBOAT  A barge along with the snag boat was used to place and inspect moorings.  Moorings are of tremendous weight.

Problem..  Catastrophic failure due to an excessive load.  Crane failed. Example of stresses in boom

Problem..  Picture of Current snag boat.

Problem….  Non-operational snag boat due to broken crane  No usable space for the JRRF

Solution! / Proposal  Make the vessel more usable  Remove second level  Remove portion of first floor  Move wheel house to rear on first floor  Relocate crane to accommodate deck space for mooring inspection.  Assure that integrity of vessel is uncompromised

Solution / Proposal

PROPOSED APPROACH  In order to maximize deck space, we needed to remove the living quarters on the boat.  This means removing the entire second level, the front half of the first level and then taking the third level and pushing it further back.  If these modifications were made they would double the amount of deck space reducing the stress on the crane.  Once again the stress is reduced by improving the angle of the boom.

 Developed website  Center of mass before and after modifications  Buoyancy force  Gathered information regarding structural analysis of ships  Determined beam properties applicable to our ship What we have accomplished website Beginning calculations/gathering information CAE model

Baseline (82.1,5.3,21) Proposed(81.9,4.74,21) Center of Mass Calculation

 Buoyancy is an integral part of determining still water moment  1170 tons Buoyancy Force Calculation

 information for all L beams on ship  Steel plating thickness, weight, etc. Structural Properties

Gantt Chart

Complications  No clear directions from the JRRF ◦ Point of contact is constantly changing  Conflicts between schedules

More Complications How do we do this! Lack of experience about how to perform necessary calculations

 Once we have calculated what we need, how do we determine what is structurally sound?  Need to read ◦ Det Norske Veritas, American Bureau of Shipping, and Lloyd's Register EVEN…..More Complications

What’s Next…  Take the information gathered; apply it to the boat  Use Patran/Nastran to see if structural renovations are possible

Any Questions??