UK Project Plan Roy Preece STFC RAL RLSR 26 th October 2015.

Slides:



Advertisements
Similar presentations
Report from MICE project teams Proposed MICE organogram: revised Revised request for resources for financial year 2003/04 Review of iMICE schedules – status.
Advertisements

1 UK Project Alan Grant, STFC. Finance How savings are made Update on stepIV position Milestones Critical Path - stepIV Concerns 2.
1 MICE Project Board Schedule and risk discussion Introduction Project Management comment Schedule considerations Adapting the schedule/reacting to circumstances.
Project Managers Update Roy Preece Particle Physics Department, STFC MICE Video Conference, 18 th September 2014.
Paul drumm; 1 st December 2004; PM&TB Report 1 Project Management & Technical Board Reports.
Global Magnet Systems including Field Mapping MICE Project Board 28 th June 2011 M Courthold – RAL R Preece - RAL.
MICE FAC Alain Blondel 7 October   MICE The International Muon Ionization Cooling Experiment MICE CM19.
UK Costs Beam & Infrastructure Coils Tracking Detector.
Update Hardware for conductive cooling of the quench resistors has been fabricated at LBNL. Preparation for installation to start this week. Installation.
Project Managers Report Video Conference 172 Roy Preece 11 th December 2014.
Alan Grant OsC 30/4/ UK Project Finance & Schedule.
Overview and status of international systems Reminder of the principal deliverables Status reports on: Spectrometer solenoids Radio Frequency Coupling.
1 UK PM Report Costs & Schedule Alan Grant, STFC.
1 MICE PM Report Completion of Infrastructure Target, solenoids Phase Two planning & schedule Non-MICE costs Staffing & visitors Don’t have time for a.
U.S. MICE Schedule, Cost, & Risks Peter H. Garbincius Mark Palmer, Alan Bross, Rich Krull Fermilab Presented at RAL – November 13, 2013.
1 MICE CM28 PM Report Progress since CM27 Schedule, dates, milestones Electrical substation Visiting RAL Andy Nichols, STFC 4 th October 2010.
Magnetic Shielding Issues Roy Preece STFC - RAL. Overview Issues Items in harms way – Step IV Step IV mitigation plan –Racks –Compressors Current / Future.
RSLR mtg 28/3/2014 RLSR mtg Alan Grant. 2 RLSR mtg 28/3/ MICE Finances - Forward Look.
Executive Board Meeting Roy Preece 23rd May 2014
Electrical Integration CM38 Steve Griffiths & Ian Mullacrane.
Schedule and Work We are moving into a very intensive 4 months with a lot of work to be carried out Electrical services to the devices – after the South.
Electrical & Control Power Supplies Trevor Hartnett.
Status of the MICE Project & Dashboard MICE Project Board 14 th November 2013 Roy Preece.
Spectrometer Solenoid Overview Roy Preece 31 st January 2011.
U.S. Muon Accelerator Program: MICE Milestones & Resource-Loaded Schedule M. A. Palmer, Director October 31, 2012.
Spectrometer Solenoid Fabrication & Testing Update Steve Virostek Lawrence Berkeley National Lab MICE CM25 at RAL November 6, 2009.
RLSR 16/4/2015 UK Financial Plan & Risks. Content Finances – Cost to Completion Risks – Top level to completion – R9 working space – Summary 2 RLSR 24/11/2014.
Project Managers Report CM40 Collaboration Board – Rome Roy Preece 28 th October 2014.
Spectrometer Solenoid Schedule MICE Schedule Review May 23 rd 2011 Roy Preece (STFC RAL, LBNL)
UK Update Package Managers Meeting 001 Roy Preece 13 th January 2014.
MICE Oversight Committee Meeting RAL, 24 April 2014 Paul Soler on behalf of the MICE Collaboration Status of MICE and Spectrometer Solenoids.
1 MICE CM27 PM Report Re-defining the UK project this FY Schedule things Apologies and accommodation Andy Nichols, STFC 7 th July, 2010.
Paul Drumm, cm10, 27 Oct 2004 MICE Project Report Paul Drumm Collaboration Meeting 10 Rutherford Appleton Laboratory October 2004.
OsC mtg 24/4/2014 OsC mtg Alan Grant. 2 OsC mtg 24/4/ MICE Finances - Forward Look.
1 Mice Collaboration Meeting CM33 Glasgow University 25 th – 29 th June 2012 STFC Daresbury Laboratory Electrical Infrastructure Report Authors : Ian Mullacrane.
MICE Funding Update (U.S.) Michael S. Zisman Deputy Spokesmouse Center for Beam Physics Lawrence Berkeley National Laboratory CMPB Meeting August 1, 2007.
1 UK PM Report Costs & Schedule Alan Grant, STFC.
MICE CM20 Alain Blondel 10 February The International Muon Ionization Cooling Experiment MICE CM20 Spokesmouse remarks.
Iouri Ivaniouchenkov RAL Specifying the needs for MICE July 8, RAL MICE Collaboration Meeting 1.
Status of the MICE Construction Project Resource Loaded Schedule Review 29 th April 2014 Roy Preece.
CLIC Permanent Magnet Quadrupole Engineering Development update Norbert Collomb, STFC Daresbury Laboratory 1N. Collomb 03/10/2011.
OsC mtg 15/10/2014 MICE Step IV Alan Grant. Content Step IV – Construction Status – Finances – Schedule – Risks – Summary 2.
Finance Roy Preece STFC RAL Oversight Committee Meeting 27 th November 2015.
MICE – UK Plan Roy Preece STFC RAL DOE Review of MAP Brookhaven National Laboratory 13 th August 2014.
MICE Coupling Coil Update Allan DeMello Lawrence Berkeley National Laboratory Illinois Institute of Technology June 17, 2013 June 17, 2013.
1 UK Project Roy Preece – STFC Alan Grant, STFC. Finance Staffing Update on stepIV position Milestones Critical Path – stepIV Magnetic field mitigation.
Tuesday 9 th January Project Status Report Project Achievements Project Schedule Issues Finance Summary Risk Register Photos.
RLSR 16/4/2015 UK Financial Plan & Risks. Content Finances – FY 2014/15 – Cost to Completion Risks – Top level to completion – R9 working space – Summary.
PSAG mtg 3/2/2014 PSAG mtg Alan Grant. 2 PSAG mtg 3/2/ MICE Finances FY 2013/14.
US Project Plan for MICE Peter H. Garbincius, Mark Palmer, Alan Bross, Rich Krull Fermilab April 5, 2016.
UK Project Plan (Finance & Risk) Alan Grant STFC DL RLSR 5 th April 2016.
The MAP 3-Year Plan Mark Palmer Fermilab September 26, 2014.
Schedule to completion, Risk and Critical Interfaces Roy Preece STFC RAL RLSR 16 th April 2015.
Schedule and Milestones Roy Preece STFC RAL FAC 17 th April 2015.
1 UK Project Finance & Schedule. Overview Finance  Budget Setting 2013/14  June Finance  Forward look to complete stepVI Schedule  Overview 2.
Schedule and Milestones Colin Whyte STFC RAL Resource Loaded Schedule Review 5 th April 2016.
US Project Plan for MICE Peter H. Garbincius, Mark Palmer, Alan Bross, Rich Krull Fermilab April 16, 2015.
Radiation Shutter Re-Purposing Roy Preece STFC RAL 18 th December 2014.
Project Managers Report CM38 – Napa Roy Preece 24th February 2014.
Reported by Ron Prwivo for Ian Robson. Overview Response to Recommendations from the RLSR of November 2014 – very good, RF staffing remains an issue Very.
CBETA Project ALD’s Cost and Schedule Review February 6, 2017
Muon Ionisation Cooling Experiment Overview
Resource Loaded Schedule and Budget Profile
Status of the MICE Construction Project
Outcome of the Review and Response to Recommendations
UK Financial Plan & Risks
Spectrometer Solenoid Update
MICE Project in the US: Completion of Efforts
Management Breakout: MREFC Budget Summary Victor L
SNS-PPU upgrades the existing accelerator structure
Presentation transcript:

UK Project Plan Roy Preece STFC RAL RLSR 26 th October 2015

Content Finance – Cost to Complete – RF plan Risk – Changes and Updates Summary 2

Cost to Complete Finance 3

Finance Cost to Complete 4 Construction complete – July 2017 Commissioning complete – Sept 2017 Data taking complete – March 2018 Significant increase in the RF work package – more detail on the next slide Includes 3FTE of ISIS support staff each FY. Ramping down of Technical staff and non staff costs toward the end of FY2017/18 Operational staff will continue to be required to the end of operations Cost estimate for FY18/19 have been included to account for final data analysis, paper writing…. Additional costs for operational staff have been included in the event of further data taking during the early part of the FY.

Finance Cost to Complete 5 Mitigation costs predominantly Additional Helium costs for magnet quenches beyond what can be paid by the common find Additional shielding – Installation issues or equipment susceptibility RF crowbar switch & spares Electrical spares for system failures Staffing element – 10k for band E cost - around 0.1 FTE (~20 days) RF staff costs have been raised – more detail in the next section. Mechanical non-staff costs increased with the more accurate estimate for the LiH Secondary absorber discs.

Final Step UK Cost to completion 6 Allocation and required figures include risk mitigation costs for equipment and staff Allocation approved to FY 15/16, proposal for the final years of the project in the new year. The 2018/19 FY request is for data analysis, paper writing …. And does include a fraction of Technical and Engineering support in the event of further operations and data taking. Required allocation for Phase 3 - £7,778k Total UK spend for MICE £42,527k RLSR 24/11/2014

RF Plan Finance 7

RF Plan 8 Since the last RLSR there has been much discussion and effort put into defining the plan for the UK going forward Following the RF review covering all aspects of the activity, the following effort plan has been defined. The final two years have significant uplift in effort to enable the installation and commissioning work to be completed on the timescale laid out in the schedule for the Cooling Demo. The figures on this page are for the STFC staff only There are University staff working with the STFC staff

Risk 9

Risk 10 Magnet Failure - Focus Coil requiring some recovery from a thermal problem. This has caused some delay and has incurred some additional effort to be put toward the recovery. The Spectrometer solenoid team are looking into recovery plans. Field Effects - This risk still persists but experience from the operation of Step IV with the PRY the risk of electronics or equipment failure is reduced. Resourcing - RF Resource is still a high risk. A great deal of discussion to secure the staff has been carried out with senior management at the Daresbury Laboratory

Risk 11 VAT Risk has hit the project with a £104k bill. STFC are interacting with Customs and Excise to recover the cost. Will remain active until all deliverables are in the country. Purchase of the Lithium Hydride Secondary absorbers will be purchased in the next FY and then the risk will be retired.