Found at: (Password required)http://www.ratewave.com/DHL/dhlIndia.html Guide to Completing RateWave Rate Filing.

Slides:



Advertisements
Similar presentations
Processing Your Loyalty Order Online. Table of Contents Click for direct link to your preferred topic: Process your Loyalty Rewards Order TODAY Edit your.
Advertisements

Welcome to the Manage Orders lesson for the North Carolina Immunization Branch. Contents: Placing a State Supplied Order Accepting a State Supplied Order.
Tilde Publishing and Distribution ISBN: Import/Export Mapping International Trade for Australian Business Sea Freight.
10+2 Importer Security Filing Brought To the Importer By.
FMC Regulations and NRA’s ver
CHAPTER 7 Transportation Management. © 2008 Prentice Hall 7-2 Learning Objectives F To examine the background of the transportation management function.
CMA CGM, a Leader in Container Shipping Led by its founder, Mr Jacques R. Saadé, CMA CGM is the world’s third largest container shipping company. CMA CGM.
Making the Decision on Transportation - a Checklist.
CE 515 Railroad Engineering Armstrong Chapter 8: Railroad Operation – Moving From Here to There “Transportation exists to conquer space and time -”
EProcurement Job Aid Requisitions & Receipts. Table of Contents Creating a Requisition Define Requisition Vendor.
Copyright CovalentWorks Training Guide for Invoices MYB2B Powered by CovalentWorks.
Public Education Partnership Seminar September 1, 2015
Order Based Services Changes effective February 21, 2008 Dispatch Release Notes Order Based Services.
1. To start the process, Warehouse Stationery (WSL) will invite you to use The Warehouse Group Supplier Electronic Portal and will send you the link to.
Examining data using Microsoft Access Queries Using Criteria and Calculations SESSION 3.2 This section covers specifying an exact match condition in a.
Found at: Guide to Completing RateWave Rate Filing Advice Form.
Index WFO Home 2.0 Chat Wall Multiusers Handbook Bill of landing.
REPLYING TO UCAS Acknowledgement Reply - UCAS  Electronic receipt sent to school  Welcome letter sent to student from UCAS – This contains:- Applicant.
NYS Division of Homeland Security And Emergency Services (DHSES) E-Grants Tutorial Creating an Application for the EOC RFP To access DHSES E-Grants you.
Produced by UTi America’s Training & Support Dept. This tutorial is designed to help guide the operator through mandatory fields of the system. Generally,
Walk Through of VEEP Online System Updated May 2011.
. The answer to all your Tariff Filing USA NVOCC.
3M Partners and Suppliers Click to edit Master title style USER GUIDE Supplier eInvoicing USER GUIDE The 3M beX environment: Day-to-day use.
 Many rates that you file may already exist in RateWave’s FMC compliant Tariff database.  To limit multiple.
Orders – Create Responses Boeing Supply Chain Platform (BSCP) Detailed Training July 2016.
Emdeon Office Batch Management Services This document provides detailed information on Batch Import Services and other Batch features.
Overview Rental Quote Overview
Compatible with the latest browsers; Chrome, Safari, Firefox, Opera and Internet Explorer 9 and above.
I-9 Instructions and FAQs
Customer Invoicing in KFS
Final Report.
CHAPTER XII SHIPPING DOCUMENTS
Booking Shipments Online
Back to Web Dispatch Menu
Hiring Manager onboarding
Student SOLE Page – Living Page
TuNGSTEN E-INVOICE SUBMISSION GUIDE.
A Step by Step Tutorial This PowerPoint presentation is intended to show eDMR users how to login and use the eDMR system.
Pricing & Rating Module
The Federal Maritime Commission
2012 Business Guidelines for Association Membership
Hospital Training Overview
DrayWatch Training November 2009.
FedEx Billing Online (FBO) Non-Revenue Quick Guide
Shipping and Freight - A to Z
Class of 2019 Naviance Student: Senior year
I-Supplier Training Guide
Facilities Maintenance Extension
Found at: Guide to Completing RateWave Rate Filing Advice Form Found at:
Guide to Completing RateWave Rate Filing Advice Form
OPTIONAL PRACTICAL TRAINING
OPTIONAL PRACTICAL TRAINING
Found at: (Password required)
OPTIONAL PRACTICAL TRAINING
Introduction to Invoicing
Inside a PMI Online Course
Rate Calculator The Rate Calculator is one of the online tools that allow customers to calculate the Tariff Rate online.  Three ways to access the Tariff.
Utility Billing Balancing the Accounts Receivable
Maryland Online IEP System Instructional Series - PD Activity #5
ONLINE FILING Updates and Review
Standard Operating Procedure
Reporting 101 Keenan & Mona.
NGES Supplier Instructions for the Electronic Request for Quotation (eRFQ) **New Special Charge Capability Added to Adobe Form- Effective 10/10/16** Revision.
GSA eBuy Seller’s Tutorial
Hire Xpress User’s Training A Human Resources guide to Hire Xpress
Towson University Store
Fall 2198 SmarterProctoring in Canvas Tutorial
Presentation transcript:

Found at: (Password required) Guide to Completing RateWave Rate Filing Advice Form when requesting publication of India to USA & Puerto Rico Rates ONLY

Part 1: General Filing Information Danzas 3-letter unique office code Name of agent So RateWave can contact you with any questions.

Part 1 (Cont’d): General Filing Information Use Amendment only if changing an already existing rate. If you select New, RateWave will always check to make certain rate is really new. If rate already exists, there is no charge for sending duplicate filing instructions. Using an expiration date is highly recommended days is recommended for All- Inclusive Rates, so that if the underlying Steamship Line’s additional charges are increased, you may not have to wait a full 30 days to make your rate increase effective. At the very least, if a rate is based on a Buy Rate in a Service Contract, make your Expiration Date match the Expiration Date of the Service Contract. Always remember that a newly established rate or rate reduction must remain in effect for at least 30 days. If you made a filing and then realize on the same day that you made a mistake or omitted information, please select this box to let RateWave know so that we will not file incorrect information.

Part 2: Commodity Information Tariff Commodity Item No: You may use this box to identify an existing rate item already filed in the Tariff (please see the “Rate Look Up” PowerPoint). Harmonized Code Number: If you wish, you can use this box to provide RateWave with the Harmonized Code Number. However, if you use a Harmonized Code number please also provide a brief description in the section below. The Harmonized Code number will be used as a reference point for RateWave. Please make the commodity description as plain, complete and specific as possible. Trade, Shipper or Company Names CANNOT be used in commodity descriptions by law (for instance, we cannot publish “IBM Computers” – we can simply list “Computers” ). Please double-check the hazardous status of each item. i.e., “Perfumes” can be both Hazardous and Non-Hazardous, so please specify which status is applicable when filing commodities that can fall into both categories. In such cases if you fail to specify the Hazardous status the rate will be published so as to apply on both Non-Hazardous AND Hazardous cargo. *******************************************************************************************************************

Part 2 (Cont’d): Commodity Information (Hints for Wording Commodity Descriptions) Please be aware when providing a specific commodity description, your new rate filing request will be compared against any more generic item in the Tariff. i.e. “Drilling Machinery” may be a New Item, but there may already be a rate under “MACHINERY, N.O.S.” that will conflict (since the rate applies from or to the same origin/destination/vias) with your more specific commodity. If your new filing request is an increase from the more generic rate already in effect, your new rate cannot be effective for 30 days after your filing date. In the past the FMC has refused to allow the use of commodity descriptions that they feel are too vague or too generic to be “meaningful”. The Terms frequently included in commodity descriptions that are NOT acceptable to the FMC and which require further clarification are: -Products-Goods-Notions-Supplies-Merchandise-Accessories -Items-Equipment*-Materials (incl. ‘Raw Materials used in’) *Only when used in the broadest sense; i.e. KITCHEN EQUIPMENT is NOT acceptable; EARTH MOVING EQUIPMENT is acceptable. NOTE: If you must use the above terms, please provide a list of such Items (a VIZ list). You can be assured that if we see a commodity description that may be a problem, RateWave will contact the filer directly and ask for clarification. If you are in doubt, please feel free to contact RateWave directly. There are exceptions to every rule and space does not allow for a comprehensive listing.

Part 3: Route Information NOTE: Please make sure that you include the CITY and STATE when listing U.S. ports or points There are multiple states with the same city name in the United States; for example, there are 14 “Springfield”s in the United States, and there are 2 “Wilmington”s both of which are ocean ports, so please be specific. Use the “POINT” box ONLY if the origin or destination in the Danmar House B/L is an inland point. Please remember that due to a recent FMC decision we must list a POL or POD for all inland point rates.

Part 4: Rate Information TLI Number: Complete this ONLY if you are amending an existing rate AND only after you have already checked the electronic Tariff section to identify exactly which rate you wish to amend. Please see “Rate Look Up” PowerPoint for further instructions on how to do this. CURRENCY: This box identifies the currency in which the rate is stated. The default currency is “USD”. However, you may publish rates in any legal, freely convertible currency; you simply need to change the code.

Part 4 (Cont’d): Rate Information (1)RATE: If using U.S. currency please use dollars and cents, so that we can be certain of the exact rate to be filed. (2)RATE BASIS: The drop down menu lists the common Rate Basis options: -per Ctr used for rates based on a single container (you will be able to specify container type and size in boxes to the right) -M: used for rates based only on cubic volume (cbm) -W: used for rates based only on weight (kg, lbs) -W/M: used for rates based on either weight or volume, whichever produces the greater revenue -Each: used for big items, such as Trucks, Cars, Boats, etc. -Lumpsum: used for rates based on a total amount for an entire shipment. When using “Lumpsum” RateWave MUST have a max volume and/or weight or other size limitation in order to file a legal rate. (If no maximum is included, the rate will apply to any size shipment). (3) ORIGIN & DESTINATION SERVICE: Please provide a service code for BOTH the origin and destination; this information must match the origin and destination service specified in the Danmar House Bill of Lading, options include: -Breakbulk (K) -Carrier loads container (CFS) -Shipper loads container (CY) -Danmar B/L applies from Shipper’s DOOR (D) -Roll-on at Pier (Q) -Rail Yard (R) AGAIN, YOU WILL NEED TO PROVIDE A SERVICE FOR BOTH THE ORIGIN AND DESTINATION; THE SYSTEM WILL NOT SEND A FILING TO RATEWAVE UNTIL THESE ARE INCLUDED. (1)(2)(3)

Part 4 (Cont’d): Rate Information (4)(5) (6) (7) When filing a "per container" rate, you may specify the Type and Size of container applicable to the rate listed from the available codes in the drop down menus under each column. If you do not see the container type or size you need listed please add additional explanations in the miscellaneous notes section. (4) CONTAINER TYPE: Container Types include dry, flat racks, high cube, open tops, etc. (5) CONTAINER SIZE: Use to qualify different rates for different container sizes. You can file more than one container rate at a time, (i.e. PC20, PC40, PC40B, etc.) by simply using additional lines (6) VIA CARRIER: This column can be used to identify the steamship line service to which the rate applies. This can be extremely useful since NVOCCs are permitted to file different rate levels for movements via different steamship lines. The same is true when co-loading with different NVOCCs. Please note that RateWave always checks to make sure the Carrier listed is a legally established VOCC or NVOCC with the FMC. If not, we will return the filing to you for clarification. (7) CONTROL NO.: You can use this field to specify a control number that will allow you to track your filings. Control numbers will be placed in the filed tariff so you will be able to search for your control number once it has been posted in the tariff. At the present time the control number must be limited to no more than 5 numeric values.

Part 5: Inland Charges – Origin Use this Section to specify inland charges for inland transportation service INCLUDED in the Danmar House B/L, but which are NOT included in the rate stated in the Rate Information Section above. (1) (2) (3) (1)ORIGIN POINT: The inland Point at which Danmar takes possession of the cargo as specified in the Danmar House B/L – NOT the original origin point of the shipment prior to Danmar taking possession of the cargo at the Danmar House B/L. (2) POL: “Port of Loading”. Under a recent Federal Maritime Commission ruling, all rates applying from an interior point (or from a Shipper’s Premises/Door) MUST specify the actual ocean Port of Loading. (3) MODE: In this field please specify the actual mode that will be utilized to move the cargo from the origin point to the POL. We have tried to cover all possible inland options in the drop down menu, so if you need to specify a different mode type you can list another inland mode option in the “Miscellaneous Notes and Conditions” box (see Part 7). (4) INLAND CHARGE (INCLUDE CURRENCY): Here please list both the amount of the inland charge and currency that charge is quoted in. Please use the standard 3 letter currency code followed by the amount when listing the inland charge. (5) CHARGE BASIS: Please specify the basis on which the inland charge is quoted. If you utilize the “other” selection, you MUST tell RateWave what the basis is in the “Miscellaneous Notes and Conditions” box. Failure to do so will mean we must go back to the filer and request clarification which will delay the filing. (4) (5)

Part 5 (Cont’d): Inland Charges – Origin (7) (6) (6) INLAND FUEL SURCHARGE: If the inland charge you have quoted is subject to an Inland Fuel Surcharge please specify that separately in this box. Please remember to tell RateWave how the Inland Fuel Surcharge is calculated (i.e. per container, % of inland, per 100 pounds, etc.). (7) FREE TIME & DETENTION/DEMURRAGE: If there is to be any Carrier Detention or Demurrage Charge at the Shipper’s Premises/Door please specify the amount of Free Time the Shipper has to load the container and then list the charge to apply after the end of Free Time (per hour, per day, etc.). DO NOT use this field to list any steamship line Demurrage Charges at the POL – such charges do NOT have to be filed in the Tariff.

Part 5 (Cont’d): Inland Charges - Destination (1)DESTINATION POINT: The inland point at which Danmar delivers the cargo to Consignee as specified in the Danmar House B/L – NOT the final point of destination of the shipment beyond the Danmar B/L Destination. (2) POD: “Port of Discharge” – Under a recent Federal Maritime Commission ruling, all rates applying to an interior point (or to a Consignee’s Premises/Door) MUST specify the actual ocean Port of Discharge. (3) MODE: In this field please specify the actual mode that will be utilized to move the cargo to the destination point from the POD. We have tried to cover all possible inland options in the drop down menu, so if you need to specify a different mode type you can list another inland mode option in the “Miscellaneous Notes and Conditions” box. (4) INLAND CHARGE (INCLUDE CURRENCY): Here please list both the amount of the inland charge and currency that charge is quoted in. Please use the standard 3 letter currency code followed by the amount when listing the inland charge. (5) CHARGE BASIS: Please specify the basis on which the inland charge is quoted. If you utilize the “other” selection, you MUST tell RateWave what the basis is in the “Miscellaneous Notes and Conditions” box. Failure to do so will mean we must go back to the filer and request clarification which will delay the filing. (1) (2)(3) (4) (5)

Part 5 (Cont’d): Inland Charges – Destination (7) (6) (6) INLAND FUEL SURCHARGE: If the inland charge you have quoted is subject to an Inland Fuel Surcharge please specify that separately in this box. Please remember to tell RateWave how the Inland Fuel Surcharge is calculated (i.e. per container, % of inland, per 100 pounds, etc.). (7) FREE TIME & DETENTION/DEMURRAGE: If there is to be any Carrier Detention or Demurrage Charge at the Consignee’s Premises/Door please specify the amount of Free Time the Consignee has to unload the container and then list the charge to apply after the end of Free Time (per hour, per day, etc.). DO NOT use this field to list any steamship line Demurrage Charges at the POD – such charges do NOT have to be filed in the Tariff.

Part 6: Charge Applications -This may be the most difficult area of the filing form to complete. -The first option is to select whether or not the rate is All-Inclusive; check “Yes” or “No”. Please note default on rate form is “No” -If you select All-Inclusive – YES: RateWave assumes that all the rates on the filing form are NOT Subject to and INCLUDE all additional charges listed on the form following “All Inclusive?”) -If you select All-Inclusive – NO: RateWave assumes that all the rates on the submitted rate filing form ARE Subject to and do NOT include all the additional charges listed in the Tariff, which have been listed below on the form. OR You can use the list below the All-Inclusive selection (as shown on the next screen) to indicate which charges are, or are not, included in the rate, or you will be able to indicate an exception charge amount.

Part 6 (Cont’d): Charge Applications (1) (2)(3) (1) By using a check mark (√) in this column you indicate the rate is SBJ to the current (and future) surcharge amount. (2) By using a check mark (√) in this column you indicate the rate is inclusive of or NOT SBJ to the current and future surcharge amount. (3) By using a check mark (√) in this column you will be able to indicate the rate is SBJ to the surcharge, but at a different level than the one in the tariff. You can check on “View Current” to see the current surcharge amount in the Tariff. Please remember that if you specify a specific amount the rate will be SBJ to that amount until changed. This means that if you indicate a BAF of $ Danmar cannot charge a higher BAF (even if the underlying VOCC increases their BAF amount) until and unless you change the specific exception amount in the Tariff. Also when specifying exception surcharge amounts for multiple containers list them in order from smallest to highest equipment size separated by a “/” slash. (i.e. 100/200/300 would mean $100 PC20, $200 PC40, $300 PC40B (hi- cube)). Etc.

Part 6 (Cont’d): Charge Applications (1) The rate is either SUBJECT or NOT SUBJECT to the currently effective GRI, please choose one or the other. (2) If you do not specify that a rate is NOT SUBJECT to a pending GRI in your tariff (i.e. filed but not yet effective), RateWave will publish the rate as SUBJECT to that GRI. (1) (2)

Part 7: Misc. Finally, in the “Miscellaneous Notes and Conditions that Apply” box please add any special instructions (“to be filed immediately” for instance), other surcharges not listed above, or explanations that help clarify the rate, origin, destination, commodity description, etc. RateWave would prefer you provide us with too much information, rather than having to send the request back for clarification.