NHS PAM Electrical Systems 2 nd June 2016. 1) Policy & Procedures Does the Organisation have a current, approved Policy and an underpinning set of procedures.

Slides:



Advertisements
Similar presentations
The Risk Management Process (AS/NZS 4360, Chapter 3)
Advertisements

Engineering in business and the environment Lesson 6: Health and safety legislation.
Copywrite SESC January 2009 Unit 26, Dinnington Business Centre Outgang Lane, Dinnington South Yorkshire S25 3QX Tel.: +44(0) Fax +44(0)1909.
2 3 There are two basic areas where there is a need to have resources available. Internal:  Financial  Personnel  Assets  Time External  Consultants.
Health and Safety - an update Ian Gillett Safety Director.
SIEP HSE Management System
IAEA International Atomic Energy Agency Responsibility for Radiation Safety Day 8 – Lecture 4.
Contractor Safety Management
Lecture 8. Quality Assurance/Quality Control The Islamic University of Gaza- Environmental Engineering Department Environmental Measurements (EENV 4244)
ISO General Awareness Training
Quality Assurance/Quality Control Policy
How to create... A Fire Evacuation Plan.
A Guide to Fire Alarm Service and Maintenance Requirements.
Session 3 – Information Security Policies
WHS Management Plans.
1 CS38010 Professional Issues Health and Safety at Work.
W504 - Management of asbestos containing materials.
Ship Recycling Facility Management System IMO Guideline A.962
Occupational Health and Safety
Basics of OHSAS Occupational Health & Safety Management System
The Policy Company Limited © Control of Infection.
Work Health and Safety (National Uniform Legislation) Act and Regulations NT WorkSafe Anna McGill.
Presented by: Meg Boyd The Blue Mountains Drinking Water System: DWQMS Overview.
Health and Safety Policy
11 PAM system 11/02/ At a high level the NHS PAM is based on two types of analysis. 1.Qualitative, self-assessment of effectiveness, safety and.
Unit 201: Health and safety in building services engineering
Prime Responsibility for Radiation Safety
ELECTRICITY AT WORK REGULATIONS THE REGULATIONS DICTATE THAT ALL PORTABLE EQUIPMENT MUST BE INSPECTED REGULARLY AND TESTED TO ENSURE THAT IT IS.
Two of the most important pieces of the health and safety legislation affecting educational establishments across the UK are the Health and Safety at.
Program Implementation MM.DD.YY. To comply with the OHSA and regulations To demonstrate management's commitment to health and safety To show employees.
Safety Management Standards. Introduction Health and Safety Procedures (which identify the risks, hazards and ways of mitigating these) are weak in that.
The Repairing Standard ELECTRICAL INSTALLATIONS AND APPLIANCES.
11 Premises Assurance Model 2014 version SAQ 25 - Safe and compliant with well-managed systems in relation to: contractor management 2016 version SAQ SH18.
SH4: With regard to Health & Safety at Work can the organisation evidence the following?
NHS Information Governance Risk Management. Introduction Information risk to be managed in a robust manner Assurance to be provided in a consistent manner.
A LOOK AT AMENDMENTS TO ISO/IEC (1999) Presented at NCSLI Conference Washington DC August 11, 2005 by Roxanne Robinson.
Dinnington Business Centre Outgang Lane, Dinnington

Pipeline Safety Management Systems
Premises Assurance Model
Fire Risk Assessment Judith Evans BEng(HONS) CMIOSH
Chapter 8. Electrical Systems
National Food Control Systems
Health and Safety Self Assurance Toolkit 2017
Premises Assurance Model
In Too Deep A CDM Perspective – Acting BEFORE Construction Begins.
Jason Bolton Compliance Officer
ISO/IEC
Health and Safety Policy
Occupational Radiation Protection during High Exposure Operations
Temporary Works Co-ordination
Hazardous Areas & Hazards of Electricity
OHS Staff Introduction Training
The session will commence at Please mute your microphone
Across the entire value chain
Premises Assurance Model
Fire Safety In Healthcare 23rd September 2015
Premises Assurance Model
OHS–Occupational Health & Safety
County HIPAA Review All Rights Reserved 2002.
Operationalizing Export Certification and Regionalization Programmes
Developing and testing the Plan
Commission Regulation (EC)
Pharmacovigilance inspections: what HPRA expects
System Safety Regulation
Effective Construction Safety Management
Data Security and Protection Toolkit Assurance 2018/19
S E C S The Complete Package outhfield ngineering alibration
Risk Management NDS Forum June 23rd 2010.
Presentation transcript:

NHS PAM Electrical Systems 2 nd June 2016

1) Policy & Procedures Does the Organisation have a current, approved Policy and an underpinning set of procedures that comply with relevant legislation and published guidance?

1) Policy & Procedures - Evidence Policy applies to all parts of the Trust Estate and personnel as well as to any other person who may come into contact with Electrical Systems and Equipment whilst on any Trust premises. It may include: - 1)High Voltage Distribution 2)Low Voltage Distribution 3)Fixed Electrical Equipment and Plant 4)Portable Electrical Equipment

2) Roles & Responsibilities - Evidence Policy defines responsibilities for the duty to manage the Trust’s health and safety arrangements relating to Electrical Systems and Equipment.

Executive Manager Designated Person Authorised Person Competent Person (External Contractors) Competent Person Authorising Engineer (External Consultant) Electrical Structure (HTM06-02)

3) Statutory Requirements and Guidance Has there been a review of all relevant Statutory requirements and guidance, a risk assessment undertaken and any necessary risk mitigation strategies applied and regularly reviewed?

3) Statutory Requirements and Guidance - Evidence Technical and performance guidance is set out in the latest Health Technical Memorandums (HTM’s) and British Standards. – New standards may not be retrospective and as such may not apply to systems which were designed to older standards. A risk assessment based methodology shall be required where this applies.

Statutory Requirements & Guidance

Location Recommended Maintenance Activities non-invasive visual inspection Non-intrusive functional testInspection & Test Thermographic Survey High-voltage switchgear and protection6 months-tba1 years High-voltage earthing1 years-3 years1 years Transformers1 years-tba1 years Low-voltage switchgear and protection - Main Intake6 months--1 years Low-voltage switchgear and protection - Distribution Centres --1 years Low-voltage earthing6 months-2 years- Generators - PV Solar1 years- - Generators - Combined Heat & Power1 years- - Generators - Standby Diesel1 week3 months1 years- Electromagnetic compatibility--5 years- Lightning Protection System6 months-13 months- Cable containment12 months--- Busbars & Cables12 months-10 yearly- Uninterruptible power supplies, inverters and batteries -6 months - Isolated power supplies-6 months - Harmonic FilterNot installed Power-factor correction units12 months 5 years- Final Circuits - Low Risk Areas6 months12 months5 years- Final Circuits - High Risk Areas6 months 3 years- Portable appliance testinguser18 monthsby assessment no greater 48 months - Example Electrical Inspection & Testing Regime (HTM06-01 Part B)

4) Maintenance, Record Keeping and Asset Register Are assets, equipment and plant adequately maintained with all relevant records (maintenance manuals, procedures, test certificates, etc.) available, up to date and kept in an appropriate manner including, where relevant, an up to date asset register?

4) Maintenance, Record Keeping and Asset Register - Evidence List of assets; Up to date drawings of electrical infrastructure; Evidence of Planned Preventative Maintenance; and Effective maintenance contracts with contractor management.

Example Network Drawing (HTM06-02)

Example Maintenance Worksheet

5) Training Does the Organisation have an up to date training plan in place covering all relevant roles and responsibilities of staff, that meets all safety, technical and quality requirements?

5) Training - Evidence Electrical policy defines the training requirements; Certificates of appointment for AP’s and CP’s should be reviewed on a regular basis; and Authorising Engineer should review on an annual basis.

Training - Evidence

6) Building and Maintenance work Where building and maintenance work impacts on existing systems are risk assessments undertaken and the work designed, undertaken and commissioned to the appropriate standards.

6) Building and Maintenance work - Evidence Contractors Risk Assessments & Method Statements; Trust checks to ensure Contractors employees are competent (e.g. CP(LV) certificates); Constructionline company registration check. Permits-to-work; and Evidence of inspection and testing certificates.

Example Contractors Risk Assessment & Installation Test Certificate

7) Resilience, Emergency & Contingency Planning Does the Organisation have resilience, emergency, contingency and escalation plans which have been formulated and tested with the appropriately trained staff?

7) Resilience, Emergency & Contingency Planning - Evidence Emergency Plans (e.g. on-call action cards) Lists of all standby equipment (e.g. Generators, Central UPS, Local UPS, Theatre Light Battery Backups, Nurse Call Battery Backups, Emergency Lighting, etc.). Evidence of testing the equipment and training.

Example Standby Equipment

Example List of Standby Equipment

Example Maintenance Worksheet

8) Review Process Is there a robust annual review process to assure compliance and effectiveness of relevant standards, policies and procedures?

8) Review Process - Evidence Appointment of an Authorising Engineer; Internal checks on staff training; Review planned preventative maintenance data; and Maintenance contracts (e.g. are recommendations from service visits actioned?)

9) Action Plans If the organisation/site has any inadequate or requires (moderate or minor) improvement ratings in this SAQ, are there risk assessed action plans in place to achieve compliance?

9) Action Plans - Evidence Electrical Strategy detailing priorities and five year plans; Investment in backlog maintenance; Defined standards for upgrade works; and Risk register entries for areas of concern or non- compliance.

Example Action Plan