Creating sustainable change through education, communication and leadership© 2016 GSES P/L Training Consulting Engineering Publications Inspections of.

Slides:



Advertisements
Similar presentations
Background Presenters Work done in preparation for WHS changes
Advertisements

Electrical Safety Program. How Electricity Works Operating an electric switch is like turning on a water faucet. Behind the faucet or switch there must.
(Adapted from:D.T. Hall:Practical Marine Electrical Knowledge)
Presented by Gerry Imdieke.  We have as much solar energy as Florida or Houston Texas  4.6 hours per day  Panels produce more when cold.
SOLAR PANELS- FACTS TOTAL NUMBER OF PV SYSTEMS INSTALLED * 750,000+ Queensland: 209,217 New South Wales: 194,980 Victoria: 128,013 South Australia: 107,544,
BS9990 : 2015 Updates and/or Changes
Solar Inspections by Drew Johnson and John Dalton Burnham Energy, Inc.
APEC Energy Section International Energy Branch Department of Industry, Tourism and Resources EGNRET 23, Christchurch NZ November 2003.
Proposed Design and the Operation of a Disconnecting Device for Small EG Installations Prepared by Hendri Geldenhuys.
Health and safety at work
Md.Kausher ahmed Electrical department
A Guide to Fire Alarm Service and Maintenance Requirements.
Testing and tagging. WorkSafe’s Goal Western Australian workplaces are free from death, injury and disease.
AGENDA INTRODUCTION CELLS AND COMPONENTS PV PERFORMANCE PV APPLICATIONS CODES AND STANDARDS EMERGENCY RESPONSE.
1. Presentation Overview  Solar Industry Overview  Intro into Solar Photovoltaics  Types of PV Systems  Solar Product Offering –Solar Combiner Boxes.
Confidential and proprietary materials for authorized Verizon personnel and outside agencies only. Use, disclosure or distribution of this material is.
COMPETENCY CERTIFICATION WITHIN THE INDUSTRY Hazardous Area Standardisation - A case study from Australia 3 What is Competency Competency comprises the.
Health and Safety. The Health and Safety at Work Act 1974 An Act to make further provision for securing the health, safety and welfare of persons at work,
South Australian Centre for Renewable Energy TAFE SA Regional Whyalla Campus.
ELECTRICAL HAZARDS Electricity is an essential of modern life Some work directly with electricity (Engineers, circuit assemblers) Some work indirectly.
Electrical Installation 2
Section 54’s 54.Inspector’s power to deal with dangerous conditions – (1) if an inspector has reason to believe that any occurrence, practice or condition.
Unit 201: Health and safety in building services engineering
Modernising Pharmacy Regulation An inspector calls: A new regulatory model in pharmacy Deborah Hylands Inspector, GPhC 19th February 2014.
What is POWERGRID??? The Power Grid Corporation of India Limited (POWERGRID), is an Indian state-owned electric utilities company headquartered in Gurgaon,
Electrical Safety, Subpart K
Procedures for work on Fixed Electrical Installations Toolbox Talk 2: Duties of Staff and Contractors.
Chapter 3 PHYSICAL INJURY AND CONTROLS 3.2 Electrical Safety
The Repairing Standard ELECTRICAL INSTALLATIONS AND APPLIANCES.
Every employer must ensure, as far as is reasonable practicable, the health, safety and welfare of all his employees More specifically, employers must.
Electric Circuits Chapter 14, Section 4. Circuits consist of an energy source, a load, wires, and in some cases, a switch.
Cooling Tower Audit Nathan Maple City of Marion. Why do we undertake an audit and sampling? Regulation 15 South Australian Public Health (Legionella)
NHS PAM Electrical Systems 2 nd June ) Policy & Procedures Does the Organisation have a current, approved Policy and an underpinning set of procedures.
SEC598F16 Photovoltaic Systems Engineering Session 12 PV System Components Inverters Balance of Systems (BOS) October 04, 2016.
San Francisco Electricians. Why Do You Need to Call an Electrician? Most of us have studied that one subject about circuits, electricity, and electrons.
Introduction High Voltage!!.
International Testing and Certification Services
Starting System Circuit Operation and Testing
Sub Station.
PMMAI : OPEN HOUSE 11th Aug, 2016 : Ahmedabad
Session 13 System Protection
PV Array DC Isolator Rating
Lock Out & Tag Out.
The importance of being alert to potential hazards when dealing with machinery, equipment and substances such as toner fluid.
Photovoltaic Systems Engineering Session 19
Job roles for the children's shoe brief
Testing and tagging.
Unsafe Condition/ Near Miss – Electrical Safety (1)
Managing the Sunshine Coast Council Backflow Register
Personal Protective Equipment
Engineering Project Cable Management.
AGENDA INTRODUCTION CELLS AND COMPONENTS PV PERFORMANCE
ELECTRICAL POWER-II Electrical engineering sixth semester
Compliance Made Simple Presents:
Winch Signalling System
Control of Hazardous Energy
The Safe Use of Electricity
“DESIGN OF GRID-CONNECTED PV SYSTEM”
Photovoltaic Systems Engineering Session 12
AGENDA INTRODUCTION CELLS AND COMPONENTS PV PERFORMANCE
Click anywhere to get started…
Components inverters Except where otherwise noted these materials are licensed Creative Commons Attribution 4.0 (CC BY)
SMART Program Specific Metering Wiring Diagrams May 2019
Electrical components and systems
Parker domnick hunter. Safety of Electrical and
London Youth Introduction to the Quality Mark.
Dominion Energy South Carolina: Solar Equipment Requirements
CLEPA comments on OBD II GTR 18 Draft
Presentation transcript:

creating sustainable change through education, communication and leadership© 2016 GSES P/L Training Consulting Engineering Publications Inspections of PV Systems Geoff Stapleton

creating sustainable change through education, communication and leadership© 2016 GSES P/L creating sustainable change through education, communication and leadership© 2016 GSES P/L GSES managed the first Government funded inspection program on behalf of the BCSE (industry association) back in systems were inspected Australian wide and that project led to amendments in the AS/NZS4509 – Stand Alone Power System Standard The industry association continued to undertake inspections (randomly) of systems that were receiving subsidy under the PVRP program Australia - Early Inspections

creating sustainable change through education, communication and leadership© 2016 GSES P/L creating sustainable change through education, communication and leadership© 2016 GSES P/L In 2009 GSES was approached by the then Department of Environment Water Heritage and the Arts- to develop the Inspection Framework and in Particular the Inspection Checklist for Inspections. GSES was selected as one of 3 inspection companies to undertake inspections of systems that had received funding under the PVRP subsidy program. GSES inspected over 600 systems in next 12 months. Government Managed Inspections

creating sustainable change through education, communication and leadership© 2016 GSES P/L creating sustainable change through education, communication and leadership© 2016 GSES P/L Prior to the first round of inspections one of the issues were installers using AC rated circuit breakers instead of DC rated breakers-however publicity within the industry quickly fixed this issue. However in the early rounds of inspection the big issue was incorrectly wired polarised DC breakers. Over 20% of system were wired incorrectly which led to Industry association requiring all installer to recheck every system over a 6 month period Early Issue

creating sustainable change through education, communication and leadership© 2016 GSES P/L creating sustainable change through education, communication and leadership© 2016 GSES P/L Correct Circuit Breaker Wiring

creating sustainable change through education, communication and leadership© 2016 GSES P/L creating sustainable change through education, communication and leadership© 2016 GSES P/L Correct Circuit Breaker Wiring

creating sustainable change through education, communication and leadership© 2016 GSES P/L creating sustainable change through education, communication and leadership© 2016 GSES P/L Double Marked Isolators Both terminals of each breaker are labelled positive or negative to indicate the required direction of current flow Positive and negative outputs of array connect to the respective breaker terminals

creating sustainable change through education, communication and leadership© 2016 GSES P/L creating sustainable change through education, communication and leadership© 2016 GSES P/L Double Marked Isolators

creating sustainable change through education, communication and leadership© 2016 GSES P/L creating sustainable change through education, communication and leadership© 2016 GSES P/L Double Marked Isolators

creating sustainable change through education, communication and leadership© 2016 GSES P/L creating sustainable change through education, communication and leadership© 2016 GSES P/L Non-polarised Isolators Non-polarised isolators operate safely breaking current flow in both directions through the device. There are no positive or negative terminals End result was that AS/NZS5033 now only allows non Polarised breakers however industry is mainly using DC switch disconnectors (isolators)

creating sustainable change through education, communication and leadership© 2016 GSES P/L creating sustainable change through education, communication and leadership© 2016 GSES P/L Clean Energy Regulator Inspections The inspections were then taken by the office of the Renewable energy Regulator now known as Clean Energy Regulator Since 2012 over 20,0000 inspections have been undertaken throughout Australia (GSES has undertaken over 8000).

creating sustainable change through education, communication and leadership© 2016 GSES P/L creating sustainable change through education, communication and leadership© 2016 GSES P/L Nominated by inspection company but appointed by CER Be licensed electricians with Clean Energy Council accreditation for design and installation of grid connected PV systems. Receive initial training and ongoing training. Who are the Inspectors

creating sustainable change through education, communication and leadership© 2016 GSES P/L creating sustainable change through education, communication and leadership© 2016 GSES P/L Systems to be inspected selected by CER Inspection Companies appoint the inspectors for each particular inspection but they must declare if their is conflict of interest. All owners are written to and then phone to organise the inspection.. They do have opportunity to decline the inspection Inspectors then make final visit arrangement and the inspection involves: –Completing a checklist on exactly what has been installed against what should have been installed. –Completing a technical checklist which is based on all the key clauses from standards such as AS/NZS3000, AS/NZS5033, and AS/NZS4777 and the CEC guidelines Inspection Process

creating sustainable change through education, communication and leadership© 2016 GSES P/L creating sustainable change through education, communication and leadership© 2016 GSES P/L A report is prepared and it is sent to the installer for comment. The inspections are rated: best industry practice, compliant, adequate sub-standard and unsafe. The CEC apply demerit points on an installer’s accreditation if their system is found to be sub-standard or unsafe. Disciplinary action is taken on installers with 20 or more demerit points. Report is sent to system owner- CER and CEC Inspection Process 2

creating sustainable change through education, communication and leadership© 2016 GSES P/L creating sustainable change through education, communication and leadership© 2016 GSES P/L Actions taken as a result of the systems being classified as unsafe: The system was shut down or otherwise rendered safe by the inspector. The owner and/or occupier of the premises were advised by the inspector of the nature and extent of the safety risk. The relevant state or territory regulation authorities and energy network provider were advised by the inspector of the nature and extent of the safety risk. Unsafe System

creating sustainable change through education, communication and leadership© 2016 GSES P/L creating sustainable change through education, communication and leadership© 2016 GSES P/L A system that is assessed as substandard requires work to rectify the installation. A substandard system is defined as one that: –does not meet key clauses in the standards and requirements for installation and may lead to premature equipment failure or other issues, –does not pose an imminent safety risk, or –the installation work and/or the equipment should be improved to meet relevant standards and industry guidelines. Sub-standard systems

creating sustainable change through education, communication and leadership© 2016 GSES P/L creating sustainable change through education, communication and leadership© 2016 GSES P/L CER Report No 12 – Early 2015

creating sustainable change through education, communication and leadership© 2016 GSES P/L creating sustainable change through education, communication and leadership© 2016 GSES P/L Examples of an unsafe system is one that has been assessed as having either; direct current isolator enclosures, or junction boxes, that were not suitably installed to prevent water ingress, or had signs of water damage present; issues with the panel mounting, or; exposed live parts Unsafe Systems

creating sustainable change through education, communication and leadership© 2016 GSES P/L creating sustainable change through education, communication and leadership© 2016 GSES P/L Not Required in PPA/SEIAPI Guidelines. Not required in New Zealand in accordance with AS/NZS5033 RECOMMEND DO NOT INSTALL IN THE PACIFIC Isolators on Roofs

creating sustainable change through education, communication and leadership© 2016 GSES P/L creating sustainable change through education, communication and leadership© 2012 GSES P/L Currently there is no electrical protection for these cables. Their cross sectional area is selected to carry the maximum short circuit current with a margin (40%)—hence if a fault—ARC will occur and there is no electrical device to stop the arc and fire The arc could also occur within a module if there is a break in the wiring or a poor quality module or poor quality connectors. AS/NZS5033 does require all cables within building cavities to be within heavy duty conduit. Protection of String and Array cables

creating sustainable change through education, communication and leadership© 2016 GSES P/L creating sustainable change through education, communication and leadership© 2012 GSES P/L DC ARCS

creating sustainable change through education, communication and leadership© 2016 GSES P/L creating sustainable change through education, communication and leadership© 2012 GSES P/L DC ARCS

creating sustainable change through education, communication and leadership© 2016 GSES P/L creating sustainable change through education, communication and leadership© 2016 GSES P/L An additional safety requirement for the string and array cables is that cable connectors need to be mated with those of the same type and from the same manufacturer Connectors

creating sustainable change through education, communication and leadership© 2016 GSES P/L creating sustainable change through education, communication and leadership© 2016 GSES P/L There has been recall of 5 isolators in Australia due to safety concerns Isolator Recall

creating sustainable change through education, communication and leadership© 2016 GSES P/L creating sustainable change through education, communication and leadership© 2016 GSES P/L GSES has been involved with system larger system inspection- both grid and off-grid throughout the Pacific,Australia, Africa and India. Inspection checksheets based on relevant standards are developed. Other Inspections

creating sustainable change through education, communication and leadership© 2016 GSES P/L creating sustainable change through education, communication and leadership© 2012 GSES P/L Poorly protected cables and damaged enclosure

creating sustainable change through education, communication and leadership© 2016 GSES P/L creating sustainable change through education, communication and leadership© 2012 GSES P/L Poor wiring installation

creating sustainable change through education, communication and leadership© 2016 GSES P/L creating sustainable change through education, communication and leadership© 2012 GSES P/L Poor wiring installation

creating sustainable change through education, communication and leadership© 2016 GSES P/L creating sustainable change through education, communication and leadership© 2012 GSES P/L Poor wiring Installation

creating sustainable change through education, communication and leadership© 2016 GSES P/L creating sustainable change through education, communication and leadership© 2012 GSES P/L Poor wiring installation

creating sustainable change through education, communication and leadership© 2016 GSES P/L Poor battery Installation 1

creating sustainable change through education, communication and leadership© 2016 GSES P/L Poor battery Installation 2

creating sustainable change through education, communication and leadership© 2016 GSES P/L

creating sustainable change through education, communication and leadership© 2016 GSES P/L THANKYOU