GWRS Final Expansion Project and SP-173 Update GWRS Steering Committee Meeting April 11, 2016.

Slides:



Advertisements
Similar presentations
Capital Improvement Program (CIP) Overview Dean Fisher, P.E., PMP, CCM July 25, 2013.
Advertisements

The CSO Abatement Project Presented by: Paul Nordstrom Director of Operations and Engineering.
Treatment of Waste Brine from a Brackish Reverse Osmosis Plant
Presented by: Ronald O. Nichols LADWP General Manager
Wakulla County Sewer Project Eutaw Utilities Presentation April 7, 2011.
Bringing Hyundai to Montgomery MWWSSB’s Role as Part of the Economic Development Team Presented by: Thomas R. “Buddy” Morgan, General Manager Alabama Water.
Regional Partnerships for a Sustainable Water Future Britta Strother Water Resource Specialist July 22, 2010.
Brushy Creek Municipal Utility District Water Facility Project Status Update Presented at April 9, 2009 Board Meeting Joseph Jenkins, P.E., CH2M HILL.
Monterey Peninsula Water Supply Project - Presentation to Monterey Co. Water Resources Agency June 25, 2012.
MSSC 2011 Annual Salinity Summit Charles Ahrens Vice President / Water Resources and Conservation Challenges in Brackish Groundwater Desalination Project.
Jordan Lake Partnership Western Intake Feasibility Study Jordan Lake Partnership Western Intake Feasibility Study 1.
In-conduit Hydropower: Public Sector meets Private Inventions
Delta Conveyance: Update on the Planning Process and Analysis of Water Supply and Costs CCWA Board of Directors February 25, 2010.
Equus Beds ASR Program – Wichita’s Future Water Supply September 6, 2012.
1 Recycled Water Program for the City of Los Angeles.
BAWSCA’s Strategy In 2009, BAWSCA embarked on the Long- Term Reliable Water Supply Strategy to: o Determine the Water Supply Problem When, where, and how.
Emerging Contaminants & the Groundwater Replenishment System Shivaji Deshmukh April 18, 2007.
Monterey Peninsula Water Supply Project April 23, 2012.
Waste Water Facilities Plan Update November 2, 2009 Palmer Engineering Company / Hazen & Sawyer / CDP Public Hearing Presentation.
SAWS' Twin Oaks Aquifer Storage and Recovery Project SAWS' Twin Oaks Aquifer Storage and Recovery Project October Texas Innovative Water 2010 Roberto.
Short and Long Range Water Supply Planning and Aquifer Performance Test (APT)
Technical Workshops on Monterey Peninsula Water Supply Project A July 26 & 27, 2012.
Aerojet Environmental Update Carmichael Town Hall Meeting March 12, 2008 Michael Girard Aerojet Environmental Site Remediation (916)
Facilities Plan Update July 2, 2009 Palmer Engineering Company / Hazen & Sawyer / CDP.
Rich Haller, P.E. Program Manager, Santa Ana Watershed Project Authority (SAWPA) April 2, 2004 Brine Disposal Strategies in Inland Southern California.
April 21, 2015 Presented by: Heidi Springer, P.E. Brian Ginter, P.E.
South Orange Coastal Ocean Desalination (SOCOD) Project Dana Point/Doheny Beach, California November 2010 Status.
Feasibility of Aquifer Recharge Using Reclaimed Water in the Tampa Bay Area March 31, 2009 Phil Waller, P.E.
Wastewater Treatment Plant # 2 Engineering Services Council Workshop July 8, 2014.
Status update presentation #1 for the Cayucos Sustainable Water Project Status update presentation #1 for the Cayucos Sustainable Water Project November.
City of San Diego’s Recycled Water Study Item W15a October 10, 2012 Presentation to the California Coastal Commission.
Chino Basin Watermaster Large-Scale Storage and Recovery Program Master Plan Scope of Work July 23, 2003.
San Gabriel Valley From Stormwater to Supply
Potential Consolidation of WMWD’s Murrieta Division into EMWD April 15, 2015 Paul D. Jones II, P.E. General Manager, Eastern Municipal Water District
December 10, 2009 TOWN OF PALM BEACH WATER COMMITTEE Discussion of Water Plant Options.
1 EASTERN MUNICIPAL WATER DISTRICT Water Supply Strategic Plan Brian Jack Powell, P.E. Director of Planning June 17, 2015.
Silicon Valley Advanced Water Purification Center And Future of Purified Water Use Tour Guides: Miguel Silva Tour Coordinators: Amy Fry, Michelle Pelayo-Osorio.
Water Reclamation Plant Feasibility Study Update July 23, 2014.
Miami-Dade Water & Sewer Department Miami-Dade Water and Sewer Department |  1   Reuse, Every Drop Has Value Seminar FPL JPA.
1 | emwd.org AquaSel Brine Concentration Demonstration Project Khos Ghaderi, P.E. May 18, 2016.
Update on the Richland Creek Reservoir and Water Supply Program Paulding County, Georgia Board of Commissioners Workshop Briefing May 26, 2015.
Strength through History & Innovation City of Beaumont Salt Mitigation Feasibility Study Summary of Findings.
CHANNEL ISLANDS BEACH COMMUNITY SERVICES DISTRICT
AquaSel Brine Concentration Pilot Project Update
Recycled Water Project Basis of Design Report
Waste Discharge Permit: Paradise Irrigation District
PLANNED POTABLE REUSE: URBAN WATER INSTITUTE’S SPRING WATER CONFERENCE
Chromium 6 Regulation Corrective Action Plan October 6, 2015
What’s Next for Potable Reuse in California
OCWD Speakers Bureau 10 min static
Kelley Gage Sr. Director, Water Resources Planning April 7, 2016
Recycled Water Project – Sharon Heights GCC
Water Reclamation Plant Feasibility Study Update May 28, 2014
Santa Ana River Conservation and Conjunctive Use Program: Program Development Phase Costs Brian Powell, P.E. 8/17/2016.
CITY OF MARSHALL CHLORIDE ISSUES September 26, 2017
GWRS Operations Update and Budget Review
“Is the Bay Area Ready for Potable Reuse?1”
Water Reclamation Plant Feasibility Study Update
CITY OF MARSHALL CHLORIDE ISSUES NOVEMBER 22, 2016
OCWD Speakers Bureau 10 min static
Facilities Plan Update
Brackish Water Desalination Project
Background Broward County currently operates a 10 MGD reuse facility located at the North Regional Wastewater Treatment Plant. Customers include commercial,
Delta Water Supply Project
Big Sky Wastewater Facility Plan Update
Status after Second Year of Work Implementing the Recommendations of the Santa Cruz Water Supply Advisory Committee Joint Meeting Santa Cruz City Council.
Is the Bay Area Ready for Potable Reuse?
TAPPING THE WORLD OF POSSIBILITIES
Chino Basin Watermaster
How the GWRS Overcame the “Yuck” Factor
Presentation transcript:

GWRS Final Expansion Project and SP-173 Update GWRS Steering Committee Meeting April 11, 2016

Groundwater Replenishment System (GWRS) Projects GWRS Project (Completed 2008) –Construction of 70 MGD Treatment Facility with future expansion capacities, Injection Wells, and Pipeline GWRS Initial Expansion (Completed 2015) –Expansion of 70 MGD Treatment Facility to 100 MGD including SEFE pump station & storage tanks GWRS Final Expansion (Completion TBD) –Expansion of 100 MGD Treatment Facility to 130 MGD including water supply pipeline, EQ tanks, pump station & treatment process reconfigurations at OCSD

GWRS – Advanced Water Treatment Facility (AWTF) Improvements N Microfiltration West Bldg Expansion (1.5 new trains) Six New RO Units Three New UV Trains New Product Water and BW Supply Pumps New Decarbonator and Cartridge Filter

GWRS Source Water To produce 130 MGD of GWRS water – approximately 174 MGD of Secondary Effluent is required from OCSD (including 4 MGD of GAP source water) OCSD combined Plant No. 1 & Plant No. 2 total influent flows are currently 182 MGD Santa Ana Regional Interceptor (SARI) discharges to OCSD Plant No. 2 are currently ~30 MGD OCWD is currently not permitted to use SARI source water for GWRS by the Division of Drinking Water (DDW) GWRS Expert Panel initial evaluation of recycling SARI water through GWRS deemed feasible with recommendations. DDW will have to provide approval and conditions for SARI to be recycled.

ItemFlow Ave. GWRS FE Produced 1 Current Plant No. 1 & 2 Influent182 MGD Segregated SARI Influent to Plant No MGD OCSD Plant Water Usage-2 MGD Total Flows Available for GWRS FE149 MGD111 MGD Segregated OCSD Sidestream Wasteflows (NDMA) -6 MGD MF Backwash Waste Flows16 MGD OCSD 2-72 SARI WW Diversion Projects MGD Total Flows Available for GWRS FE MGD MGD Preferred Influent for GWRS FE174 MGD130 MGD OCSD/GWRS Final Expansion Flows 1)Assumes 4 MGD Secondary Effluent for GAP and 85% RO Recovery; 2)Exact diversion flows are currently being evaluated by OCSD; 3)Potential additional source flows include Extraction Well Discharges, MF Cleaning Wastes, Additional SARI WW Diversions

GWRS Flows & Production Project GWRS Max Daily Production (MGD) GWRS Yearly Production Goal (AFY) Average Daily Production Goal (MGD) GWRS 7070, GWRS Initial Expansion ,00092 GWRS Final Expansion ,000120

OCSD Plant No. 2 OCSD Plant No. 1 OCWD GWRS Facility Santa Ana River 405 Freeway New Pump Station Exist 66-inch Pipeline to be Rehabilitated New EQ Tank

GWRS Final Expansion Implementation Plan Plant No. 1Plant No. 2

GWRS Final Expansion Preliminary Cost Estimate Project DescriptionCost (Millions) OCWD AWTF Expansion to 130 mgd$130 OCSD Plant No. 2 Pump Station$18 OCSD Plant No. 2 Six MG Flow EQ Tank$23 OCSD Slip Line existing OCSD pipeline w/ 58” HDPE$37 OCSD Plant No. 2 Headworks SARI Segregation$45 Total*$253 9 *Represents total costs for OCWD. Planned OCSD & OCWD CIP Projects not included

Initial Draft GWRS FE Project Unit Cost Estimate Financing AssumptionsUnit Cost ($/af) 1 Melded Unit Cost ($/af) 2 5% financing over 30 years – no grants obtained $980/af$567/af 1% financing over 30 years - $30 million of grants $733/af$509/af 10 1) Unit cost based on increased production of 31,000 af/year; 2) Melded unit cost combines current operating unit costs with GWRS FE unit costs for total production of 134,000 af/year

Staff to review Draft SP-173 Implementation Report in May 2016 Final SP-173 Implementation Plan complete in July 2016 OCWD Complete CEQA & Engineer’s Report to establish project in August 2016 and pursue grant funding opportunities OCSD present SP-173 findings to July Operations Committee Meeting OCSD & OCWD to prepare amendment to joint agreement –Implementation plan & each agencies responsibilities to be included Initiate MF Pilot Studies at OCSD Plant No. 2 to evaluate water quality impacts OCWD staff and GWRS Expert Panel will continue refining recommendations for recycling SARI Next Steps

End of Presentation