Reliability Must Run Workshop Introduction May 24, 2016.

Slides:



Advertisements
Similar presentations
Additional CREs to address Stability Limits Beth Garza TAC June 26, 2008.
Advertisements

2004 Congestion Costs. 2 Transmission Congestion Occurs when analysis shows a given outage of a transmission element (contingency) will result in the.
ERCOT RMR Study for Luminant NSO
Economic Criteria for Transmission Planning in the ERCOT Region Public Utility Law Seminar DeAnn Walker August 3, 2012.
ERCOT Load Forecast and Reserve Margin Update June 2, ERCOT Load Forecast and Reserve Margin Update June 2, 2005.
NERC LTRA Update / CDR Capacity Counting Issues
1 Nodal Stabilization Market Call December 28, 2010.
ERCOT RMR Deployment and Cost Proposals By: Matt Mereness and Ino Gonzalez.
10/03/ Report on Existing and Potential Electric System Constraints and Needs Within the ERCOT Region October 3, 2002.
ERCOT RMR Basics Ino González Supervisor, S&B Market Analysis.
Settlement of Mothballed RMR Resources for System Capacity November 15, 2011 RDTF Meeting Ino González ERCOT November 14, 2011.
LAREDO PLANT RMR EXIT STRATEGY Presentation to Board of Directors March 16, 2004 Transmission Services Operations.
Lead from the front Texas Nodal 1 Texas Nodal Energy Management System Requirement Documents December 5, 2006 Jay Dondeti EMS Project.
ERCOT PROGRESS REPORT Board of Directors Austin, Texas October 15, 2002.
ROS Meeting – 12/06/071Texas Nodal Program - TPTF Update Texas Nodal Transition Plan Task Force ROS Meeting Stacy Bridges, ERCOT Thursday, 12/06/2007.
Generation assets important to the reliable operation of the Bulk Electric System What does this mean?
RPRS ERCOT System Wide Insufficiency Charge Presented at the Technical Advisory Committee June 1, 2006.
NPRR XXX: PRR 307 Inclusion in Nodal…Part II. Questions Raised 06/26/06 Section 3 –COP (resource parameters) –CLR participation limits –Telemetry Requirements.
Settlement Stability 2015 Q1 Update to COPS Mandy Bauld ERCOT COPS 04/15/2015.
Discussion of Reliability Must-Run (RMR) Protocol Provisions ERCOT Technical Advisory Committee November 6, 2002.
December 18, 2014 Technical Advisory Committee (TAC) Update to RMS Kathy Scott January 6, 2015 TAC Update to RMS 1.
7 August, 2006 TPTF MMS Issues Review Brandon Whittle Lead, Real-Time Market Operations.
LAREDO RMR EXIT STRATEGY Presentation to Technical Advisory Committee March 4, 2004 Transmission Services Operations.
NPRRs 663NPRR Ancillary Service Insufficiency Actions. This Nodal Protocol Revision Request (NPRR) specifies the actions ERCOT will take to ensure sufficient.
SPP.org 1. Status Update for Reliability and Economic Assessments Stakeholder Meeting September 16, 2008 Austin, TX.
Protocol Revision Subcommittee Tom Burke September 7, 2012.
ERCOT TAC11/2/ CREZ Study Update ERCOT TAC 11/2/2006.
Grid Operations Report To ERCOT Board Of Directors December 16, 2003 Sam Jones, COO.
QSE Managers Working Group Report to WMS, April 8, 2011 S. Looney, Luminant.
NPRRs NPRR649 Lost Opportunity Payments for HDL Manual Overrides. This Nodal Protocol Revision Request (NPRR) proposes two options for a lost opportunity.
Capacity, Demand and Reserves Report Bill Bojorquez May 4, 2007.
Capacity, Demand and Reserves Report Bill Bojorquez Board of Directors Meeting May 16, 2007.
Real Time Balancing (RTB) & Resource Plan Statuses Change to the QSE practice of showing offline units as online and available ERCOT Presentation to ROS.
RMR Exit Strategies Update TAC November 6, RMR UNITS.
2004 CSCs & Zones. Goals for 2004 Increase ERCOT market efficiency Reduce out-of-merit energy and capacity deployments Reduce uplift of local congestion.
Settlement Stability 2015 Q1 Update to COPS- DRAFT Blake Holt ERCOT COPS 07/15/2015.
RA workshop presentation Karl Meeusen, Ph.D. Senior Advisor – Infrastructure Policy CPUC Resource Adequacy Workshop February 18, 2016.
CMWG Update to WMS Met 4/24 & 5/11 Continued Work on PRR 801 –Discussed outages as related to TCR Cases –ERCOT evaluates various outage combinations.
Texas Congestion Management Work Group Update For WMS Marguerite Wagner, PSEG Texas.
Reliability Must Run Resources for Summer Slide 2 RMR for Summer 2011 RMR Contracts for Mothballed Units ERCOT has signed RMR Agreements with two.
Texas Nodal Program ERCOT Readiness & Transition (ERT) Supplemental Information TPTF January 12, 2009 Kevin Frankeny.
Proposed Market Solution for Bates RMR Exit Strategy Frontera Power Station.
TAC Update Kyle Patrick. 2 Nodal ERCOT Program Update –Nodal Market Go-Live (Vote)- vote passed in which TAC certified full nodal systems for Dec 1, 2010.
NPRR784 Mitigated Offer Caps for RMR Units Protocol Revision Subcommittee June 16,
TAC Rejection of NPRR Mitigated Offer Caps for RMR Units
Bad Moon Rising in ERCOT RMR 1. “So you're going to be talking in a minute about an RMR contract in Houston, and that should concern you.” “…what other.
Reliability Must Run Workshop RMR Study Process May 24, 2016.
Open Access Transmission Tariff Amendment No. 9 Greg Broeking, Chief Financial Officer March 7, 2012.
Settlement Update Austin Rosel ERCOT February 27, 2017.
Geert Van Hauwermeiren Workshop, Ljubljana, 13 Sept 2011
TAC Report to the ERCOT Board
Resource Cost Working Group
August 25, 2016 TAC Update to COPS
Prospects for Cross-Border Electricity Trading in North America
PRS Rejection of NPRR Mitigated Offer Caps for RMR Units
Southern Cross Directives Planning Items
ERCOT – Southern Cross Transmission ROS/WMS Working Group Assignments
RMR Update November 6, /05/2002.
A Midsummer Night’s DREAM
Representing Rainbow Energy Marketing Corporation
Project Update and Summary of Project Priority List (PPL) Activity
Regional Transmission Organizations
Status Update for Reliability/Market Power Mitigation Assessment
Oncor Electric Delivery Company LLC
September Protocol Transition Plan
Massachusetts Electric Restructuring Roundtable
Texas Nodal Load Frequency Control (LFC) EDS 3 R6
Generation Repowering & Potential GHG Savings
Transforming Scenario Narratives into Study Cases
Project Management Processes for a Project
Presentation transcript:

Reliability Must Run Workshop Introduction May 24, 2016

2 Introduction Environmental Regulation Update RMR Study Process RMR Dispatch and Commitment RMR Settlements MRA Discussion

PUBLIC 3 What is RMR? Protocol Section : RMR [Reliability Must Run] Service is the use by ERCOT, under contracts with Resource Entities, of capacity and energy from Generation Resources that otherwise would not operate and that are necessary to provide voltage support, stability or management of localized transmission constraints under applicable reliability criteria, where market solutions do not exist.

PUBLIC 4 Has ERCOT had RMR contracts before? Yes! In 2011 ERCOT entered into RMR contracts for Spencer and S.R. Bertron units Previous RMR contracts (all in the zonal market) include Laredo, Permian Basin, PH Robinson, Eagle Mountain, Frontera, Fort Phantom, San Angelo, Rio Pecos, J. L. Bates, Barney Davis, La Palma

PUBLIC 5 What are the goals for today? Capture stakeholder comments on possible RMR Protocol or process revisions Review relevant RMR Protocol requirements Provide informational update on environmental regulations

PUBLIC 6 Questions?