Answers to Barcelona questions about Mini-Drawers and comments Tilecal upgrade meeting CERN (24 June 2013) François Vazeille on behalf of Roméo Bonnefoy,

Slides:



Advertisements
Similar presentations
Manchester 09/sept/2008A.Falou & P.Cornebise {LAL-Orsay}1 CALICE Meeting/ Manchester Sept 2008 SLAB Integration & Thermal Measurements.
Advertisements

Status of the Clermont-Ferrand R&D works Tilecal upgrade meeting at CERN (11 February 2015) François Vazeille on behalf of Clermont-Fd team ● Active Dividers:
Observations and next works from the recent tests of the insertion tools of Mini-Drawers at CERN Roméo Bonnefoy and François Vazeille Tilecal Operation.
WA105 General Meeting at CERN 21 & 22-January-2014 Enrique Calvo Alamillo.
Mechanical Status of ECAL Marc Anduze – 30/10/06.
MICE Installation and Commissioning meeting RAL, 12 June 2007 Diffuser Oxford University.
IBL Mock Up IBL Mock Up MANUFACTURING 2011/04/29 François-Xavier NUIRY Maxence CURDY Andrea CATINACCIO CERN PH/DT/PO 1.
Upgrade developments in Clermont-Ferrand Romeo Bonnefoy and François Vazeille Tilecal upgrade meeting (CERN, 13 June 2014) ● Handling tools ● Deported.
Pixel Support Tube Requirements and Interfaces M.Olcese PST CDR: CERN Oct. 17th 2001.
1 E906 Pre-Amplifier Card 2009/10/07. 2 E906 Wire Chambers Station1 MWPC: –build a new E906 MWPC. –4500 channels in total. Station2 DC: –recycle old E866.
Ultra-Compact Electrical Machines for Wind Energy DE-FOA : Demo Machine C. L. Goodzeit and M. J. Ball May 1, 2014 Part 1: Design and Construction.
CLASSE prototype: mechanical concepts G. De Michele, EPFL-PSI-CERN on behalf of CERN team SLAC, 16 th April, 2012.
Marc Anduze – 09/09/2008 Report on EUDET Mechanics - Global Design and composite structures: Marc Anduze - Integration Slab and thermal measurements: Aboud.
1 Status of the CLIC two-beam module program A. Samochkine, G. Riddone Acknowledgements to the Module WG members 4 February 2014 CLIC Workshop 2014 (3-7.
1 IBL Integration & Testing activities University of Geneva: G.Barbier, F.Cadoux, A.Clark, D.Ferrère, C.Husi, M. Weber  Preliminary definition of Integration.
Mechanical Status of EUDET Module Marc Anduze – 05/04/07.
High Voltage System outside Drawers Tilecal upgrade meeting at Stockholm (3-5 June 2013) François Vazeille on behalf of Roméo Bonnefoy, Christian Fayard,
Positioning fork M. Ciappeti R. Vuillermet 29/09/20111.
Status of the Remote HV System 10 June 2015 TileCal week, upgrade session Roméo Bonnefoy, Romain Madar and François Vazeille ● Summary of performances.
CLAS12-RICH Mechanical Design Status-Report CLAS12 RICH Review September 5-6 th 2013 S. Tomassini, D. Orecchini1 D. Orecchini, S. Tomassini.
Mechatronics Task Force, 26-nov-02 Olivier Teller, CERN EP-CMA1 Cooling Mechatronics Schedule.
Baby MIND coil modules assembly the aluminium folded strip solution 1 Alexey, Philippe, Gabriella, Helder, Herman Baby Mind Magnet CERN June.
Heat load of the radiation cooled Ti target of the undulator based e+ source Felix Dietrich (DESY, TH-Wildau),Sabine Riemann(DESY), Andriy Ushakov(U- Hamburg),
VVS Prototype Construction at Fermilab Erik Ramberg 26 February,2002 Design issues for VVS Details of VVS prototype design Schedule and Budget Testing.
18 June 20031Integration Review B. Schmidt Outline: Overview of the support structures Requirements –Some details on electronics, cabling and piping Constraints.
Update on Micro Channel Cooling Collaboration Meeting , G. Nüßle.
Marc Anduze – CALICE Meeting – KOBE 10/05/07 Mechanical R&D for Technological EUDET ECAL Prototype.
A2-A5: The drawing has been revised (minor changes), the bid has been approved by INFN management and the invitation letter to the companies will be sent.
The integration of 420 m detectors into the LHC
Vessel dimensions GTK assembly carrier Electrical connections Cooling pipes integration Vessel alignment with the beam Next steps Conclusion 3/23/20102electro-mechanical.
R&D status of the very front end ASIC Tilecal week (7 October 2011) François Vazeille Jacques Lecoq, Nicolas Pillet, Laurent Royer and Irakli Minashvili.
Practical aspects of small aperture quadrupoles Dr Ben Leigh Tesla Engineering Ltd.
Short news on the FATALIC project Wednesday Tile Upgrade meeting 2016 May 4 Roméo Bonnefoy and François Vazeille  Communication Main Board-Daughter Board.
Requested hardware for Clermont-Ferrand in the test beam 2015 September 23 Roméo Bonnefoy and François Vazeille This material is provided by LPC and Collaboration:
Information about Multi-conductor cables of the Remote HV option Wednesday Tile upgrade meeting 10 February 2016 François Vazeille (LPC Clermont-Ferrand)
Status of Clermont-Ferrand R&D works Tiles session in AUW François Vazeille LPC Clermont-Ferrand ● Mechanics ● External High Voltage Power Supply ● Active.
Baby MIND Scintillator modules 11 November 2015 Revision E. Noah.
Mechanical Upgrade Interaction Region IR1 Luigi Pellegrino Mechanical Engineering Group (LNF Scientific Committee, May 9, 2013)
24 September 2012 Immanuel Gfall (HEPHY Vienna) Annekathrin Frankenberger (HEPHY Vienna) SVD Status of Mechanics PXD-SVD Meeting Göttingen.
On detector electronics: High voltage part Tilecal session in ATLAS upgrade week (Tuesday 10 November 2009) François Vazeille  What are the constraints.
Clermont-Ferrand requests for the Test Beam Vidyo meeting, 29 July 2015 François Vazeille -Remote HV System -Front End electronics Hypothesis: Some Mini-Drawers.
Status of the Remote HV Tile Upgrade session during the AUW Wednesday, 20 April 2016 François Vazeille on behalf of the Clermont-Ferrand team  Same set-up.
Marc Anduze first drawings of Ecal eudet module COPIED FROM : Marc Anduze PICTURES FROM : CALICE/EUDET electronic meeting – CERN – 12 July 07.
Marc Anduze – EUDET Meeting – PARIS 08/10/07 Mechanical R&D for EUDET module.
Mickael Frotin– 19/10/2009 ECAL MACHANICAL R&D CALICE meeting - Genève 1.
Profiler Mechanics Update
Last upgrade R&D results on the LPC works
"Drawer Mechanics - MiniDrawer"
Tile Upgrade Workshop (CERN- February 2008, 8 and 9)
Upgrade activities at Clermont-Ferrand
new straw end plug: D=10.6 mm straws support frame Levan option
- STT LAYOUT - SECTOR F SECTOR A SECTOR B SECTOR E SECTOR D SECTOR C
A. Vande Craen, C. Eymin, M. Moretti, D. Ramos CERN
Tile Upgrade Workshop (CERN- February and 9)
TileCal upgrade EVO meeting Demonstrator tesks
Performance of an Automated Water Based Cooling System for CBM MuCh
Components for the Machine-Interface Regions
Concept of Drawers Thoughts on Drawers and mini-Drawers: Small story
Mini-drawers, FE-ASIC , Integrator
SPARC Review Committee Meeting
Vertex Detector Mechanical R&D Design Questions and Issues
Tilecal week (8 February 2012)
R&D on the sliding comparison of standard and mini-drawers
Status of upgrade works at Clermont-Ferrand
List of changes and improvements for the next generation CLIC module
Installation plan for LAB modules
2S module geometry updates Module positioning concepts
New Design for Beam Test Structure
Tilecal session in ATLAS upgrade week (Tuesday 10 November 2009)
Presentation transcript:

Answers to Barcelona questions about Mini-Drawers and comments Tilecal upgrade meeting CERN (24 June 2013) François Vazeille on behalf of Roméo Bonnefoy, Dominique Pallin François Daudon, Gilles Magaud, Marc Nivoix, Guy Savinel, Pierre Verdier  Questions and answers  Other comments  Next actions 1

Questions and answers Questions taken from the Back up slides of Furan Granena (Stockholm meeting ) 2

1. Screws M3, thickness Iron shielding 2 mm: yes, but 116 mm instead of 117 mm. 3.Threads were proposed by Clermont-Fd to other Institutes, located where Al thickness is good, but freedom is given for drilling others. 4. Holes made for the mock up sliding tests to maintain the Iron cylindrical loads: no use later when the mock-ups were machined in Mini-Drawers. 5. Not clear: does it mean PMT block diameter? If yes, there were diameter fluctuations in the Iron cylinder productions*  The drawings of holes took into account the biggest diameters. *Besides: if the fixation of the iron end plate is too much screwed  distortion of the round shape. 3

1. The slides are made of Polyethylene PE HD. Other materials could be used if they can offer the same sliding properties on the Girder-Rings made of NORYL  (PPOm, loaded 30% carbon fiber) (Validation made in our tests at CERN) or even if they are better. 3. Same comments as those ones of the previous slide, question # These pieces are 1 mm thick and enable to recover the step in between 2 holes, since the Drawer length is 2 mm shorter. Their role is also to offer some motion. Sliding tests at CERN showed that the offered flexibility was enough. If other solutions are proposed, new tests will be requested. Plate with a boss  Some freedom 4

2. Till now, this tolerance of  0.1 mm fitted well the whole Tilecal arrangement. The precise positioning of the PMTs with respect to the Fiber-bundles is a constraint we must keep. More generally, any upgrade action should be able to keep the present performances and even to improve them. This comment is valid for any upgraded elements of Tilecal including the electronics. 5

Mechanical precisions 1. We will provide the propagation of present tolerances: it is crucial to insure the right position for the biggest D cells (bigger bundles). Cooling aspects 3. The present design of the cooling circuitry (diameter of Al tubes), and of the inlet water flux and temperature, was optimized from test beam studies, then from ATLAS studies. Any modifications (it is not forbidden !) should follow the same approach. Depending from the final FE options, the dissipated heat will be different: bigger in the case of the option 1, likely smaller for option 3 and less for option The association of the Leakless Cooling System and of the automatical present locking of the connectors prevent the leaks. Is it possible to recover such a working in the new design ? 6

Other comments 2. and 3. Despite some flexibility, the experience showed that a lot of Modules made very difficult the insertion/extraction of present Drawers and Super-Drawers. What were the reasons ? Not very clear: likely the Girder-Ring alignments with respect to the Finger references, plus the effects of damaged Girder-rings.  Inserting one by one the Mini-Drawers should improve the manipulations, keeping some flexibility without changing the mechanical tolerances. 7

1.The idea of having a long basket has been proposed at Stockholm meeting: WHY NOT ? but the design of Mini-Drawers will request a new design of a long basket. 2. The new Slider (tested next week) will use more Girder-Rings than the first one  tests will show if it is enough: likely yes for Mini-Drawers what about a new Super-Drawer of 4 Mini-Drawers ? New tests will give the answer. 8

Not in agreement of having fully independent Mini-Drawers (But for mechanical links and cooling): It was one of the main justification of the new electronics set-up. OK: the Mini-Drawers are independent, - But the HV link is depending from the HV option. - If yes, it is not easy to go from a side to the other side (across the body). 9

Next actions 10  Thursday 20 and Friday 21 by June: tests of new Slider and new Basket, always at the prototype level.  New evolutions of Tools/Drawers, including cooling, mechanical links, services.  As soon as possible: integration of the 3 readout options, and new tests of the tools.  Use of CDD storage of drawings.  It is important to have tight contacts in between Barcelona (Links and services) Bucharest (The bodies) Clermont-Ferrand (The handling tools) plus Institutes having the experience of present Drawers (mainly CERN-Irakli and Clermont-Ferrand) plus the Institutes working on the electronics.