Commissioning Alistair Walker NOAO/CTIO 9/30/2016 1 DES Collaboration Meeting October 20 2010.

Slides:



Advertisements
Similar presentations
DECam Community Pipeline Review Closeout Presentation DES Council of Directors’ Review August 30-31, 2010 NCSA, Urbana IL.
Advertisements

All rights reserved © Altec ExoMars 2018 Rover Operations Control Centre Plans for rover operations training at ROCC M. Cinato.
Cost, Schedule & Funding Closeout Jan Joint DOE/NSF CD2/3a Review 1 DOE/NSF Review of the Dark Energy Survey (DES) Project SC 6/7 Cost, Schedule.
System-wide issues Before we get to the telescope System integration and verification at the telescope Operations Maintenance and support.
The KPNO 4m “Mayall” Telescope Arjun Dey (NOAO). National Optical Astronomy Observatory Mission: provide the best ground-based astronomical capabilities.
CTIO: DECam Installation, Commissioning, & Operations Oct DES Collab Meeting Philadelphia R. Chris Smith CTIO/NOAO.
Commissioning the NOAO Data Management System Howard H. Lanning, Rob Seaman, Chris Smith (National Optical Astronomy Observatory, Data Products Program)
Hunt for Molecules, Paris, 2005-Sep-20 Software Development for ALMA Robert LUCAS IRAM Grenoble France.
FLAO commissioning with InfraRed Test Camera (IRTC) S. Esposito, G. Brusa, A. Riccardi FLAO system external review, Florence, 30/31 March 2009.
Telescope Integration and Tests Tuesday Afternoon.
LSST Camera CD-3 Review Brookhaven National Laboratory, Brookhaven, NY LSST Safety Council Camera Review Bremerton, WA 2015 LSST Camera Environment,
John Peoples for the DES Collaboration BIRP Review August 12, 2004 Tucson1 DES Management  Survey Organization  Survey Deliverables  Proposed funding.
CTIO and the Dark Energy Camera Prepared for the CD-1 Director’s Review Tuesday, July 25, 2006 Fermilab Alistair R. Walker.
The Active Optics System S. Thomas and the AO team.
Dark Energy Survey (DES) (Presenter: Douglas Tucker) DES is observing (Aug. 15 th – Feb. 15 th ) Year 2 Operations Collaboration Meeting in Sussex, UK,
3.1.1 Optics, Optical Corrector, Mechanical Systems M. Johns, C. Claver.
What the Data Products Program Offers Users Todd Boroson Dick Shaw Presentation to NOAO Users Committee October 23, 2003.
1 The DES Calibrations Effort Douglas L. Tucker (DES Calibrations Scientist) DES NSF/DOE Review, 8-9 June 2009 The DES Calibrations Effort has connections.
Mountaintop Software for the Dark Energy Camera Jon Thaler 1, T. Abbott 2, I. Karliner 1, T. Qian 1, K. Honscheid 3, W. Merritt 4, L. Buckley-Geer 4 1.
Brenna Flaugher, PMG, April 6, 2007 DECam Funding Need Profile (Dec 06) (then yr $, Overhead included) This gave a technically driven schedule resulting.
Tim Abbott & Brenna Flaugher, CTIO Integration Meeting 1 The DECam Project Closeout, Action Items Hexapod Optical Lenses CCD Readout Filters Shutter 2008.
Alistair Walker - DECam Instrument Scientist Tim Abbott – Blanco Telescope Scientist CTIO/NOAO DES Collaboration Meeting Oct The Blanco Telescope.
DECam in Overview Alistair Walker Version 3 December Ver 4 Updates Jan
The Blanco Environmental Control System Alistair R. Walker November
Commissioning Planning
LSST Commissioning Overview and Data Plan Charles (Chuck) Claver Beth Willman LSST System Scientist LSST Deputy Director SAC Meeting.
Department of Higher Education and Training
Blanco Telescope and DECam Alistair Walker ACTR meeting 22 March 2013
Technical resources schedule
Agenda ComCam planning and scheduling (James & Jacques) CCS & CCS-TCS Interface (Tony) Software to use ComCam Software to get data out of ComCam (Mike)
Telescope Assembly, Integration and Verification (AIV) WBS 04C. 14 J
Blanco F/8 Status AURA Observatory Council, Tucson, 3/2013.
Blanco Environmental Control System
Project Cycle Management
PRR Activation Meeting
LSST Commissioning Overview and Data Plan Charles (Chuck) Claver Beth Willman LSST System Scientist LSST Deputy Director SAC Meeting.
The Continuum of Interventions in a 3 Tier Model
LSST Commissioning: FY18 Planning
Software and Systems Integration
Intracompany Stock Transfer Scenario Overview
GLAST Large Area Telescope:
Alistair Walker Version 3 December
CS 5150 Software Engineering
IEEE Std 1074: Standard for Software Lifecycle
DECam Filter/Shutter Installation and Filters Installation
COSMOS Status David Sprayberry, Sean Points & Jay Elias
Blanco Telescope and DECam Alistair Walker ACTR meeting 22 March ver 2
Chuck F Claver LSST System Scientist & Commissioning Lead
Intracompany Stock Transfer Scenario Overview
Introduction to Internal Audits
FHWA Bicycle and Pedestrian Program
DOE: Transition from MIE to Early Operations Kevin Reil LSST Camera Commissioning Lead LSST Commissioning Plan Review January 24-26, 2017.
Engineering Processes
Management Breakout: MREFC Budget Summary Victor L
OCS Scheduler Status Francisco Delgado T&S Software Manager
Software & Hardware for Wavefront Estimation Pipeline Development Te-Wei Tsai Software Engineer Joint Technical Meeting March 6, 2017.
Systems Analysis and Design
Launch and On-orbit Checkout
EVLA Advisory Committee Meeting
Click to add title Planning for LSST Verification George Angeli LSST All Hands Meeting Tucson August 15, 2016.
Gathering Systems Requirements
Intracompany Stock Transfer Scenario Overview
Gustaaf van Moorsel September 9, 2003
Orange ASP Training Module
LGS Project Meeting December 21, 2006 Agenda SWIFT update - A. Bouchez
NERC Reliability Standards Development Plan
NERC Reliability Standards Development Plan
USP-IAG Universidade de São Paulo
Gathering Systems Requirements
FEMA Emergency Management Institute
Presentation transcript:

Commissioning Alistair Walker NOAO/CTIO 9/30/ DES Collaboration Meeting October

When? After (most of) the integration & installation is done Including science verification, October 2011 – January 2012 This is only one year away!! 2011B semester. Announcement to community on March , Proposals due March 31, TAC meets early May, scheduling finalized early June. 9/30/2016 DES Collaboration Meeting October

3 Commissioning – top level Largely a science driven activity – an integrated program to verify that DECam is ready for DES science and for use by the NOAO community The aim will be, as much as possible, to test the Blanco Telescope and DECam as a system to identify unreliability, latencies, inefficiencies, interface problems, software bugs, etc. We need to: –Test DECam and the Community Pipeline –Test the DESDM system and the science analysis modules –Verify the operation of the Data Transport System and check there are no network or firewall issues Documentation: –DES Projects Requirements Acceptance Testing (DES-doc 4304) –DES Projects Requirements Acceptance Testing Matrix (DES-doc 3533) –DES Science Acceptance Test Plan (due 3/2011) –DECam System Commissioning Plan (DES-doc 3734, last updated June ) 9/30/2016 DES Collaboration Meeting October

4 Commissioning top level - II Performance –Verify that installation on the telescope has not degraded DECam’s performance –Evaluate optical performance of telescope + corrector + filters –Test and calibrate telescope-camera controllable systems (focusing, alignment, guiding) –Collect astronomical and calibration data that will allow testing of the two pipelines And keeping it that way… –Check stability of DECam performance –Test the robustness (fault tolerance) of everything –Determine operational efficiency And learning –Practice procedures such as filter changing, F/8 changing, calibration procedures – often these will be daytime activities –Conduct operations training, complete documentation –Evaluate safety And transitioning to science –Undertake science analyses with real data 9/30/2016 DES Collaboration Meeting October

5 Strategy The Imager/FEE and the Optical Corrector will be the last parts of DECam to arrive at CTIO. All the earlier-arriving parts should have been tested and the off-telescope installations completed by the time they arrive. The Imager will then be verified to have arrived undamaged and be functional. Additionally, we will verify that the Optical Corrector is undamaged and is lined-up. We can complete the PF cage installation and begin commissioning while further Imager testing on the floor is still underway. Part 1 - F/8 mirror optical alignment – this requires the cage only, in principle Part 2- Install C5 onto the imager counterweight and test the optics with SBIG cameras/ wave-front sensors Part 3 Install the Imager and FEE crates, then full system tests 9/30/2016 DES Collaboration Meeting October

Commissioning Schedule 6 Follows Installation 1 On-sky F/8 Focus & Alignment tests - 1 week + 1 week contingency 2 Time Gap (could be zero)3 On-sky optics tests - 1 week4 Time Gap – one or two weeks (F/8 observing, or engineering)5 Imager Installation & Check - 2 weeks (off sky)6 Commissioning Phase One tests – 2 weeks7 Time gap TBD (F/8 observing) – 2 weeks8 Commissioning Phase II tests (2 weeks)9 Time Gap (?) (F/8 observing) 10 Short Eng Block, then SV September 30, 2016 DOE-NSF REVIEW June

Part I – test F/8 Pre-requisites –The cage will have been positioned in x,y,z and tilt during installation (DES-doc 3800) –The Imager counterweight and the F/8 counterweight will be installed –The operation of the F/8 handler will be have been verified –The F/8 control system will be the same as pre-DECam –ISPI and IMAN installed at F/8 Commissioning Tasks –Removal of counterweight & installation of F/8 –Verify correction operation of F/8 focus and tilt control –Analyze optical performance with IMAN, do a sky map and build LUT –Remove F/8 mirror partially, restore, repeat above –Confirm performance by using ISPI –Remove F/8 mirror and replace counterweight (scheduled time could be inserted here) Time –7 nights 9/30/2016 DES Collaboration Meeting October

Part II – Test DECam Optics Pre-requisites –Phase I completed –Corrector (all of C1-C5) installed, DECam filters installed, shutter installed (?), SBIG camera system installed, hexapods functional, SISPI control Tools –PF Shack Hartmann WFS –PF Hartmann Screen –BCams –SBIG cameras, Shack Hartmann lenslets –Software tools 9/30/2016 DES Collaboration Meeting October

Part II Continued Basic tests with the telescope at zenith –Focus, is it where expected? –Establish collimation –Use radial cameras to establish tilt, set hexapod suitably –Evaluate image quality at zenith. Do the filters seem OK? Tests at a variety of sky positions –Evaluate image quality over the sky, build a LUT for top end deflections (with BCams, may have done this as part of installation) –Focus as a function of sky position, temperature, filter –Check LUT for the primary mirror active optics –Correlate with DIMM, ECS sensors etc 9/30/2016 DES Collaboration Meeting October

Part II continued Time – basic tests – 3 nights –multiple sky position tests – 5 nights Afterwards; –Remove SBIG cameras –Remove C5 Then, options –Reinstall F/8 mirror and observe with a block of F8 –Other Imager pre-installation activities 9/30/2016 DES Collaboration Meeting October

Part III Pre-requisites –DECam Imager installed and has passed its functional tests –Everything is talking & listening… Activities can be grouped into –Engineering/monitoring activities –Daytime calibrations and exercising SISPI –Night time activities –Evaluation Night time activities –Image quality (getting it, and keeping it) –Guiding, short slews –Photometry and astrometry –Does everything play together? Efficiently? 9/30/2016 DES Collaboration Meeting October

Keeping it Altogether Team & tasks –Night Crew – runs the night time tests. Not too many people in the control room!!!! –Day Crew – Responds to night time problems and runs any day time tests, takes calibrations. –Remote Crew – La Serena, Urbana-Champagne, Tucson, Fermilab, DES Institutes: run pipelines, science teams look at data, provide specialist support as and when needed by phone, video, net –The on-site team will be made up from DECam Project people and CTIO staff. Wiki, observing log book JIRA Strict control of software versions Daily planning meetings in the late afternoon (30 min) Flexibility – things WILL not go entirely to plan 9/30/2016 DES Collaboration Meeting October

Immediate Post-Commissioning Community science verification time –How it works Two several night programs from experienced teams, selected by special TAC Chosen for both science impact and for exercising the equipment The teams sign up for rapid data reduction and publication Proprietary time set to zero to encourage this! –Why? Allows community to access real DECam data early, to help them plan their own programs This model was very successful with NEWFIRM DES verification time –Do a mini-survey using DES protocols 13 9/30/2016 DES Collaboration Meeting October

What’s Next? We will specify engineering and science support through commissioning- verification-operations, and plan for “reality” rather than optimistic scenarios We will incorporate the DES Science Acceptance Test Plan as soon as it is available We will update the DECam System Commissioning Plan as the simulator and integration tests proceed, as calibration plans evolve, etc. The schedule for integration -> installation -> commissioning -> Science verification will be developed in detail over the next 12 6 month –(Integration/Installation meeting in La Serena, early March 2011 – DOE-NSF Operations Review in May 2011(?) 9/30/2016 DES Collaboration Meeting October

The End 15 9/30/2016 DES Collaboration Meeting October

NOAO Goldberg Fellowship Fellowship at NOAO (Chile or Tucson) –Encourage participation in long-term projects –Encourage participation in ongoing NOAO activities, DES/DECam, Other new Blanco instrumentats (COSMOS, TripleSpec) LSST Term: 5 years –4 years at either NOAO site (or both) –1 year at any U.S. institution of choice