STATUS of BIG PROTOTYPES A. Piskun (for Dubna group) Protvino, 7 June 2011 _________________________________________________ Full Scale Prototype Range.

Slides:



Advertisements
Similar presentations
Forward Detector Meeting, 11 Mar 2003Børge Svane Nielsen, NBI1 Si-FMD status Forward Detector meeting, CERN, 11 March 2003 Børge Svane Nielsen Niels Bohr.
Advertisements

DAQ WS03 Sept 2006Jean-Sébastien GraulichSlide 1 DDAQ Trigger o Reminder: DAQ Trigger vs Particle Trigger o DAQ Trigger o Particle Trigger 1) Possible.
Mauro Raggi Status report on the new charged hodoscope for P326 Mauro Raggi for the HODO working group Perugia – Firenze 07/09/2005.
Panda PCB for prototype status report by D Malkevich on behalf of the ITEP group ITEP.
Status of LAV FEE electronics G. Corradi, C. Paglia, D. Tagnani & M. Raggi, T. Spadaro, P. Valente.
Proposal of new electronics integrated on the flanges for LAr TPC S. Cento, G. Meng CERN June 2014.
J A Hill – EID RAL 1-2 September EE End Cap Mechanical Design ECAL EE End Cap Engineering CMS-UK Collaboration Meeting Brunel University September.
Gif++ CR tracker setup G. Aielli for the RPC collaboration.
CMS ECAL End Cap Meeting CERN 19 June to 23 June 2000 A.B.Lodge - RAL 1 ECAL End Cap High Voltage Cards and 2000 Electrical/Thermal Model. Progress on.
Update on the HBD Craig Woody BNL DC Meeting June 8, 2005.
Status of the PSD upgrade - Status of production of new temperature, HV control systems MAPD gain monitoring system. -Status of the PSD temperature stabilization.
CMS ECAL End Cap Meeting CERN 18 Oct to 22 Oct ECAL End Cap High Voltage and Fibre Optic Monitoring Systems Progress. Progress on High Voltage and.
F. Sabatié Slides from D. Attié, S. Procureur June 18 th, 2014 Forward-Tagger Tracker – Status & Plan – – Status & Plan –
29-Jun-09H. Henschel DESY (Zeuthen) 1 Frontend Interface Summarize.
Update on final LAV front-end M. Raggi, T. Spadaro, P. Valente & G. Corradi, C. Paglia, D. Tagnani.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept and status of the PSD temperature control - Concept of the PSD analog part.
CM19 Vassil Verguilov DAQ Status  Progress  DAQ  Next steps  Summary.
Status of the PSD upgrade - Problems with PSD in Be runs - Modification of cooling system - New temperature control - Upgrade of HV control system - MAPD.
09/10/2010 RD51 Collaboration Meeting Cisbani-Musico-Minutoli / Status JLab Electronics 1 Status of the APV25 electronics for the GEM tracker at JLab Evaristo.
NA62 straw readout Characterization and qualification of the frontend electronics Detector and interface to frontend Small readout system Plans Expected.
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
Peter LICHARD CERN (NA62)1 NA62 Straw tracker electronics Study of different readout schemes Readout electronics frontend backend Plans.
FEE Electronics progress Mezzanine layout progress FEE64 progress FEE64 initial testing Test mezzanine. A few of the remaining tasks 2nd October 2009.
11 October 2002Paul Dauncey - CDR Introduction1 CDR Introduction and Overview Paul Dauncey Imperial College London.
Plans to Test HBD Prototype in Run 6 Craig Woody BNL DC Meeting March 8, 2006.
26-Feb-16S.Movchan Straw manufacturing and QC1 Dubna NA62 straw tracker assembly area (milestone) halls plans conclusion Presented by S.Movchan.
European DHCAL development European DHCAL development CIEMAT,IPNL,LAL, LAPP,LLR, PROTVINO, SACLAY CIEMAT,IPNL,LAL, LAPP,LLR, PROTVINO, SACLAY Status :
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept of the PSD temperature stabilization and control - Upgrade of HV control system.
Julie Prast, Calice Electronics Meeting at LAL, June 2008 Status of the DHCAL DIF Detector InterFace Board Sébastien Cap, Julie Prast, Guillaume Vouters.
1 Carleton/Montreal Electronics development J.-P Martin (Montreal) Shengli Liu & M. Dixit (Carleton) LC TPC Meeting DESY Hamburg, 4 June 2007.
RD51 GEM Telescope: results from June 2010 test beam and work in progress Matteo Alfonsi on behalf of CERN GDD group and Siena/PISA INFN group.
Redesign of LumiCal mechanical structure W.Daniluk, E.Kielar, J.Kotula, K.Oliwa, Wojciech Wierba, L.Zawiejski Institute of Nuclear Physics PAN Cracow,
Electronics for Range System Prototype Tests A. Piskun ITEP, Moscow, 28 April, 2010.
Mai 31th 2011 Christophe Beigbeder PID meeting1 ETD meeting Test setup : Activities in Bari, Univ of Maryland and at Orsay Test setup : Activities in Bari,
Status of the Front-end-Electronics based on NINO ASIC for the Time-of-Flight measurements in the MPD V. A. Babkin, M.G. Buryakov, V. M. Golovatyuk, S.
FEE for Muon System (Range System) Status & Plans G.Alexeev on behalf of Dubna group Turin, 16 June, 2009.
Report from the straw working group H. Danielsson 8/29/13Plenary Liverpool, H. Danielsson.
FRRC - PANDA Meeting, Moscow / ITEP, May 26, 2015 G.Alexeev (for muon group) Muon System Status Report * Approval of Muon TDR by FAIR Council (22 Sept.
BMBF-JINR PANDA Meeting, Dubna, November 15, 2013 G.Alexeev (for muon group) Status of Project and Related Topics * Report to the Muon Review Panel ( CERN,
TIMING DETECTOR ELECTRONICS FRONT END ELECTRONICS - NINO JOSE DA SILVA –CT-PPS TIMING ENGINEERING REVIEW /
G.Alexeev for Dubna group ITEP, April 28, 2010 Muon System Status Report from Dubna Hardware : * Full Scale prototype - in preparation to be put in work.
EPS HEP 2007 Manchester -- Thilo Pauly July The ATLAS Level-1 Trigger Overview and Status Report including Cosmic-Ray Commissioning Thilo.
Work on Muon System TDR - in progress Word -> Latex ?
Activity: TDR: * Range System Prototype is on the way to CERN
Electronics for Range System Prototype Tests
Novosibirsk, September, 2017
PANDA Muon Group Meeting, Protvino 7 June 2011 G
The European DHCAL status
Calorimeter Mu2e Development electronics Front-end Review
MDT and analog FEE mass production:
Dubna/JINR Status & Plans
Progress report since june 2010
G.Alexeev for Dubna group ITEP, April 28, Muon System Status Report from Dubna.
T1 Electronic status Conclusions Electronics Cards:
Status of the DHCAL DIF Detector InterFace Board
Mini-drawers, FE-ASIC , Integrator
Development electronics SIPM-MU2e
CMS EMU TRIGGER ELECTRONICS
Some proposals on HV circuits realization for segmented straw detector
News on second coordinate readout
NA61 PSD. Upgrade status. Institute for Nuclear Research RAS, Moscow.
EMC Electronics and Trigger Review and Trigger Plan
ALCT, TMB Status, Peripheral Crate Layout, CSC Event Display
Felix Sefkow CALICE/EUDET electronics meeting CERN, July 12, 2007
UK ECAL Hardware Status
STAR-CBM Joint Workshop Heidelberg, Physikalisches Institut
FEE Electronics progress
HallD Collaboration Meeting Jefferson Lab December 11-13, 2003
We are working on developing “cheap” RTD monitoring channels for the CMS Phase-2 requirements. The channels will provide the complete readout for 4-wire.
Presentation transcript:

STATUS of BIG PROTOTYPES A. Piskun (for Dubna group) Protvino, 7 June 2011 _________________________________________________ Full Scale Prototype Range System prototype: - mechanical structure/absorber – 100% ready; - MDT detectors (312 units)- 100% ready; - strip boards – 87% ready; - R/O electronics – mostly ready (enough to start RS cosmic tests); - overall readiness for the start of RS proto tests is about 100%; - FE electronics tuning with RS detecting layer (model of RS absorber gap) - RS proto delivery to CERN – October/November 2011 HVS/A-8 card -> new approach for the Barrel FEE

Full Scale (2 x 4 m 2 ) prototype in work position at CERN/COMPASS

VME crate 6U STRIP R/O digital WIRE R/O analog & digital RW-TDC QTC–16 ASum-96 ADB-32 (A-32) A2DB-32 analog digital COMPASS CATCH DAQ VME crate 9U MWDB units Hot link cables Range System Prototype Readout Scheme to DAQ crate

Range System prototype (Fe absorber and support structure) in Dubna in vertical position (for further tests with cosmic at CERN) MDTs and Strip Board for RS proto MDTs – 100% ready; Strip boards – 20 (ordinary) of 23 total produced; remains to produce 3 special (Zero bi-layer strip boards) MDTs Strip board

FEE for strip R/O of RS proto A % ready ADB-32 – 100% ready MWDB card 5 ready, need to produce 21 (plan to finish MWDB boards production by winter 2011/12) Not a limiting factor for the start of RSP cosmic tests (we’ll use the boards of MW1, our own should be produced by the time of beam tests)!!!

FEE for wire R/O of RS proto HV/S-8 boards/cables -100% ready Asum % ready A2DB % ready QTC % ready RW-TDC – 2 units will be borrowed from Rich Wall (COMPASS)

Status of Electronic Units and Signal Cables: A2DB-32 “Table-top” tested, passed debugging, 80 cards are manufactured (with spares) -100% ready A cards (with spares) are manufactured and tested - 100% ready ADB cards (with spares) are manufactured and tested - 100% ready ASum cards (with spares) manufactured and tested -100% ready QTC-16 “Table-top” tested, 2 boards produced - 100% ready RW-TDC Tested in COMPASS/CERN (RW), need to borrow 2 units from Rich Wall - 100% ready MWDB Tested in COMPASS/CERN (MW1), 24 needed, 5 boards produced, need to produce 21 (with spares) (not needed for the start of RSP tests – MW1 cards will be used) CATCH Need to borrow 2 units from COMPASS - 100% ready Wire Cables 2304 produced - 100% ready Strip Cables/ (HVS/A-8) 2304 cables produced with 312 HV/S-8 cards - 100% ready Degree of FEE readiness is about 92%

RS prototype readiness: MDTs - 100% FEE cards (300) and cables (4600) - 92% (for the start of RSP tests (cosmic) – 100% ready) Absorber plates and support structure - 100% G10 strip boards – 87% _________________________________________ Total ~ 100 % for the start of RSP tests (delivery to CERN/COMPASS - October/November 2011)

FE electronics tuning with the RS detecting layer Strip R/O: A-32, ADB-32 Wire R/O: HV/S-8, A2DB-32

FEE for Barrel wire R/O Block-diagram FEE signals With terminating resistors Without terminating resistors Artistic view of HVS/A-8 attached to MDT a – input signal b, c – negative / positive amplifier outputs d - differential signal on discriminator input.

PCB design of HVS/A-8 card Ready to start HVS/A-8 production for testing on the RS proto

CONCLUSION Full Scale Prototype is in work position at CERN, we’re ready to start tests Mechanical absorber structure and detecting part (MDTs, strip boards) of RS proto are ready (3 strip boards of zero bi-layers will be produced by the time of delivery to CERN - October / November 2011) All FEE needed for the start of RS proto tests (on cosmic) is ready (MWDB cards are planned to be produced by the winter 2011/12 – will be needed only for the beam tests ) Testing and tuning of RS proto FEE with the model of the RS detecting layer is started in Dubna New approach to the Barrel FEE is fixed and design is in progress