Report to TAC February 2010. In Brief WMS 2010 Goals WMS 2010 Goals WMS Leadership for 2010 WMS Leadership for 2010 Chair: Barbara Clemenhagen Chair:

Slides:



Advertisements
Similar presentations
QSE Managers Working Group Meeting Notes 9 April, 2010 Report to WMS 21 April, 2010 David Detelich - Chairperson.
Advertisements

1 Generation Adequacy Task Force Report to TAC April 7, 2005.
COPS Update to TAC January 6, Voting Items Three voting items: COPMGRR015, Creating Section 8, ERCOT Settlement and Invoice Process 2. 2.
ERCOT RMR Deployment and Cost Proposals By: Matt Mereness and Ino Gonzalez.
Protocol Revision Subcommittee Sandy Morris August 5, 2010.
QSE Managers Working Group Meeting Notes 3 February, 2010 Report to WMS 17 February, 2010 David Detelich - Chairperson.
May 29, 2014 Technical Advisory Committee (TAC) Update to RMS Kathy Scott June 3, 2014 TAC Update to RMS 1.
November 10, 2009 NOIE DRG Settlements TF update to COPS Settlement Discussion for ALL DG < or = 1 MW Don Tucker on behalf of the NOIE DRG Settlements.
Lead from the front Texas Nodal 1 TPTF Update for TAC November 29, 2007 Trip Doggett.
July 30, 2015 TAC Meeting Update to COPS Michelle Trenary August 12, 2015.
Demand Side Working Group Load Resource Performance Subgroup April 9, 2010 Mary Anne Brelinsky EDF Trading North America.
Report to TAC February In Brief Chair and Vice-Chair for 2009 Chair and Vice-Chair for 2009 Working Group Reports Working Group Reports QMWG QMWG.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee April 8, 2010.
1 WMS Report TO TAC March In Brief Three Working Group Reports Three Working Group Reports Three Task Force Reports Three Task Force Reports EILS.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee March 4, 2010.
Report to TAC October In Brief 2010 CREs 2010 CREs Working Group Reports Working Group Reports MCWG MCWG QMWG QMWG VCWG VCWG Task Forces Task Forces.
Demand Side Working Group Chairman Slides June 27, 2008 Mary Anne Brelinsky Vice President 1.
Report to TAC August In Brief Working Group Reports Working Group Reports CMWG CMWG DSWG (No report) DSWG (No report) MCWG MCWG MWG (No report)
Report to TAC December In Brief Working Group Reports Working Group Reports DSWG DSWG CMWG CMWG MCWG MCWG QMWG QMWG VCWG VCWG Task Forces Task Forces.
Lead from the front Texas Nodal 1 TPTF Update for TAC March 8, 2007 Trip Doggett.
March 7, 2013 Technical Advisory Committee (TAC) meeting update to RMS Kathy Scott March 20, 2013TAC Update to RMS 1.
MIG TF Voting Items Market Participant Notification Period (Transmission outage) – =1 Year Interconnection Date for Protocol Considerations – First Interconnection.
Report to TAC September In Brief Working Group Reports Working Group Reports CMWG – CSC’s 2010 CMWG – CSC’s 2010 MWG – SMOGRR007 MWG – SMOGRR007.
1 WMS Report TO TAC January In Brief Two Working Group Reports Two Working Group Reports Two Task Force Reports Two Task Force Reports One PRR.
The Wholesale Market Subcommittee Update Prepared for the September 25th TAC meeting.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee June 3, 2010.
September 2010 Wholesale Market Subcommittee Report to Technical Advisory Committee.
Lead from the front Texas Nodal 1 TPTF Update for TAC February 1, 2007 Trip Doggett.
1 TAC Report to the ERCOT Board June 21, TAC Summary 8 PRRS 8 PRRS Withdrawal of PRR 552 Withdrawal of PRR 552 Potomac Recommendations Potomac.
1 WMS Report To TAC May In Brief One Working Group Reports One Working Group Reports Two Task Force Reports Two Task Force Reports One Staff report.
1 WMS Report To TAC February In Brief One Working Group Report One Working Group Report One Task Force Report One Task Force Report Five Staff.
Market Credit Working Group Update to WMS Wed. Sept 16, 2009.
Lead from the front Texas Nodal 1 TPTF Update for TAC March 30, 2007 Trip Doggett.
1 TAC Report to the ERCOT Board February 21, 2006.
January 29, 2015 Technical Advisory Committee (TAC) Update to RMS Kathy Scott February 3, 2015 TAC Update to RMS 1.
1 TAC Report to the ERCOT Board February 16, 2005.
Report to TAC March In Brief Voting Items Voting Items GATF – WMS endorsed the recommendations of the GATF GATF – WMS endorsed the recommendations.
Market Credit Working Group Update to WMS Wed. Oct 20, 2010.
Report to TAC July In Brief Working Group Reports Working Group Reports CMWG CMWG DSWG DSWG MCWG MCWG MWG MWG QMWG QMWG VCWG VCWG Task Forces Task.
Market Credit Working Group Update to WMS Wed. Nov 18, 2009.
Lead from the front Texas Nodal 1 TPTF Update Trip Doggett.
Protocol Revision Subcommittee Rob Bevill January 5, 2012.
1 WMS Report TO TAC April 2007 (which is in March)
1 TAC Report to the ERCOT Board November 14, 2006.
Capacity, Demand and Reserves Report Bill Bojorquez May 4, 2007.
December 2010 Wholesale Market Subcommittee Report to Technical Advisory Committee.
Capacity, Demand and Reserves Report Bill Bojorquez Board of Directors Meeting May 16, 2007.
January 28, 2014 Technical Advisory Committee (TAC) Update to RMS Kathy Scott February 4, 2014TAC Update to RMS 1.
Protocol Revision Subcommittee Sandy Morris August 4, 2011.
Presentation to the ERCOT Technical Advisory Committee July 1, 2010.
1 TAC Report to the ERCOT Board July 18, TAC Summary 4 PRRs for approval (3 unanimous) 4 PRRs for approval (3 unanimous) 5 Nodal PRRs for approval.
TPTF Update Trip Doggett TAC March 9, TPTF Update Meetings February 6 & 7, February 20 Attendance approximately 40 Completed review of ERCOT’s clarification.
Congestion Management Work Group 2008 Overview CMWG Marguerite Wagner, Reliant Energy Inc.
Texas Congestion Management Work Group Update For WMS Marguerite Wagner, PSEG Texas.
Report to TAC June In Brief Working Group Reports Working Group Reports CMWG CMWG MCWG MCWG QMWG QMWG VCWG VCWG Other Reports Other Reports NOGRR.
TAC Update Kyle Patrick. 2 Nodal ERCOT Program Update –Nodal Market Go-Live (Vote)- vote passed in which TAC certified full nodal systems for Dec 1, 2010.
MCWG Update to WMS 3/9/2010. Exposure / Collateral Update Nodal Total Potential Exposure reported by ERCOT as of 1/31/11 remains less than Zonal Estimated.
Technical Advisory Committee Presentation to the ERCOT Board of Directors April 18, 2007.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee June 05, 2008.
TPTF Update for TAC October 5, 2007 Trip Doggett
Protocol Revision Subcommittee
TAC Report to the ERCOT Board
Initial ERCOT Parking Deck Prioritization Recommendation
TAC Report to the ERCOT Board
ERCOT – Southern Cross Transmission ROS/WMS Working Group Assignments
Resource Cost Working Group
Technical Advisory Committee
Initial ERCOT Parking Deck Prioritization Recommendation
Generation Adequacy Task Force Update to WMS
Technical Advisory Committee
Presentation transcript:

Report to TAC February 2010

In Brief WMS 2010 Goals WMS 2010 Goals WMS Leadership for 2010 WMS Leadership for 2010 Chair: Barbara Clemenhagen Chair: Barbara Clemenhagen Vice Chair: Jennifer Troutman Vice Chair: Jennifer Troutman Working Group Reports Working Group Reports CMWG CMWG Goals: CSC for 2011, PCAPs and Nodal Competitive Constraint Test, Bus Mapping Goals: CSC for 2011, PCAPs and Nodal Competitive Constraint Test, Bus Mapping DSWG DSWG LaaR Performance LaaR Performance EILS Report - W-B REVISED EILS Procurement for Feb-May 2010 EILS Report - W-B REVISED EILS Procurement for Feb-May 2010 MCWG MCWG NPRR 206 – DAM Credit Requirements, Short-Pay Fund, DAM Collateral Requirements NPRR 206 – DAM Credit Requirements, Short-Pay Fund, DAM Collateral Requirements VCWG VCWG NPRR for FOP dispute (to be submitted), Nodal Start-up Offer for RMR (no variable) NPRR for FOP dispute (to be submitted), Nodal Start-up Offer for RMR (no variable) QMWG QMWG PRR 833 Primary Freq Res from WGR, PRR 841 (endorsed), Load Forecast Accuracy PRR 833 Primary Freq Res from WGR, PRR 841 (endorsed), Load Forecast Accuracy NPRR 091 – concerns raised regarding length of mitigation and what is capped NPRR 091 – concerns raised regarding length of mitigation and what is capped

In Brief Task Forces Task Forces MIGTF – Protocol Changes to be Drafted (91 days / IA Requirements / Minimal Cost) MIGTF – Protocol Changes to be Drafted (91 days / IA Requirements / Minimal Cost) GATF – March presentation to TAC GATF – March presentation to TAC WCATF – Two proposals – will report on the how not the should WCATF – Two proposals – will report on the how not the should Other Activities Other Activities Timing of Trades in Nodal related to Standard Form Contracts Timing of Trades in Nodal related to Standard Form Contracts

WMS Leadership for 2010 Subcommittee Subcommittee Chair, Barbara Clemenhagen, Topaz Power (GEN) Chair, Barbara Clemenhagen, Topaz Power (GEN) Vice Chair, Jennifer Troutman, AEP (IOU) Vice Chair, Jennifer Troutman, AEP (IOU) CMWG CMWG Chair: Marguerite Wagner – PSEG TX (GEN) Chair: Marguerite Wagner – PSEG TX (GEN) Vice-Chair: Eric Goff – Reliant Energy (REP) Vice-Chair: Eric Goff – Reliant Energy (REP) DSWG DSWG Chair: Mary Anne Brelinsky, EDF Trading North America (REP) Chair: Mary Anne Brelinsky, EDF Trading North America (REP) Co-Vice Chair: Nelson Nease, Nucor Steel (CONSUMER) Co-Vice Chair: Nelson Nease, Nucor Steel (CONSUMER) Co-Vice Chair: Timothy Carter, Constellation New Energy (REP) Co-Vice Chair: Timothy Carter, Constellation New Energy (REP) MCWG MCWG Chair: Morgan Davies, Calpine (GEN) Chair: Morgan Davies, Calpine (GEN) Vice-Chair: Eric Goff – Reliant Energy (REP) Vice-Chair: Eric Goff – Reliant Energy (REP) VCWG VCWG Chair: Heddie Lookadoo, NRG (GEN) Chair: Heddie Lookadoo, NRG (GEN) Vice Chair: Ian Davis, Topaz Power (GEN) Vice Chair: Ian Davis, Topaz Power (GEN) QMWG QMWG Chair: David Detelich, CPS (MUNI) Chair: David Detelich, CPS (MUNI) Vice Chair: Jeremy Carpenter, Tenaska (IPM) Vice Chair: Jeremy Carpenter, Tenaska (IPM)

Working Group Reports CMWG Presentation available at Presentation available at Main topics Main topics Goals for 2010 Goals for 2010 Nodal Competitive Constraint Test Nodal Competitive Constraint Test Pre Contingency Action Plans Pre Contingency Action Plans 2011 CSCs 2011 CSCs Bus mappings for Load Zones for Nodal Bus mappings for Load Zones for Nodal Operational Insights Operational Insights Voltage issues at Kendall Voltage issues at Kendall Installation of Yellow Jacket Phase Shifter Installation of Yellow Jacket Phase Shifter

Working Group Reports CMWG Main topics Main topics Nodal Competitive Constraint Test Nodal Competitive Constraint Test Annual Competitive Constraint Process—thought is to mimic existing CSC process. CMWG to work with ERCOT and make recommendation to WMS Annual Competitive Constraint Process—thought is to mimic existing CSC process. CMWG to work with ERCOT and make recommendation to WMS Pre Contingency Action Plans Pre Contingency Action Plans ERCOT committed to check on posting use of PCAPs in RT ERCOT committed to check on posting use of PCAPs in RT One idea was to post at: arch.asp One idea was to post at: arch.asp arch.asp arch.asp This would enable posting in RT and not require system changes This would enable posting in RT and not require system changes Next Meeting: TBA (post-WMS Meeting held on January 27 th ) Next Meeting: TBA (post-WMS Meeting held on January 27 th )

Working Group Reports DSWG Presentation available at Presentation available at

Working Group Reports DSWG LaaR Performance Protocol Revision to LaaR Performance Protocol Revision to

Working Group Reports DSWG EILs Contract Period February – May 2010 EILs Contract Period February – May 2010 The revised and final procurement results are as follows: Business Hours 1 HE 0900 through 1300, Monday thru Friday except ERCOT Holidays; 425 hours MW Procured or Self Arranged350.8 Number of EILS Resources90 (includes 61 aggregations) Projected cost$1,157, Average cost per MW per hour$7.76 Business Hours 2 HE 1400 through 1600, Monday thru Friday except ERCOT Holidays; 255 hours MW Procured or Self Arranged346.7 Number of EILS Resources90 (includes 61 aggregations) Projected cost$685, Average cost per MW per hour$7.75 The revised and final procurement results are as follows:

Working Group Reports DSWG EILs Contract Period February – May 2010 EILs Contract Period February – May 2010 The revised and final procurement results are as follows: Business Hours 3 HE 1700 through 2000, Monday thru Friday except ERCOT Holidays; 340 hours MW Procured or Self Arranged323.0 Number of EILS Resources89 (includes 60 aggregations) Projected cost$920, Average cost per MW per hour$8.38 Non-Business Hours All other hours; 1,859 hours MW Procured or Self Arranged284.1 Number of EILS Resources81 (includes 55 aggregations) Projected cost$3,930, Average cost per MW per hour$7.44 The revised and final procurement results are as follows:

Working Group Reports MCWG Presentation available at Presentation available at Main topics Main topics WMS endorsed DAM NPRR: WMS endorsed DAM NPRR: Expanded loss mutualization for entire market and accelerated DAM Expanded loss mutualization for entire market and accelerated DAM NPRR will be available prior to Feb WMS meeting NPRR will be available prior to Feb WMS meeting NPRR 206 NPRR 206 Update on Short-Pay Fund - a subgroup has been set up to discuss Update on Short-Pay Fund - a subgroup has been set up to discuss

Working Group Reports MCWG Parking Lot and Goals for 2010 Parking Lot and Goals for 2010 Goals to be address at February WMS Goals to be address at February WMS Parking Lot: Parking Lot: Direction of invoice timing change Direction of invoice timing change Perform bottom up review of existing creditworthiness standards (after CCRO Best Practices efforts) Perform bottom up review of existing creditworthiness standards (after CCRO Best Practices efforts) Reduction of settlement cycle due to PRR 568 (7days) Reduction of settlement cycle due to PRR 568 (7days) Further reductions in settlement cycles Further reductions in settlement cycles This includes looking at the potential to reduce the settlement cycle 30% with improved metering This includes looking at the potential to reduce the settlement cycle 30% with improved metering

Working Group Reports QMWG Presentation available at Presentation available at Main Topics Main Topics Review 30 minute NSRS deployments Review 30 minute NSRS deployments WGRPP Forecast Accuracy Update WGRPP Forecast Accuracy Update Zonal RPRS unit de-selection Zonal RPRS unit de-selection PRR841 Revise Total ERCOT Wind Power Forecast – WMS endorsed PRR841 Revise Total ERCOT Wind Power Forecast – WMS endorsed Load Forecasting Accuracy Load Forecasting Accuracy Definition of WGR Definition of WGR SCR757, Real Time Wind Production by Zone SCR757, Real Time Wind Production by Zone PRR833, Primary Frequency Response requirement from Existing WGRs PRR833, Primary Frequency Response requirement from Existing WGRs Draft PRR: Decommitment process for RUC Draft PRR: Decommitment process for RUC Next QMWG Meeting: March 8 th Next QMWG Meeting: March 8 th

Working Group Reports VCWG Presentation available at Presentation available at Main Topics Main Topics Options for Filing RUC Cost Options for Filing RUC Cost Verifiable Costs or Standard Costs Verifiable Costs or Standard Costs Proxy Heat Rate Proxy Heat Rate review DRUC and HRUC after the first 3 months of Nodal to determine if the Proxy heat rate should be changed review DRUC and HRUC after the first 3 months of Nodal to determine if the Proxy heat rate should be changed NPRR Language for allowing disputes for FOP NPRR Language for allowing disputes for FOP To be submitted by CPS To be submitted by CPS ERCOT bidding of RMR Units – no variable ERCOT bidding of RMR Units – no variable Sent to NATF Sent to NATF Next VCWG Meeting: February 10 th Next VCWG Meeting: February 10 th

Active Task Forces Generation Adequacy Task Force Generation Adequacy Task Force WMS expected to vote in February WMS expected to vote in February CDR Inputs, Calculations and Format CDR Inputs, Calculations and Format Installed Capacity Assumptions – use RARF Installed Capacity Assumptions – use RARF New Unit Additions – affirmative declaration New Unit Additions – affirmative declaration Renewables - ELCC Renewables - ELCC Mothballed Capacity – no change Mothballed Capacity – no change DC Tie Capacity – no change DC Tie Capacity – no change Switchable” Capacity - RARF Switchable” Capacity - RARF Netting of Generation and Load – no change Netting of Generation and Load – no change Retired Capacity – introduce “pending unit requirements” line Retired Capacity – introduce “pending unit requirements” line CDR Format – move Summer and Winter Capacities closer to front CDR Format – move Summer and Winter Capacities closer to front

Active Task Forces Joint ROS/WMS Multiple Interconnection of Generation Task Force (MIG TF) Joint ROS/WMS Multiple Interconnection of Generation Task Force (MIG TF) Market Participant Notification Period (Transmission outage) Market Participant Notification Period (Transmission outage) WMS endorsed 91 Days with 17 in favor 3 opposed and 3 abstentions WMS endorsed 91 Days with 17 in favor 3 opposed and 3 abstentions Interconnection Date for Protocol Considerations Interconnection Date for Protocol Considerations MIGTF shall draft protocols to introduce generation operation date. The generation operation date shall define what the generation unit is expected to do, and the Interconnection Date would define the requirements of equipment at the point of interconnection. Existing resources reconnecting to a different line would be grandfathered to the date of the original interconnection. MIGTF shall draft protocols to introduce generation operation date. The generation operation date shall define what the generation unit is expected to do, and the Interconnection Date would define the requirements of equipment at the point of interconnection. Existing resources reconnecting to a different line would be grandfathered to the date of the original interconnection. Motion carried (19), No opposing votes, 3 abstentions Motion carried (19), No opposing votes, 3 abstentions Planning Concept Endorsement Planning Concept Endorsement Option – B - Minimal Cost - As a default view TSPs would try to minimize the cost of Transmission, (ERCOT process does not change regarding optimization). Option – B - Minimal Cost - As a default view TSPs would try to minimize the cost of Transmission, (ERCOT process does not change regarding optimization). Motion carried with no abstentions and one opposed. Motion carried with no abstentions and one opposed. Approval of MIG Whitepaper – Approval of MIG Whitepaper – Next Step to Draft Protocol Revisions Next Step to Draft Protocol Revisions

Active Task Forces Wind Cost Allocation Task Force (WCATF) Wind Cost Allocation Task Force (WCATF) Task Force is working through a Reliant and Luminant proposals (see slides). Task Force is working through a Reliant and Luminant proposals (see slides). Participants continue to have concerns regarding goals of TF. Participants continue to have concerns regarding goals of TF. Next Meeting: February 8 th Next Meeting: February 8 th

WMS 2010 Goals Item [WMS to set prioritization]Item [WMS to set prioritization]WMS input/direction needed byWMS input/direction needed by Nodal Market TransitionNodal Market TransitionOn-going Market Participant Readiness Market Participant Readiness TCR to CRR Transition TCR to CRR Transition Nodal Protocol Tracebility Nodal Protocol Tracebility Nodal Parking Deck Nodal Parking Deck Nodal Test Evaluation Nodal Test Evaluation Nodal Verifiable Cost MethodologyNodal Verifiable Cost MethodologyOn-going (VCWG)On-going (VCWG) Consideration of necessary Zonal Market changesConsideration of necessary Zonal Market changesBefore Q2Before Q2 Review of Generation Adequacy in ERCOTReview of Generation Adequacy in ERCOTQ1 (GATF)Q1 (GATF) Market Issues Related to:Market Issues Related to: Credit issuesCredit issuesOn-going (MCWG)On-going (MCWG) EILSOn-going (DSWG)On-going (DSWG) Reliability & A/S Dispatch Impacts on Energy MarketsReliability & A/S Dispatch Impacts on Energy MarketsOn-going Market Event EvaluationMarket Event EvaluationOn-going Adv. meters & other demand response in A/S and Energy MarketsAdv. meters & other demand response in A/S and Energy MarketsOn-going (DSWG)On-going (DSWG) Wind & related renewable technology integrationWind & related renewable technology integrationOn-going (various WG)On-going (various WG) Criteria in Nodal for supplying A/S, Energy and Capacity MarketsCriteria in Nodal for supplying A/S, Energy and Capacity MarketsOn-going (WMS)On-going (WMS) Integration of Quick Start Resources into NodalIntegration of Quick Start Resources into NodalQSTF Power Storage DevicesOn-going (TBD) LaaR Responsive Reserve Performance Penalty On-going (DSWG)On-going (DSWG)