EN-CV Progress EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2016/02/04.

Slides:



Advertisements
Similar presentations
Engineering Department EN Cooling and Ventilation issues 1 FUTURE EXPLOITATION OF THE EAST AREA EN-CV Michel OBRECHT.
Advertisements

The students: Mohammad Shabaro ( ) Mahmoud Mousa ( ) Yosri Asfour ( ) Supervisor: Dr. Iyad Assaf 1.
CURRENT STATUS OF CV INSTALLATIONS, WORKS DURING LS1 AND PROBLEMS ENCOUNTERED DURING START-UP NORTH AREA Bill Bannister / Jani Lehtinen EATM – 7 th October.
SM18 Vertical/Horizontal Test Setup LHC Crab Cavity Engineering Meeting Session: Cavity Cryostat Testing & Integration in SM18Cavity Cryostat Testing &
SR1 ongoing workH.Pernegger21/2/02 Ongoing work in SR1 and preparations for detector macro assembly Heinz Pernegger.
Paolo Guglielmini TS / CV / DC08th April 2005 BIDDERS’ CONFERENCE Invitation to Tender 3307 Supply and Installation of water cooling equipment for the.
Water piping design.
CV activities on LHC complex during the long shutdown Serge Deleval Thanks to M. Nonis, Y. Body, G. Peon, S. Moccia, M. Obrecht Chamonix 2011.
Vacuum - CONTROL SYSTEM 29 June Agenda MSRC design, first ideas and plans – Antonio quiet cooling fans test – Irene some scada SW review - Martin.
IT-4103/EN Bidder’s conference Technical Specification for the Design, Supply, Installation and Commissioning of an HVAC system, a Smoke Extraction system.
IMPACTS OF INSTALLING THE REFERENCE MAGNET PLACEMENT IN B december 2014 Fulvio Boattini & Natacha Lopez Hernandez.
EN-CV status EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2015/08/06.
ISOLDE: Status report building th ISCC meeting CERN, 31 March 2014 Erwin Siesling, Magda Kowalska.
Bulding 245 schedule update LIU Booster Meeting Fulvio Boattini & Michel Obrecht TE-EPC / EN-CV TEEPC.
VENTILATION PRINCIPLE FOR THE DRIVE BEAM TUNNEL M Nonis – EN/CV – 28/7/2009 Already presented by C. Martel/ J Inigo Golfin on15 th October 2008 CLIC WORKSHOP.
N-TOF review HVAC and cooling systems YB-JIG 15/06/07.
D. Gasser ST/CV 1 Fluid distribution from UW85 Fully available now.
Budget specification EHN1 Extension: Infrastructure (WG2) Mats Wilhelmsson 17 September 2015.
SM18 INFRASTRUCTURE Crab Cavity CryoModule – Conceptual Design Meeting
EHN1 North Wall Dismantling Schedule Bastien Rae.
Injectors & LHC report K. Foraz on behalf of OSS members 14/06/2013LSC - K. Foraz1.
Paolo Guglielmini - TS / CV LHCb Install Meeting - 20/04/2005 LHCb Install Meeting 20/04/05 TS / CV / Detector Cooling Installations.
Paolo Guglielmini - TS / CV LHCb Install Meeting - 12/10/2005 LHCb - Install Meeting 12/10/05 TS/CV/DC Installations STATUS Ongoing works 1.chilled / mixed.
COOLING & VENTILATION FOR THE DRIVE BEAM TUNNEL M Nonis – EN/CV – 16/9/2009 CLIC TWO BEAM MODULES REVIEW
Computing Facilities CERN IT Department CH-1211 Geneva 23 Switzerland t CF CERN Computer Centre Consolidation Project Vincent Doré IT Technical.
The Building 180 Cryogenic infrastructure water cooling system Stefano Moccia, EN-CV Coordination meeting 26/09/14.
Consolidation activities for GS-SE Luigi Scibile GS-SE Accelerator Consolidation Workshop, EDMS:
Functional/Budget specification EHN1 Extension: Infrastructure (WG2) Mats Wilhelmsson EN/MEF 4 November 2015.
Plan for test station Marta Bajko For the Technical Review of FReSCa2 June 2015 Saclay Paris.
Building 180 NORMATEF TEST FACILITY Demineralized cooling water station upgrade R. Bozzi / EN-CV.
Engineering Department EN Cooling and Ventilation issues 1 FUTURE EXPLOITATION OF THE EAST AREA EN-CV Michel OBRECHT.
IT-4014/EN/NA62 Technical Specification Dismantling, Design, Supply and Installation of a Ventilation and Air Conditioning System for ECN3, TCC8 and GHN300.
EN-CV Progress EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2016/01/21.
SM18 Vertical & Horizontal Test 110/12/2013Mathieu Therasse CERN BE/RF A. Benoit, O. Brunner, E. Jensen, A. Macpherson, P. Maesen, K. Schirm, W. Venturini.
COOLING & VENTILATION PLANTS M. Nonis – CERN EN Department / CV Group Annual Meeting of the FCC study – Rome 14 th April 2016.
Technical Review EHN1 Extension Cooling Systems and Pipework Jérôme Rodary / EN-CV.
CV Activities for PSB-LIU POPS-B (new MPS for the PSB-LIU) B 245 PSB Demi water cooling plant Stefano Moccia, EN-CV Meeting 07/03/16.
R2E Report – P5 Safe-Room Update 20 th LSC Meeting, September 13 th 2013 CERN Radiation 2 Electronics (R2E) Project 20 th LSC Meeting September 13 th 2013.
EN-CV Progress EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2016/01/14.
S A Griffiths CM42 June 2015 Electrical & Control.
Update on the PSB Cooling and Ventilation Systems
Neutrino Platform Proximity Cryogenics 68th EHN1 Cryogenics Integration TE-CRG
EN-CV activities for LHC during LS2
Teleconference ACS – FREIA 31th May 2017
SR1 extension follow up 27-Mar-17 Marco Ciapetti.
EHN1 Cryogenics Integration
Neutrino Platform Proximity Cryogenics 62th EHN1 Cryogenics Integration Redouan Abdennour, Johan Bremer, Michel Chalifour, Joaquim Creus, Aurelien Diaz,
Design of the thermosiphon Test Facilities 2nd Thermosiphon Workshop
ARAC/H/F Air-cooled water chillers, free-cooling chillers and heat pumps Range: kW.
CBETA Technical Review
IT-4189 Supply and installation of a cryogenic distribution system
1.3-GHz Cavity Vacuum Furnace at IB4
EHN1 Extension North Side wall (Removal of Existing services & platforms) Michael Jeckel & Bastien Rae.
Dana M. Arenius Jefferson Laboratory Cryogenics Dept Head
Budget specification EHN1 Extension: Infrastructure (WG2)
SPS cryogenic proximity equipment and SM18 validation
BINP, Sergey Pivovarov, Panda magnet meeting at GSl, June 07, 2016
EN-CV Progress EHN1 Extension Project
David Montanari / Johan Bremer Jun 11, 2015 Rev. 1
Teleconference ACS – FREIA 17th October 2017
FCC Tunnel and Shaft Cross Sections
HVAC Basics Arkan Arzesh HVAC – Heating, Ventilation, Air-conditioning.
PSB/PS/TT2/Linac2-3 YETS 2017–2018 & LS2 preparation meeting
SPS EN-CV Planning LS (initial draft)
Teleconference ACS – FREIA 31st October 2017
Cooling systems for HL-LHC (WP17.3)
COOLING & VENTILATION INFRASTRUCTURE
EN-CV: P8 systems and Detector Cooling
TEST PLANS for HL LHC IT STRING
Aziz AMAMOU EACM – 21th May 2019
Presentation transcript:

EN-CV Progress EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2016/02/04

Contents 1. North wall dismantling 2. Integration status 3. Future design activities

1. North wall dismantling Works completed : (already discussed) firefighting network interception chilled water disconnected barrack HNA 910 mixed water station removed (north wall) old fan coil removed from barrack HNA 494 raw water network interception (several places) Dismantling status updated (04 February 2016) : Completed Discussed with M. Jeckel Completed Piping & valves are available – Works have started during this week! Completed Discussed with M. Jeckel New CW piping will be installed during the YETS (CONSOLIDATION)

2. Integration status GAr extraction system & hall ventilation : ~ 95 % Piping networks & cooling systems : ~ 85 % Integration progress for piping networks : See slides in appendix

3. Future design activities Electrical design data for EN-EL ( given by EN-CV the 19 October 2015 ) Electrical power balance tables

3. Future design activities Chilled Water (CW): Extension of the network in the future galleries Hypothesis for the design - confirmed by EN-MEF on 05 November 2015 : Additional flowrate: ~ 9 m3/h (for n.8 barracks fan coils) Additional cooling power (for n.8 barracks 6.3 kW fan coils): ~ 50 kW Other : NO CW network extension proposal inside EHN1 extension area

3. Future design activities Raw Water (RW): Extension of the network in the future galleries – OK : confirmed on 17 December 2015 Hypothesis for the design – not confirmed (very urgent !) : Additional flowrate (for n. ? racks) : ? m3/h (to be confirmed) Additional cooling power (for racks) : ? kW (to be confirmed) Additional cooling power for (n. 3 ?) cold boxes : NO (confirmed by Johan Bremer on 03 November 2015) Water cooling requirements for racks to be given: Racks locations (inside barrack ?) Thermal spread (∆T) Inlet temperature Max allowable pressure ∆P Nominal diameters of connection Any relevant information,… Note: Raw water temperature is about 20 °C (≠ Mixed water) : Racks characteristics shall comply with this inlet temperature !

3. Future design activities Compressed Air (CA): Extension of the network in the future technical gallerie and around the building Hypothesis for the design – given by Johan Bremer on 03 November 2015 : ‘Cryo’ users (for cryostats valves & instrumentation) : 10 8 bar Additional users (for tools,…) : YES (branches location to be given) ! Note: In order to close CA network integration, EN-CV need cryogenics valves location !

3. Future design activities Demineralized Water (DW): Extension of the network in the future technical gallerie Hypothesis for the design – recently updated : Additional flowrate (for new magnets) : 59 m3/h - updated by Philip on 25 January 2016 Additional cooling power (for new magnets) : kW – updated by Philip on 25 January 2016 Additional cooling power (for power converters) : 0 kW Other : NO Currently : DW network pumping capacity is not sufficient to ensure these requirements ! IMPACTS: 2 centrifugal pumps to be installed at BA81 Station Overcost, delay,… Flowrate recovery is estimated at : ~ 48 m3/h +/- 10 m3/h (value given on 29 January 2016)

3. Future design activities Fire Fighting (FF): Extension of the network in the future area Hypothesis for the design : According the ‘EHN1 extension safety meeting’ held on 09 October 2015 (see MoM) Number of RIAs to be installed: n.6 EN-CV is preparing a technical dossier for HSE review (drawings, design justification,…)

3. Future design activities Heated water for 2 new AHUs: Hypothesis for the design : Existing hot water substation will be re-used and slightly refurbished Hot water piping network will be extended, as shown below

3. Future design activities User Requirements missing  some data have been collected but not all ! EN-CV needs technical data & requirements for designing the future extended networks as listed below  UR shall be confirmed as soon as possible for pre sizing all fluid networks and checking pumping capacities ! chilled water (for HVAC purposes) chilled water (for cooling down other some equipments) compressed air raw water ! demineralized water ! fire fighting system gas extraction (other gases except GAr ?) REMINDER: Deadline to collect all the User Requirements was : 12 November 2015 in order to comply with project schedule !

Thank you for your attention