LALEucard WP 10.8.2 1 IN2P3 Les deux infinis IN2P3 Les deux infinis W. Kaabi, Y. Peinaud, A. Thiebault, E. Herry, A. Variola. M. Lacroix, B. Mercier and.

Slides:



Advertisements
Similar presentations
16-17 March 2010 CERN Introduction by W. Weingarten Review of SPL RF power couplers 16/17 March 2010 Review of SPL RF power couplers 1.
Advertisements

Bellow valve (trap&pump) Inside glove box. (Note: Ar glove box is not necessary, if you work with single crystalline organic materials like rubrene that.
30 th September 2004 High Power RF Couplers James Rogers High Power RF Couplers ELSRF Daresbury Laboratory.
Progress and Plan for Superconducting RF Cavity RF Group.
© 2013 Toshiba Corporation Toshiba Electron Tubes & Devices Co., Ltd. November, 2013 Scope of Disclosure Owner Comparison of fabrication techniques in.
20. June 2005SDW2005: Plasma Cleaning S. Deiries, ESO 1 Plasma Cleaning A new method of ultra-cleaning detector cryostats Sebastian Deiries, Armin Silber,
Cleanroom refurbishment in SM18 Upgrade for the SPL high gradient resonators 26/11/2010J. Chambrillon - CERN BE/RF1.
SPIE Conference - Photonics Applications in Industry and Research, Warsaw, 30 August, The RF Power Coupler Development Program at LAL-Orsay and.
BIAS MAGNETRON SPUTTERING FOR NIOBIUM THIN FILMS
Metal photocathodes for NCRF electron guns Sonal Mistry Loughborough University Supervisor: Michael Cropper (Loughborough University) Industrial Supervisor:
Status report on “Industrialization studies” at LAL on power couplers for XFEL _____ TILC08 – Tohoku University 3-6 March 2008 Sendai - Japan G. Wormser.
STF EP, VT commissioning by FNAL AES001 H. Hayano, KEK
1 E. KAKO (KEK) 2012' May 28 Clermont 1 A_RD_03 R/D for the High Power Couplers for ILC Walid KAABI (LAL-Orsay, France) Eiji KAKO (KEK, Japan)
LALEucard WP IN2P3 Les deux infinis IN2P3 Les deux infinis W. Kaabi, Y. Peinaud, A. Thiebault, E. Herry, A. Variola. M. Lacroix, F. Letellier-Cohen,
EAST ASIPP ICR-Wall conditioning in EAST J.S Hu, J.G Li and EAST Team Institute of Plasma Physics, Chinese Academy of Sciences, P.O.Box 1126, Hefei, Anhui.
1.3GHz Input Coupler for ILC
14-Dec-15S.Movchan Straw manufacturing and QC1 Straw manufacturing procedure and QC tape and straw parameters specification conditions of straw production:
Plans for in-situ coating with a robotic mole at BNL Ady Hershcovitch 1, Michael Blaskiewicz 1, Wolfram Fischer 1, H. Joseph Poole 2, Mark Erickson 2,
Manufacturing process, validation and factory test
Eric Montesinos - CERN - First SPL collaboration meeting - CERN December 11th 2008 First SPL collaboration meeting Experience with the LHC Main power Coupler.
56 Mhz Vacuum Mike Mapes Mhz Insulating Vacuum TURBO PUMP WITH GATE VALVE AND GAUGE SET MOUNTED ON TANK SIMILAR TO RHIC CRYOSTAT & VALVE.
1 Vacuum chambers for LHC LSS TS Workshop 2004 Pedro Costa Pinto TS department, MME group Surface Characterization & Coatings Section.
Mickaël LACROIX (LAL)ILC-HiGrade Scientific and Annual Meeting 1 IN2P3 Les deux infinis IN2P3 Les deux infinis Mickaël LACROIX (LAL) ILC-HiGrade Scientific.
Orsay, May 5th 2011EuCARD- WP IN2P3 Les deux infinis IN2P3 Les deux infinis Orsay, May 5 th 2011 EuCARD Meeting WP10.8: Plasma Discharge Cleaning.
Titanium Nitride Coating by Reactive DC Magnetron Sputtering as a Multipactor Suppressor on Coupler RF Ceramic Windows Walid KAABI Anti e - Cloud Coatings-
E-cloud Remedies and PS2 vacuum design J.M. Jimenez AT Department – Vacuum Group CARE-HHH-APD BEAM’07 Thursday 04 October Session 2: PS2 E-cloud.
MAIN LINAC CRYOMODULE DESIGN REVIEW INPUT COUPLER September 5, 2012V. Veshcherevich.
Preparation procedure and RF processining of cERL-ML power coupler at KEK Hiroshi Sakai, Takaaki Furuya, Masato Sato, Kenji Shinoe, Kensei Umemori, Kazuhiro.
CMS Double Chooz HESS Edelweiss Herschel ALICE Detecting radiations from the Universe. EXPERIENCE WITH VACUUM SYSTEM FROM DESY AND CEA SOLUTIONS TTC topical.
Guillaume Olry, Sébastien Bousson CNRS/IN2P3/ IPN Orsay – Paris-Sud University Experience on Spiral2 cavity cleanliness degradation during clean room assembly.
Status Report of the Review of Vacuum Systems and Procedures Tug Arkan, Allan Rowe.
Hao Guo LINAC Department Institute of Modern Physics.
Engineering of the power prototype of the ESRF HOM damped cavity* V. Serrière, J. Jacob, A. Triantafyllou, A.K. Bandyopadhyay, L. Goirand, B. Ogier * This.
IFMIF Power Coupler for HWR Superconducting cavities SRF LINAC GROUP H. Jenhani 1, N. Bazin 1, P. Bosland 1, B. Branas 2, P. Brédy 1, P. Carbonnier 1,
Plasma Cleaning of SRF Cavities Program Status J. Mammosser, S. Ahmed, L. Phillips Jlab S. Popovic, J. Upadhyay, L. Vuskovic, M. Nikolic ODU.
Status Report of the Review of Vacuum Systems and Procedures Tug Arkan, Allan Rowe 3/7/
France Japan Particle Physics laboratory (FJPPL) first workshop at KEK, Tsukuba, Japan 10 th May 2007 A_R&D_3 R&D on High Power Couplers for the ILC Hassen.
P. Bosland CEA-Saclay Collaboration Board meeting Copenhagen 14/04/ Status of the French activities under the responsibility of CEA Philippe CHOMAZ.
325 MHz Superconducting Spoke Cavity Coupler status. T. Khabiboulline Power Coupler design for Superconducting Spoke cavities. Originally.
Guillaume Olry on behalf the IPN Orsay SPIRAL2 team TTC Meeting – Milan, 28 Feb-3 March 2011.
R&D for Fundamental Power Coupler in SRF Mass-Production
Tongming Huang (IHEP) On behalf of the power coupler working group
Completion of the MICE-US construction project
Field Emission Minimization for LCLS-II
Pulsed Energetic Condensation of Nb Thin Film Cavities at JLab
Sub-system integration for the VBOX
at STFC Daresbury laboratory
DESY Experiences on Use of Gas overlay during Assemblies
Mark Pendleton – STFC Daresbury Laboratory
Study of vacuum stability at cryogenic temperature
SAES Project: Combination of NEG module and sputter ion pump
K. H. Lee, H. Y. Lee, Young-Gi Kim, J. Yang, S. M. Yang, K.J. Chung, Y.S. Na and Y. S. Hwang Residual Gas analysis during Glow discharge cleaning, Baking.
THE HIE-ISOLDE SUPERCONDUCTING CAVITIES:
Mathieu, Gabriel, Max, Spyros, Guillaume
S0 Status report from KEK
C50 Cavity pair Assembly Changes
Manufacturing of the IFMIF series power couplers
FKPPL and FJPPL Joint Workshop
STFC Contributions to the FCC Study
Study of vacuum stability at cryogenic temperature
WP 3 coordination meeting Saclay May 2008
Main Coupler R&D at DESY
High Power Couplers and… pushing the limits of SC cavities
-Honors Thesis Defense- In Situ Ellipsometry of Surfaces in an Ultrahigh Vacuum Thin Film Deposition Chamber Joseph Choi Department of Physics and Astronomy,
Plasma Cleaning Safety Presentation
IMP Cryomodule Assembly and Alignment
INSTITUTE OF HIGH ENERGY PHYSICS
Cryomodules Challenges for PERLE
Prototype cryomodule development
European Coordination for Accelerator Research & Development
Presentation transcript:

LALEucard WP IN2P3 Les deux infinis IN2P3 Les deux infinis W. Kaabi, Y. Peinaud, A. Thiebault, E. Herry, A. Variola. M. Lacroix, B. Mercier and C. Prevost Eucard WP 10.8 (LAL, 8 April, 2010) Eucard WP10.8

LALEucard WP IN2P3 Les deux infinis  Introduction  Automatic Cleaning System  High Pressure Rinsing (HPR)  Plasma Discharge Cleaning  Conclusion Eucard WP 10.8 Summary

LALEucard WP IN2P3 Les deux infinis Introduction Warm coupler part Cold coupler part Coupler preparation 3 Weeks Coupler parts after manufacturing Cryomodule assembly Eucard WP 10.8

LALEucard WP IN2P3 Les deux infinis Process LAL Eucard WP Clean with alcoholised tissues Place the parts in the MAS Place the piece in the bath Full and warm the bath (detergent+water) Ultrasonic bath Rinse the pieces Dry under laminar flow Count the particules Bake under vacuum Dirty coldparts and test waveguide Assemble the parts Make a leak check Place the assembly in the MAS Place it in oven, start the TurboPumps Start the oven Start the ionic pump & stop the turbo pump Assemble the Waveguide box in ISO5 RF adjustement & conditioning Partial unassembling & Packing Dust « free » surfaces Pieces in the MAS Pieces in the bath T=50°C Time=15min Resistivity > 14MOhm.cm 48h Nb (size>0.3µm) <10part/foot3 Time=24h Parts assembled Assembly leak checked Assembly in the MAS Assembly in the oven under vacuum Time=72hours Ionic pump started & turbo pump stoped Waveguide box assembled Coupler conditionned Packed Delivery Clean Dressing Room ISO 6 (class1000) Material Air Shower Air Shower ISO4 (class10) Dirty Dressing Room Oven Bench Rinsing sink Ultrasonic bath Mobile clean room ISO 5 (class100) In-situ baking oven 13 RF conditionning area LAL infrastructure

LALEucard WP IN2P3 Les deux infinis Introduction Clean with alcoholised tissues Place the parts in the MAS Place the piece in the bath Full and warm the bath (detergent+water) Ultrasonic bath Rinse the pieces Dry under laminar flow Count the particules Bake under vacuum Dirty coldparts and test waveguide Assemble the parts Make a leak check Place the assembly in the MAS Place it in oven, start the TurboPumps Start the oven Start the ionic pump & stop the turbo pump Assemble the Waveguide box in ISO5 RF adjustement & conditioning Partial unassembling & Packing Dust « free » surfaces Pieces in the MAS Pieces in the bath T=50°C Time=15min Resistivity > 14MOhm.cm 48h Nb (size>0.3µm) <10part/foot3 Time=24h Parts assembled Assembly leak checked Assembly in the MAS Assembly in the oven under vacuum Time=72hours Ionic pump started & turbo pump stoped Waveguide box assembled Coupler conditionned Packed Delivery Cleaning Assembling Desorption Conditioning Time in days Assembly schedule  Improvements in term of quality, reapetability & time for mass production Eucard WP 10.8

LALEucard WP IN2P3 Les deux infinis  Introduction  Automatic Cleaning System  Actual LAL cleaning steps  Integration  Motion  Logical synoptic  Simulation  Schedule  High Pressure Rinsing (HPR)  Plasma Discharge Cleaning  Conclusion Eucard WP 10.8 Summary

LALEucard WP IN2P3 Les deux infinis Clean with alcoholised tissues dust « free » surfaces Place the parts in the MAS Pieces in the MAS Place the piece in the bath Pieces in the bath Full and warm the bath (detergent+water) T=50°C Ultrasonic bath Time=15min Rinse the pieces Resistivity > 14MOhm.cm Dry under laminar flow 48h Count the particules Nb (size>0.3µm)<10part/pieds3 Bake under vacuum Time=24h Dirty coldparts and test waveguide Assemble the pieces Clean Dressing Room ISO 6 (class1000) Material Air Shower Air Shower ISO4 (class10) Dirty Dressing Room Oven Bench Rinsing sink Ultrasonic bath  Actual LAL cleaning steps Drawbacks of our actual process: -Total time> 120h -No repeatability of the process -Pollution risk on pieces between each steps Automatic Cleaning System Eucard WP 10.8

LALEucard WP IN2P3 Les deux infinis Clean with alcoholised tissues dust « free » surfaces Place the parts in the MAS Pieces in the MAS Place the piece in the bath Pieces in the bath Full and warm the bath (detergent+water) T=50°C Ultrasonic bath Time=15min Rinse the pieces Resistivity > 14MOhm.cm Dry under laminar flow 48h Count the particules Nb (size>0.3µm)<10part/pieds3 Bake under vacuum Time=24h Dirty coldparts and test waveguide Assemble the pieces Clean Dressing Room ISO 6 (class1000) Material Air Shower Air Shower ISO4 (class10) Dirty Dressing Room Oven Bench Rinsing sink Ultrasonic bath Drawbacks of our actual process: -Total time> 120h -No repeatability of the process -Pollution risk on pieces between each steps  Actual LAL cleaning steps The solution is an automatic system which will: -Reduce the total time and work as a background task (during the night for example) -Improve the repeatability of the process -Suppress the pollution risk of pieces between the steps Automatic Cleaning System Eucard WP 10.8

LALEucard WP IN2P3 Les deux infinis  Actual LAL cleaning steps  Logical Synoptic: Full cleaning cycle  Ultrasonic washing  Rinsing  Resistivity measurement  Particle counting  Nitrogen Drying  Humidity measurement Automatic Cleaning System Eucard WP 10.8

LALEucard WP IN2P3 Les deux infinis  Actual LAL cleaning steps  Logical synoptic  Motion:  A first rotation around the pieces axle  A second rotation around the axle of the device Automatic Cleaning System 360 ° +/- 180 ° Test waveguide Bellow Ceramic Cold parts Eucard WP 10.8

LALEucard WP IN2P3 Les deux infinis Automatic Cleaning System  Actual LAL cleaning steps  Logical synoptic  Motion  Integration:  Service hatch  No room contamination  The machine can be load and started by outside  Solution easier to design Wall Clean room ISO 4 Hall (dirty environment) INOUT Eucard WP 10.8

LALEucard WP IN2P3 Les deux infinis  Actual LAL cleaning steps  Logical synoptic  Motion  Integration Automatic Cleaning System Clean Dressing Room ISO 6 (class1000) Material Air Shower Air Shower ISO4 (class10) Dirty Dressing Room Cleaning Machine Bench Rinsing sink Ultrasonic bath Machine loading Loaded parts Machine Cycle End of machine cycle Machine unloading Exited parts Cold (or warm) parts and test waveguide Parts assembly Eucard WP 10.8

LALEucard WP IN2P3 Les deux infinis  Actual LAL cleaning steps  Logical Synoptic  Motion  Integration  Simulation Automatic Cleaning System Eucard WP 10.8

LALEucard WP IN2P3 Les deux infinis Automatic Cleaning System  Actual LAL cleaning steps  Logical Synoptic  Motion  Integration  Simulation  Schedule  Fonctional specifications  on going, dead line June 2010  Sub-contractor researches  on going, dead line September 2010  Selection of the manufacturing way in October 2010 : In our laboratory or outside Eucard WP 10.8

LALEucard WP IN2P3 Les deux infinis Sum up of our goals:  Make a prototype  Optimise the cleaning parameters  Let the prototype updatable, for option:  Acide cleaning (reduction of the copper oxydation)  Alcohol rinsing to optimse the drying step  High Pressure Rinsing (HPR) to be closer than the cavity cleanliness Automatic Cleaning System Eucard WP 10.8

LALEucard WP IN2P3 Les deux infinis  Introduction  Automatic Cleaning System  High Pressure Rinsing (HPR)  Goals  Difficulties to manage  Ceramic window  First tests  Next steps  Plasma Discharge Cleaning  Conclusion Summary Eucard WP 10.8

LALEucard WP IN2P3 Les deux infinis  Goals  High pressure rinsing (HPR) is nowadays routinely used in the process of superconducting RF cavities assembly to remove residuals from the resonator wall.  The aim of our study is to:  Submit the coupler to the same treatment in order to ameliorate the rinsing step in our cleaning procedure.  Consider the possibility to integrate an HPR in the automatic coupler cleaning machine High Pressure Rinsing (HPR) Eucard WP 10.8

LALEucard WP IN2P3 Les deux infinis  Goals  Weakest pieces  Copper coating on the bellows  TiN coating on the ceramic surface (used to avoid multipactor)  TiN coating on brazed junction between the ceramic and its sleeve (used to make an electrical continuity) High Pressure Rinsing (HPR) Eucard WP 10.8 Bellows Ceramic windows Cold part Ceramic-copper brazing covered by TiN deposit TiN coated surface (~ 15 nm)

LALEucard WP IN2P3 Les deux infinis  Goals  Weakest pieces  First tests  HPR rinsing primary tests were performed on ceramic windows & copper coated bellows (thanks to P. Szott & A. Stephen for these tests at IPNO). The goal was to check if the TiN coating and the copper coating can be removed after the operation:  After these tests, we didn’t distinguish any visual difference (no peel off, and no discoloration). High Pressure Rinsing (HPR) Eucard WP 10.8

LALEucard WP IN2P3 Les deux infinis  Goals  Weakest pieces  First tests  Next steps:  To simulate different part of the coupler in using samples in order to be able to measure them (already done)  TiN coating on:  Ceramic  Copper  brazing material (link between ceramic and copper)  Copper coating on stainless steel  To characterise the sample before and after HPR, we will:  Visualise with Scanning electron microscopy (SEM)  Measure the coating thickness  Measure the film composition High Pressure Rinsing (HPR) Eucard WP 10.8

LALEucard WP IN2P3 Les deux infinis  Introduction  Automatic Cleaning System  High Pressure Rinsing (HPR)  Plasma Discharge Cleaning  Goals  Principal  Effect of oxygen addition in gas discharge  Consequences of plasma discharge cleaning  Procedure monitoring  Conclusion Eucard WP 10.8 Summary

LALEucard WP IN2P3 Les deux infinis Process LAL Eucard WP Clean with alcoholised tissues Place the parts in the MAS Place the piece in the bath Full and warm the bath (detergent+water) Ultrasonic bath Rinse the pieces Dry under laminar flow Count the particules Bake under vacuum Dirty coldparts and test waveguide Assemble the parts Make a leak check Place the assembly in the MAS Place it in oven, start the TurboPumps Start the oven Start the ionic pump & stop the turbo pump Assemble the Waveguide box in ISO5 RF adjustement & conditioning Partial unassembling & Packing Dust « free » surfaces Pieces in the MAS Pieces in the bath T=50°C Time=15min Resistivity > 14MOhm.cm 48h Nb (size>0.3µm) <10part/foot3 Time=24h Parts assembled Assembly leak checked Assembly in the MAS Assembly in the oven under vacuum Time=72hours Ionic pump started & turbo pump stoped Waveguide box assembled Coupler conditionned Packed Delivery Clean Dressing Room ISO 6 (class1000) Material Air Shower Air Shower ISO4 (class10) Dirty Dressing Room Oven Bench Rinsing sink Ultrasonic bath Mobile clean room ISO 5 (class100) In-situ baking oven 13 RF conditionning area LAL infrastructure

LALEucard WP IN2P3 Les deux infinis  Goals  Test a new surface treatment procedure to decrease the degassing surface rate  Observe the effects of such treatment on coupler conditioning procedure  Suppress the in-situ baking step (72h) Plasma Discharge Cleaning Eucard WP 10.8

LALEucard WP IN2P3 Les deux infinis + Ar + C C ad C C  Goals  Principal  Create a plasma discharge in an Argon gas at around 10-1 mbar and produce a cleaning of the surface by ion bombardment.  Two mechanisms can occur during surface bombardment by gas discharge ions:  Gas molecules desorption  Secondary ion emission or/and sputtering of surface elements (carbon, oxides, surface material) Plasma Discharge Cleaning Eucard WP 10.8

LALEucard WP IN2P3 Les deux infinis + Ar + O2O2 OC C O2+O2+ O+O+ ad O C C  Goals  Principal  Effect of oxygen addition in gas discharge  A low percentage of Oxygen is added to:  Increase ions secondary emission yield  O2+ and O+ ions creation in the discharge in order to react with carbon emitted from the surface to form CO2 and CO pumped in the laminar flux  Create instable surface metallic oxides, easily eliminated by the discharge, that avoid exposed surfaces contamination by metallic emitted ions Plasma Discharge Cleaning Eucard WP 10.8

LALEucard WP IN2P3 Les deux infinis  Goals  Principal  Effect of oxygen addition in gas discharge  Consequences of plasma discharge cleaning  Gas molecules desorption:  (+) Diminution of the surface degassing rate  benefic for the conditioning procedure  Ions secondary emission (or sputtering) of carbon:  (+) The carbon form on the surface is a good trap for gas adsorbed, its elimination will facilitate gas desorption.  (-) The carbon plays a positive role in lowering SEY, its elimination may increase this surface parameter.  Modification of the surface shape:  (+) Ions secondary emission and element sputtering cause surface roughness change. This point is benefic to lowering the SEY of the surface and thus decrease the surface electronic activity.  All this aspect have to be controlled for a better optimization of procedure parameters. Plasma Discharge Cleaning Eucard WP 10.8

LALEucard WP IN2P3 Les deux infinis Gas molecules desorption RGA monitoring Ions secondary emission (and/or sputtering) of surface elements (especially carbon) RGA monitoring SEY measurement of treated surface Surface state modification by plasma eaching SEM observation SEY measurement of treated surface  Goals  Principal  Effect of oxygen addition in gas discharge  Consequences of plasma discharge cleaning  Procedure monitoring  A monitoring before, during and after plasma discharge cleaning will be done to judge the efficiency of the procedure and will permit to optimize parameters and duration Plasma Discharge Cleaning Eucard WP 10.8

LALEucard WP IN2P3 Les deux infinis  Goals  Principal  Effect of oxygen addition in gas discharge  Consequences of plasma discharge cleaning  Procedure monitoring  Plasma discharge cleaning of power coupler  Gas discharge introduction into internal coupler part  Controlled pumping to reach 10-1 mbar pressure and create a laminar pumping flux  Direct current bias application with a positive antenna voltage and a grounded coupler corps  Plasma creation at all power coupler internal parts + Gas inlet Pumping Plasma Discharge Cleaning Eucard WP 10.8

LALEucard WP IN2P3 Les deux infinis  Goals  Principal  Effect of oxygen addition in gas discharge  Consequences of plasma discharge cleaning  Procedure monitoring  Plasma discharge cleaning of power coupler  Experimental assemblies  First step: tests on sample in chamber with an antenna  Second step: Treatment of two cold coupler parts plug on the transition wave guide box (TWG)  Gas inlet in the top of cold coupler parts and pumping at the exit of the TWG to get a laminar flux  The RGA for pumped gas analysis  Copper samples could be placed at the internal of the coupler for SEY measurements after treatment. R.G.A Gauge Cold part Transition wave guide box (TWG) DN16CF viewport All metal valve DN40CF All metal valve DN16CF Adaptator DN40KF for turbo pumping Plasma Discharge Cleaning Eucard WP 10.8

LALEucard WP IN2P3 Les deux infinis Plasma Discharge Cleaning  Goals  Principal  Effect of oxygen addition in gas discharge  Consequences of plasma discharge cleaning  Procedure monitoring  Plasma discharge cleaning of power coupler  Experimental assembly  Accomplished tasks:  Equipments ordered and delivered to the lab  Installation and first experiments plan within 2 months  Next steps:  Understand the action of each cleaning discharge parameters (gas composition, antenna voltage, gas flow rate, vacuum level…)  Optimize the parameter and define a procedure for coupler application Eucard WP 10.8

LALEucard WP IN2P3 Les deux infinis  Automatic Cleaning System  A great challenge, and an important step in term of quality, repeatability and time for large mass production (for example ILC)  A lot have to be done but we are really motivated to do it  HPR  An other step to improve the coupler cleanliness to be closer to the cavity cleanliness  Similar amount of work, and same motivation than the previous task  Plasma Discharge Cleaning  A very interesting alternative to the in-situ baking with a deeper action  ….. Thank you for you attention, any question??? Eucard WP 10.8 Conclusion