Nodal Planning Go Live Austin, TX February 3, 2011

Slides:



Advertisements
Similar presentations
TAC RELIABILITY AND OPERATIONS SUBCOMMITTEE CMWG/PLWG Planning Criteria Review/Update Report to WMS Austin, TX August 10, 2011 Kenneth A. Donohoo, P.E.
Advertisements

11/08/2005 Ken Donohoo How Does NMMS meet the Nodal Protocol Requirements John Adams 3/23/2006.
Standards Update Project Geomagnetic Disturbance Mitigation Kenneth A. Donohoo, Oncor Electric Delivery Co LLC Chairperson, GMD Task Force Presentation.
1 TSP Nodal Engagement Market Participant Call ERCOT August 04, 2010.
June 12, 2008 ROS SEM Go-Live procedure Linda Clarke.
April 23 rd OWG UFLS Survey & Power Factor Review.
2015 RTP – Study Scope of Short Circuit Analysis RPG Meeting May 19,
SPS policy – Information Presentation Presentation to ROS June 16, 2004.
CRR Auction Scope John Moseley. To outline aspects of the CRR market process to assure that these proposed CRR market protocols (as interpreted by ERCOT.
Lead from the front Texas Nodal 1 Registration Market Call Mar 13, 2009.
Lead from the front Texas Nodal 1 Texas Nodal Energy Management System Requirement Documents December 5, 2006 Jay Dondeti EMS Project.
Ordering Tool Guideline
EDS 2 Early Delivery Systems Review and Request for Approval May 2007 John Webb.
Texas Nodal 1 Nodal Operations Model Posting Confirmation TAC May 7, 2009 Matt Mereness, ERCOT.
EMS User’s Group Presented By Margaret Goodrich Project Consultants, LLC Presented to EMS User’s Group Austin, TX September.
1 ERCOT Nodal Protocols Telemetry Requirements. 2 Protocol References Telemetry TAC will establish TASK force and approve a telemetry criteria.
1 Distribution Networks For Large Cities: EPRI Research on Modelling and Analysis Roger DUGAN Sr. Technical Executive Electric Power Research Inst. US.
Status Update: Using NMMS for Building SSWG Cases Wes Woitt CenterPoint Energy 2010 SSWG Chair.
EMS Users Conference 1 September 23rd – 26th CIM in the Network Model Management System Joel Koepke Network Model Engineer, ERCOT.
Transmission Outage Process April Purpose In compliance with the Protocols and the Electric Reliability Council of Texas (ERCOT) Operating Guides,
1 TSP Nodal Engagement Market Participant Call ERCOT July 14, 2010.
Option 2 Summary Wes Woitt CenterPoint Energy 2010 SSWG Chair.
– 1Texas Nodal Texas Nodal Electrical Buses – 2Texas Nodal Electrical Bus Definition as Proposed in NPRR 63 Electrical Bus A physical transmission element.
DREAM November Meeting. Agenda Introduction and Expectations Path to becoming a Resource Node – ERCOT Registration process for non-modeled resources –
1 TSP Nodal Engagement Market Participant Call ERCOT September 15, 2010.
Lance Cunningham, Ph.D., PE November Frisco, TX 2.
1Texas Nodal Texas Nodal NMMS/RARF Data Discussion By John Moseley, ERCOT, Network Modeling Group.
Operating Guide and Planning Guide Revision Requests Blake Williams, ROS Chair September 13, 2012.
Name Of The College & Dept
NDSWG Report June 16, NDSWG Report Regular meeting held May 16 in Taylor Telemetry / State Estimator Update Naming Convention Electrical Bus Designation.
October 29, 2012 RARF Workshop 2 Introduction to ERCOT Modeling Process Jay Teixeira Manager, Model Administration.
Scheduling and Operating Transmission Devices in the Nodal Environment.
Model load frequency Discussion John Adams January 5, 2010 Nodal Advisory Task Force.
Protocol Revision Subcommittee Rob Bevill January 5, 2012.
1 TSP Nodal Engagement Market Participant Call ERCOT April 21, 2010.
1 TSP Nodal Engagement Market Participant Call ERCOT June 16, 2010.
Reliability and Operations Subcommittee Report 2/2/2012.
Texas Nodal 1 Nodal Operations Model Posting NATF Sep 29, 2009 Matt Mereness, ERCOT.
Oncor Transmission Service Provider Kenneth A. Donohoo Director – System Planning, Distribution and Transmission Oncor Electric Delivery Co LLC
Telemetry and State Estimator Standards Network Data Support Working Group June 16, 2006.
Status Update to ROS: Using NMMS for Building SSWG Cases Wes Woitt CenterPoint Energy 2010 SSWG Chair.
Transition Plan Network Operations Model Change Requests 5/26/2010.
Current Nodal OS Design 1.The NMMS database will have an OWNER and an OPERATOR designation for each piece of equipment in the model. The OWNER and OPERATOR.
SCR760 Preliminary Impact Analysis SCRTSP RequirementCost Delivery Keep TP current for all new PSS/E releases $610K - $760KDec Represent.
1 CenterPoint Energy presentation to TAC regarding the NMMS April 7, 2006.
CRR Network Model One-Line Diagram Beth Garza TPTF April 22, 2008.
1 TSP Nodal Engagement Market Participant Call ERCOT June 02, 2010.
6/21/2007 TPTF: Baselines 1&2 WP and CI Baselines 1 and 2 White Papers and Change Items Diran Obadina.
RELIABILITY AND OPERATIONS SUBCOMMITTEE Report to TAC Austin, TX December 1, 2011 Kenneth A. Donohoo, P.E. Chairperson Oncor Electric Delivery Company.
Texas Nodal Electrical Buses and Outage Scheduling.
STUDY OF ELEMENTS OF A 220/132/33KV SUBSTATION
Current Nodal OS Design 1.The NMMS database will have an OWNER and an OPERATOR designation for each piece of equipment in the model. The OWNER and OPERATOR.
Information Needed By All Market Participants To Facilitate Transmission Congestion Studies In ERCOT Presented to the ERCOT ROS by Shannon Caraway, P.E.
TAC RELIABILITY AND OPERATIONS SUBCOMMITTEE CMWG/PLWG Planning Criteria Review/Update Report to ROS Austin, TX August 11, 2011 Kenneth A. Donohoo, P.E.
Reliability Must Run Workshop RMR Study Process May 24, 2016.
This module will dig deeper into Smart Grid implementation issues. It will focus on two key issue of particular interest to the PNW: 1)How the Smart Grid.
Market Trials Update NATF March 2,
NMT – Network Operations Modeling & Telemetry - Project
Planning Geomagnetic Disturbance Task Force (PGDTF) Meeting Material
NPRR833 Workshop: Contingency Processing in CRR, DAM and SCED
PLWG Review 6.9 and the Interconnection process
Phase Angle Limitations
2011 Prioritization Update to Market Subcommittees
Oncor Electric Delivery Company LLC
ECEN 460 Power System Operation and Control
Presented by: LADWP November 14, 2017
Deploying CIM to Bridge the Modeling Gap Between Operations and Planning Mike usa.siemens.com/digitalgrid unrestricted © Siemens AG 2017.
Chapter 3: Open Systems Interconnection (OSI) Model
EE362G Smart Grids: Architecture
The Network Model Management System
Presentation transcript:

Nodal Planning Go Live Austin, TX February 3, 2011 TAC Meeting Kenneth A. Donohoo, P.E. ROS Chairperson Oncor Electric Delivery Company LLC

Nodal Planning Go Live Complete coordination of operating and planning databases is the goal Meeting all the needs of both environments Increase efficiency Original perception (2006) is that this would be handled in one database NMMS/Network Operations Model Continuous ongoing effort and coordination required to maintain both databases Process shall not create new manual workarounds Reduce possible source for errors Validation concerns Current and new NERC standards requires further operations and planning model changes to support required analysis 02/03/2011 Ken Donohoo ERCOT TAC Meeting - SCR760 & ROS Report

Nodal Planning Nodal Planning is an entirely new method to build future planning cases from operations data Many TSPs already have large existing databases of previously-vetted planning data to create future cases TSPs are a partner with ERCOT on this effort to improve the database to meet planning requirements Very complex translation of different environments Presented at 10/26/2010 NATF meeting Originally presented to 11/04/2010 TAC meeting Developing solutions and options that minimize manual workarounds and permit system-to-system porting of data 02/03/2011 Ken Donohoo ERCOT TAC Meeting - SCR760 & ROS Report

NMMS/NOM to Cases Network Long Term Topology Operations IMM Planning Model (NMMS) IMM (Software) Topology Processor (Software) Long Term Planning Models (MOD) CRR Model 02/03/2011 Ken Donohoo ERCOT TAC Meeting - SCR760 & ROS Report

SCR 760 NOM Summary Update TP/IMM to output latest PSSE version Develop process to keep current with each release Distribution substation capacitor banks Include zero impedance line ratings Associate loads and cap banks to correct CNG Additional autotransformer parameters Improve FACTS device models Assign valid PSSE IDs Include 30 degree phase shift for autotransformers Multi-Section Lines (reliability load throwover scheme) 02/03/2011 Ken Donohoo ERCOT TAC Meeting - SCR760 & ROS Report

SCR 760 Supports Nodal Protocols 3.10 Network Operations Modeling and Telemetry (1) ERCOT shall use the physical characteristics, ratings, and operational limits of all Transmission Elements of the ERCOT Transmission Grid and other information from the Transmission Service Providers (TSPs) … (2) Because the ERCOT market requires accurate modeling of Transmission Elements in order to send accurate Base Points and pricing signals to Market Participants, ERCOT shall manage the Network Operations Model. (5) ERCOT shall use consistent information within and between the various models used by ERCOT Operations, ERCOT Planning, and other workgroups in a manner that yields consistent results. For operational and planning models that are intended to represent the same system state the results should be consistent and the naming should be identical. (9) ERCOT shall update the Network Operations Model under this Section and coordinate it with the planning models for consistency to the extent applicable. 02/03/2011 Ken Donohoo ERCOT TAC Meeting - SCR760 & ROS Report

SCR 760 Supports Nodal Protocols 3.10.2 Annual Planning Model (1) For each of the next five years, ERCOT shall develop models for annual planning purposes that contain, as much as practicable, information consistent with the Network Operations Model. The “Annual Planning Model” for each of the next five years is a model of the ERCOT power system (created, approved, posted, and updated regularly by ERCOT) as it is expected to operate during peak Load conditions for the corresponding future year. (3) ERCOT shall provide model information through the use of the Electric Power Research Institute (EPRI) and North American Electric Reliability Corporation (NERC) sponsored CIM and web-based XML communications or Power System Simulator for Engineering (PSS/E) format. (5) ERCOT shall coordinate updates to the Annual Planning Model with the Network Operations Model to ensure consistency of data within and between the Annual Planning Model and Network Operations Model to the extent practicable. 02/03/2011 Ken Donohoo ERCOT TAC Meeting - SCR760 & ROS Report

SCR 760 Supports Nodal Protocols 3.10.7 ERCOT System Modeling Requirements The following subsections contain the fidelity requirements for the ERCOT Network Operations Model. 3.10.7.1 Modeling of Transmission Elements and Parameters (1) ERCOT, each TSP, and each Resource Entity shall coordinate to define each Transmission Element such that the TSP’s control center operational model and ERCOT’s Network Operations Model are consistent. 02/03/2011 Ken Donohoo ERCOT TAC Meeting - SCR760 & ROS Report

SCR 760 Supports Nodal Protocols 3.10.7.1.3 Transmission Breakers and Switches (1)ERCOT’s Network Operations Model must include all transmission breakers and switches, the operation of which may cause a change in the flow on transmission lines or Electrical Buses. Breakers and switches may only be connected to defined Electrical Buses. (3)ERCOT shall develop methods to accurately model changes in transmission line loading resulting from Load rollover schemes transferring more than ten MW. This may include modeling distribution circuit breakers, dead line sensing, or other methods that signal when the Load should be transferred from one transmission line to another transmission line. ERCOT may employ heuristic rule sets for all manual Load transfers and for automated transfers where feasible. ERCOT application software is required to model the effects of automatic or manual schemes in the field transfer Load under line outage conditions. Each TSP and as applicable, Resource Entity, shall define the Load rollover schemes under Section 3.10.7.2, Modeling of Resources and Transmission Loads, and furnish this information to ERCOT. Transmission field (right-of-way) switches must be connected to a named Electrical Bus and be included in the Network Operations Model. 02/03/2011 Ken Donohoo ERCOT TAC Meeting - SCR760 & ROS Report

SCR 760 Supports Nodal Protocols 3.10.7.1.4 Transmission and Generation Resource Step-Up Transformers (1)ERCOT shall model all transformers with a nominal low side (i.e., secondary, not tertiary) voltage above 60 kV. (3)Each TSP and Resource Entity shall provide ERCOT with information to accurately describe each transformer in the Network Operations Model… 3.10.7.1.5 Reactors, Capacitors, and other Reactive Controlled Sources (1)ERCOT shall model all controlled reactive devices. 02/03/2011 Ken Donohoo ERCOT TAC Meeting - SCR760 & ROS Report

SCR 760 Supports Nodal Protocols 3.10.7.2 Modeling of Resources and Transmission Loads (7)Each TSP shall also provide information to ERCOT describing automatic Load transfer (rollover) plans and the events that trigger which Loads are switched to other Transmission Elements on detection of Outage of a primary Transmission Element. ERCOT shall accommodate Load rollover plans in the Network Operations Model 3.10.7.4 Definition of Special Protection Systems and Remedial Action Plans (1)All Special Protection Systems (SPSs) and Remedial Action Plans (RAPs) used by ERCOT and the TSPs to maintain a secure system must be defined in the Network Operations Model. 02/03/2011 Ken Donohoo ERCOT TAC Meeting - SCR760 & ROS Report