Sherwin Williams Victorville Facility. Manuel Jimenez Jr.-EHS Manager SW Victorville Introduction.

Slides:



Advertisements
Similar presentations
Managing the Health and Safety of Contractors
Advertisements

Radiopharmaceutical Production
Course Material Overview of Process Safety Compliance with Standards
OSHA’s Voluntary Protection Program (VPP) Job Hazard Analysis Mishap reporting 1 This class is only intended to familiarize you with the programs in place.
Job Loss Analysis Overview
Process Safety Management of Highly Hazardous & Explosive Chemicals Operating Procedures, Safety Procedures & Training.
HAZARD COMMUNICATIONS / E N V I R O N H & S T R A I N I N G P R O G R A M HAZARD COMMUNICATION PROGRAM OSHA Standard 29 CFR The OSHA hazard communication.
Hazard identification and Risk assessment
School Safety Training
EnvironmentalSafety 2.01 Understand safety procedures 1.
Effective Workplace Safety Inspections OFFICE OF RISK MANAGEMENT LOSS PREVENTION UNIT.
Safe Working Procedure – First Aid Learning Objectives: By the end of this program participants will be able to demonstrate their understanding of the.
Controlling Risk by Managing Change Jessica Blaydes & Gary Fobare Honeywell Aerospace 2013 Region IX Workshop.
Permit to Work Procedure Document Number: KOC.SA.004
SOP Standard Operating Procedure This workforce solution was funded by a grant awarded under the President’s Community-Based Job Training Grants as implemented.
4.1 Student Book © 2004 Propane Education & Research Council Layout, Design and Selection of a Vapor Distribution System 4.1.
3.6.6 Student Book © 2004 Propane Education & Research CouncilPage 1 In the wake of the September 11 th attack and continuing terrorist threats, shippers,
The Job Hazard Analysis Dawn Johnston Bob Siktberg March 18, 2011.
BRC Food Safety Quality Management System Training Guide
Hazardous Waste and Emergency Response
Process Safety Management
© 2011 Michigan State University and United Nations Industrial Development Organization, original at CC-BY-SA Procedures FSKN.
Hazard Communication Training Program “Right-to-Know” Program.
4.2.8 Student Book © 2004 Propane Education & Research CouncilPage Installing Aboveground ASME Tanks Installing aboveground tanks is an important.
© 2012 Delmar, Cengage Learning Chapter 13 Regulatory Overview OSHA, PSM, and EPA.
October Training 8 HR Ref. Content Overhead Utilities Risk Assessments Task Safety Environmental Analysis Health and Safety Plan Components of a HASP Questions?
SAFETY MANAGEMENT PROCESS Anne M. Bevington, Coors Brewing Company Safety Management Process – Proactive safety metrics that drive.
Job Safety Analysis (JSA)
Mechanical Integrity Written Procedures. Lesson Objectives  Describe Required Written Procedures for Establishing an MI Program  List Acceptable Sources.
Hunt’s Taylor Creek Contractors Training on new Hazard Communication Standard 29 CFR
Division of Risk Management State of Florida Loss Prevention Program.
Safe Working Procedure – Personal Protective Equipment Learning Objectives: By the end of this program participants will be able to demonstrate their understanding.
2011 PLANT OPERATIONS MODULE 8 Maintain Bulk Plant Systems and Equipment.
What is a safe work permit? A safe work permit is a written record that authorizes specific work, at a specific work location, for a specific.
SULFURIC ACID SAFETY FOR EMPLOYEES CORPORATE SAFETY TRAINING
Risk Management Program. Program 2 requirements v Initial startup v Normal operations v Temporary operations v Emergency shutdown and operations 1a.
Revised Spring 2007 Hazard Communication And Your Right - To - Know Dept of Environmental Safety Services.
Lesson 1-5 Chemical, Fire, and Electrical Safety.
Retrofitting and Maintenance. Regular Maintenance is Necessary Failure to Perform Maintenance Leads to….. Diminished Performance Deterioration Failure.
Development, Validation, Implementation and Enhancement for a Voluntary Protection Programs Center of Excellence (VPP CX) Capability for the Department.
Department of Defense Voluntary Protection Programs Center of Excellence Development, Validation, Implementation and Enhancement for a Voluntary Protection.
Learn Integrated Management System Documentation Process with Ready-to-use EQHSMS Documentation Kit
Department of Defense Voluntary Protection Programs Center of Excellence Development, Validation, Implementation and Enhancement for a Voluntary Protection.
Work Place Committees and Health and Safety Representatives Training Module 5 – INPECTIONS, WORK PLACE HAZARDS, TASK HAZARD ANALYSIS.
Department of Defense Voluntary Protection Programs Center of Excellence Development, Validation, Implementation and Enhancement for a Voluntary Protection.
- HEMIC Facility Inspections. Common Losses A fire breaks out in a 16 story office building An employee had the tips of two fingers amputated Could these.
Bellwork List 3 dangerous chemicals that you have at home and what you would do if a family member accidentally ingested them.
Bellwork List 3 chemicals that you have at home? What would you do if a younger relative ingested them?
Hazard Communications Standard HS-105 (R)
Why LPA’s? LPA’s can provide low cost system for finding problems and making improvements in Safety, Quality, Delivery, Cost and Morale when used effectively.
Installing DOT/ICC Exchange or Stationary Cylinders
Landpower Project Zero Harm Learning Series Module:. #7a Module Title:
Sherwin Williams Victorville Facility.
PEMAC Care (Safety IT System) – Risk Assessments for Users #2 Creating/Completing the RA NUI Galway Health and Safety Office.
UAW-GM Energy Control SOPs
Landpower Project Zero Harm Learning Series Module:. #7a Module Title:
How to LINK Policies.
JSA Quality Assessment Tool Guidelines for Assessors
PPE Program 29 CFR OSHA requirement for this company to have a Personal Protective Equipment Program to protect employees from exposure to.
TDI-Brooks Procedures
Chemical Safety and Security Plan
You must log in using both you address and your Full name before proceeding
Why LPA’s? LPA’s can provide low cost system for finding problems and making improvements in Safety, Quality, Delivery, Cost and Morale when used effectively.
For Persons Who Routinely Work With Chemicals
Standard Operating Procedure
Why LPA’s? LPA’s can provide low cost system for finding problems and making improvements in Safety, Quality, Delivery, Cost and Morale when used effectively.
United Maintenance and Contracting Company
Presentation transcript:

Sherwin Williams Victorville Facility

Manuel Jimenez Jr.-EHS Manager SW Victorville Introduction

SAFETY GRABBER!

Site Background Victorville California- On the Map 54 Employees Estimated 4.6 Million Gallons in 2016 One of 27 VPP Star Sites

Products Marine Coatings Industrial Maintenance Traffic Markings Products & Customers

Creating Safe Standard Operating Procedures Our Best Practice

SOP Definition: established or prescribed methods to be followed routinely for the performance of designated operations or in designated situations. Critical tasks 1.Safety 2.Quality Standard Operating Procedures

Who should participate? 1.Employees 2.Managers & Engineering Development Participation

Job Safety Analysis Changing Gears- Mitigating Risk

JSA Definition: is a procedure which helps integrate accepted safety and health principles and practices into a particular task or job operation. Job Safety Analysis

Job Safety Analysis-Template

Who should participate? 1.Employees 2.Managers & Engineering Development Participation

Let’s Be Honest

Standard Operating Procedure (SOP) Job Safety Analysis (JSA) What If?

The Benefits of One Document SOP JSA TRAIN REVIEW

SSOP Keeping It Simple EHS integration in operations Employee gets one document to follow Train on one document Easy to manage revisions Efficient controlled document management

S-W Victorville SSOP Title: Paint ManufacturingLocation: S:\Process and Procedures\Safety-Enviro Docs\SOP's Document Code: VIC-PRD-002 Revision Number: 04 Re- Certification Date: 11/05/2015 Page:1 of 9 Author:SOP TeamApprover:Richard Rivera Victorville Plant This format complies with The Sherwin-Williams Company’s Standard Work Format and the requirements of OSHA’s Process Safety Management Standard Standard Operating Procedure Procedure: Paint Manufacturing Date DescriptionRevised By 11/05/2015Updated to reflect current processSOP Team 07/31/2014Updated and added sections per PSM standardSOP Team 04/15//2013Addition of hose & camlock inspection to SOPManuel Jimenez Jr. 05/18/2012Addition of ESD wrist straps to SOPManuel Jimenez Jr. 09/12/2011  OriginalRaul Alonso Revision Log – Order revisions in ascending order, with most recent date at top of list. Printed copies are considered uncontrolled unless otherwise designated.

Visual Emphasis Symbol keys: Use icons provided below to highlight these considerations within the SSOP. Respirator (vapor protection) RequiredStandard Site Clothing & PPE Required  Bonding/Grounding Required – Static Electricity Risk Eye Protection RequiredCaution! Or Safety Warning See Related SOPs, JSAs, or other Documents Hand Protection RequiredInvolves the EHS Department Special Information (Corrective Actions, Quality, etc.) Hearing Protection Required Waste Generation Regulatory or Mandatory item. Cannot be changed without MOC InteractionRecycleHousekeeping Task(s)

S-W Victorville SSOP Pre-Checks Enter reminders or key items to “review” prior to starting the procedure. Use icons to represent items, as appropriate. (Copy and paste from symbol guide ) Operating Limits Consequences of Deviation: To Avoid Deviation: Safety, Health and Environmental Considerations Properties of Chemicals/Materials: Enter Description Precautions: Standard Site Clothing & PPE Required. Wear eye / ear protection. Follow HMIS instructions on fill slip. Keep workstation and surrounding areas clean and free of loose clutter.

S-W Victorville SSOP Task # Step # Step Time Hazard Step Description & Hazard Risk Control Measures Image(s) 1 Enter Task Description  1.1HH:MM Hazard(s) associated with each step as identifed by a JSA for the task. Indicate “N/A” if not applicable. Static Electricity Enter step detail. I.Include any additional sub-steps or more detailed breakdown. II.Xx III.Xx IV.xx Risk Control or other Special Information: Include any Risk Control measures to address any Hazards associated with each step as determined by a JSA for the task. - Include any necessary reminders and corresponding symbol. - Include normal start-up and shut down (if applicable) - Wear Static Dissipative Shoes and wrist strap Use space to Insert Picture/Image 1.2Enter step detail. Use space to Insert Picture/Image 1.3Enter step detail. Use space to Insert Picture/Image 1.4Enter step detail. Use space to Insert Picture/Image

S-W Victorville SSOP Normal Operation Procedure Temporary Operation Procedure Emergency Shutdown Procedure Emergency Operation Procedure Startup Procedure Following Emergency Shutdown

S-W Victorville SSOP Post-Checks Enter reminders or key items to “review” after completing the procedure. i.e. Complete Required Housekeeping Tasks i.e. Check Batch Slip for Errors

SSOP Keeping It Simple-Summary EHS integration in operations. One document Visual Compass One Training Simplified revision and controlled document management Living Breathing Document

Questions?

Benefit About 25% Savings