Distribution Statement “A” (Approved for Public Release, Distribution Unlimited) Hallmark Software Testbed (Hallmark-ST) Architecture to Enable Space Enterprise.

Slides:



Advertisements
Similar presentations
Patient Movement in the Midst of a Disaster
Advertisements

State of Indiana Business One Stop (BOS) Program Roadmap Updated June 6, 2013 RFI ATTACHMENT D.
© 2015 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.
Panorama Consulting Group LLC ERP Assessment, Selection, and Planning SAMPLE APPROACH.
> Blueprint Kickoff >. Introductions Customer Vision & Success Criteria Apigee Accelerator Overview Blueprint Schedule Roles & Responsibilities Communications.
Effective Methods for Software and Systems Integration
Chapter 2 The process Process, Methods, and Tools
-Nikhil Bhatia 28 th October What is RUP? Central Elements of RUP Project Lifecycle Phases Six Engineering Disciplines Three Supporting Disciplines.
Phoenix Convention Center Phoenix, Arizona A Review of the Current DOE IDIQ Track 5: Project Financing Session 3: ESPC Large and Small: The Basics of ESPC.
CS 360 Lecture 3.  The software process is a structured set of activities required to develop a software system.  Fundamental Assumption:  Good software.
Submitting IT Purchasing Statements of Work to DIR SB 20 COMPLIANCE FOR TEXAS STATE AGENCIES TECHNOLOGY SOLUTIONS FOR GOVERNMENT AND EDUCATION.
Command & Control Capabilities
SESSION 3: FROM SETTING PRIORITIES TO PROGRAMMING FOR RESULTS.
UNCLASSIFIED 1 1 United States Joint Forces Command United States Joint Forces Command “Growing a Political, military, Economic, Social, Information, and.
March 2004 At A Glance NASA’s GSFC GMSEC architecture provides a scalable, extensible ground and flight system approach for future missions. Benefits Simplifies.
PoDAG XXI: SEEDS SEED: NSIDC Potential Interactions NSIDC DAAC should prepare an evaluation of their desired future roles in "core activities" and in mission.
COBIT®. COBIT® - Control Objectives for Information and related Technology. C OBI T was initially created by the Information Systems Audit & Control Foundation.
EMI INFSO-RI SA1 Session Report Francesco Giacomini (INFN) EMI Kick-off Meeting CERN, May 2010.
Evaluate Phase Pertemuan Matakuliah: A0774/Information Technology Capital Budgeting Tahun: 2009.
U.S. Department of Agriculture eGovernment Program eDeployment Kickoff August 26, 2003.
Modelling the Process and Life Cycle. The Meaning of Process A process: a series of steps involving activities, constrains, and resources that produce.
1 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. Atomic Clock with Enhanced Stability (ACES) Proposers Day Robert Lutwak.
ESSRT In-Process Review September 10, Agenda 1.Work Completed Till Date 2.Scope of future activities and deliverables 2.
Software Development Process CS 360 Lecture 3. Software Process The software process is a structured set of activities required to develop a software.
JAEC Assessment Initiatives and Implications Julia Loughran ThoughtLink, Inc Presented to: NDIA’s Training Transformation.
March 2004 At A Glance The AutoFDS provides a web- based interface to acquire, generate, and distribute products, using the GMSEC Reference Architecture.
UNCLASSIFIED National PNT Architecture Implementation Plan Way Ahead Mr Hal Hagemeier Deputy Director, National Security Space Office October 2010.
Principal Investigator ESTCP Selection Meeting
Short Contribution Title Goes Here
Sample Fit-Gap Kick-off
Today’s Summary Tab 4 Tab 6 Tab 2 Tabs 3 and 5 Defense Acquisition
Business System Development
Software Configuration Management
Software Project Configuration Management
Update from the Faster Payments Task Force
Defense Information Systems Agency A Combat Support Agency
Systems Analysis & Design N106
Software Configuration Management
Principal Investigator ESTCP Selection Meeting
JTAMS POST-CDR IT/SIS ISSUES
Project Integration Management
JTAMS POST-CDR IT/SIS ISSUES
Project Management Lifecycle Phases
JTAMS PRE-MILESTONE B ANALYSIS
JTAMS PRE-MILESTONE B ANALYSIS
Enterprise Content Management Owners Representative Contract Approval
ESMF Governance Cecelia DeLuca NOAA CIRES / NESII April 7, 2017
Needs Identification.
The Open Group Architecture Framework (TOGAF)
Phase 2 Tollgate Review Discussion Template
Digital Government Initiative Initiation Department of Information Technology Estevan Lujan, Acting Cabinet Secretary Susan Pentecost, Managing Director,
Software Measurement Process ISO/IEC
"IT principles" Context, roadmap
SISAI STATISTICAL INFORMATION SYSTEMS ARCHITECTURE AND INTEGRATION
Lockheed Martin Canada’s SMB Mentoring Program
Short Contribution Title Goes Here
Guidance for Proposers Day Slide
Continuity Guidance Circular Webinar
Phase 2 Tollgate Review Discussion Template
HingX Project Overview
WP2 Communication WP and tasks presentation
Guidance for Proposers Day Slide
Joint Planning and Development Office “Where new ideas are welcome”
Principal Investigator ESTCP Selection Meeting
Guidance for Proposers Day Slide
Executive Project Kickoff
Principal Investigator ESTCP Selection Meeting
QoS Metadata Status 106th OGC Technical Committee Orléans, France
OU BATTLECARD: Oracle Identity Management Training
Presentation transcript:

Distribution Statement “A” (Approved for Public Release, Distribution Unlimited) Hallmark Software Testbed (Hallmark-ST) Architecture to Enable Space Enterprise Command and Control Lt Col Jeremy Raley, Ph.D. Program Manager DARPA/TTO Hallmark-ST BAA Overview and Q&A Session 6 July 2016

Thank you for attending Distribution Statement “A” (Approved for Public Release, Distribution Unlimited) This published BAA supersedes anything that may be discussed today. 40/listing.html When in doubt, refer to the BAA.

Space Enterprise Command and Control (SEC2) DARPA is seeking to develop a testbed for measuring, understanding, and integrating the complete spectrum of systems and capabilities to ensure stability, security, and U.S. operational dominance in space Distribution Statement “A” (Approved for Public Release, Distribution Unlimited) Hallmark-ST is seeking to design and develop an integrating enterprise software architecture as well as provide a Space Enterprise Analysis Capability (SEAC).

Hallmark-ST Role in Full Program Process Hallmark-ST aims to become the backbone that permits tool development and experimentation Hallmark-ST architecture would permit rapid tool development and quantified experiments The testbed is designed to expedite the creation of a comprehensive set of new and improved technologies Distribution Statement “A” (Approved for Public Release, Distribution Unlimited) Hallmark-ST – This BAA Hallmark-TCEM – Upcoming BAA

Hallmark-ST Objectives 5 The goal is a comprehensive and effective set of space command and control (C2) capability technologies that can be spiraled into the Joint Space Operations Center and/or the Joint Inter-Agency Combined Space Operations Center Architecture Develop scalable and flexible service-oriented enterprise architecture for integrating space C2 tools and capabilities Application program interfaces (API) Hallmark-ST integration guide Space Enterprise and Analysis Capability (SEAC) Integration of tools, capabilities, and data Execution of tests and scenario-based exercises Ontology for space enterprise operations Inform the data model Part of BAA response The API, Hallmark-ST integration guide, a draft Hallmark ontology and data model will be delivered by the performers within six months of authority to proceed. Distribution Statement “A” (Approved for Public Release, Distribution Unlimited)

Architecture Traits Would Permit Co-development of Capabilities 6 “Hallmark-ST Integration Guide” document is a deliverable designed to ensure software and system/capability providers can be easily integrated with Hallmark-ST Successful proposals should address: Secure enterprise architecture design Implications of federated architecture approaches Applications of foundational architectures to space C2 functional task elements Specification of application programming interfaces (APIs) Data format specifications Data repository design and implementation Concrete strategy for the speedy and effective integration of space C2 tools, capabilities, and mixed-mode data Anticipated tools and capabilities to be integrated in Hallmark-ST include: Space situational awareness Indications and warning Modeling and simulation Course of action generation Decision/action determination Damage assessment Hallmark-ST proposers should address the anticipated integration of the tools and capabilities by other contractors selected by other means Distribution Statement “A” (Approved for Public Release, Distribution Unlimited)

Planned Three-Month Cycles MONTH 1MONTH 2MONTH 3 Mid-Cycle Review Cycle Kickoff Larger Hallmark team-designed development “sprints” Hallmark-ST performer responsibilities: Design and schedule Hallmark improvements Execute SEAC improvements Develop integration plan for this cycle’s tools Work with Tool team & Demo and Eval team to design evaluation event Vignette Defined After-Action Report Lessons learned Next cycle planning Demo / Eval Event Distribution Statement “A” (Approved for Public Release, Distribution Unlimited)

A Successful Proposal Should: Proposals will be evaluated on the following criteria, listed in descending order Overall scientific and technical merit Potential contribution and relevance to the DARPA mission Cost realism Proposer's capabilities and/or related experience Integration “The proposal should address API, and ontology, and data model development experiences and what processes and technologies enable rapid release.” Data Model “Proposals should explain how this data model will evolve along with the Hallmark space ontology and will conserve resources in terms of maintenance costs and data sharing.” 17 elements in requested technical information within the BAA Distribution Statement “A” (Approved for Public Release, Distribution Unlimited)

Hallmark Phase 1, 2, 3 Planned Schedule Key near term Milestones Proposers responses BAA due by August 15, 2016 DARPA will provide response to NLT September 30, 2016 Hallmark schedule seeks to provides transitional capability in FY2020 – permitting an enduring capability to support operational R&D development Distribution Statement “A” (Approved for Public Release, Distribution Unlimited)

Will Possess these key developer attributes Address the bulleted list from BAA of success criteria Describe how the architecture will facilitate easy tool integration Emphasize a tool integration plan as implemented in the Hallmark-ST integration guide Will Not Address cognitive engineering Propose the evaluation of demonstration events Propose specific tool applications Propose an O&M-laden architecture that cannot sustain flexibility, scalability, or extensibility Effective Proposals Will/Will Not: Distribution Statement “A” (Approved for Public Release, Distribution Unlimited)

Question and Answer Session Distribution Statement “A” (Approved for Public Release, Distribution Unlimited)