Presentation For 8.1 MGD Water Supply to Quetta CONSTRUCTION OF MANGI DAM AND WATER CONVEYANCE SYSTEM.

Slides:



Advertisements
Similar presentations
Implementation Guidance Executive Order State of New Mexico Contractor Health Coverage Requirement Michael C. Vinyard, State Purchasing Agent.
Advertisements

The Hashemite Kingdom of Jordan Ministry of Water and Irrigation Jordan Valley Authority RSDS- Phase I Desalination of (80-100) MCM/yr at Aqaba.
Leveraging Community Capacity Financing Civil Society at the Local Level World Bank-InterAction Workshop Samantha de Silva, HDNSP March 02, 2006.
Floyd County Board of Commissioners Special Town Hall Meeting Topic: Update on status of Georgetown WWTP.
Disraeli Bridges Rehabilitation Project Procurement City of Winnipeg Procurement City of Winnipeg Presentation June 18, 2008.
CONTRACTOR OUTREACH PROGRAM September 25, Disaster Recovery Program  $5.08 Billion HUD Funds to Mississippi in form of Community Development Block.
Doosti Dam on shared river of Harirood: A Friendship Bridge Between Iran and Turkmenistan Saeed Nairizi Head of the Board & Managing Director, Toossab.
Alternative Project Delivery
Lunchtime Topics Craig Weise Construction Reform Program Director Lisa Conomy Construction Counsel OSU Office of Legal Affairs.
12-May-151 Khan Younis Waste Water Treatment Plant Management Arrangements Khan Younis Waste Water Treatment Plant Management Arrangements.
Lecture(3) Instructor : Dr. Abed Al-Majed Nassar
Spring 2008, King Saud University Engineering Administration Dr. Khalid Al-Gahtani 1 What is a Project? “A Project is a one-shot, time-limited, goal- directed,
ZHRC/HTI Financial Management Training
Jordan Lake Partnership Western Intake Feasibility Study Jordan Lake Partnership Western Intake Feasibility Study 1.
Process Engineer’s Role in Project Management Dr Abdullah Malik.
By: Alizar Rizvi Fatima Raza VIII-A. Mangla Dam is located on the Jhelum river. Kashmir, Pakistan. It is the 16th largest dam in the world. It was built.
United Water & Sanitation District Stonegate Village Metro District Water Supply Opportunities 1.
Procurement Process Economic Stimulus. Items to Be Discussed Professional Services Information Design Build vs. Conventional Where to Find Advertisements.
Equus Beds ASR Program – Wichita’s Future Water Supply September 6, 2012.
Three Gorges Project: A Project of the Century By: Xinyu Huang.
Cost Allocation Studies for the MP Region Bureau of Reclamation April 29, 2008 Central Valley Project Cost Allocation Study Update Public Meeting #2: October.
Completing the State Aid Payment Request (SAPR). Tips Each spring check on the State Aid Finance web page for the current version of the State Aid Pay.
Neotech Institute of technology Department of Civil Engineering
For Long Term Water Security SARDAR SAROVAR (NARMADA) PROJECT Sardar Sarovar Narmada Nigam Limited Dr. M.B. Joshi GM (Tech. & Coor.)
Hydro Electric Power Plant
TSUNAMI RELIEF PROGRAM KICK OFF MEETING. INTRODUCTION WHAT IS PROCUREMENT? WHY IS UNDERSTANDING PROCUREMENT SO IMPORTANTS? WHAT ARE THE BASIC PRINCIPLES.
ALISAGAR LIFT IRRIGATION SCHEME – 2 years period
PUSHKARA LIFT IRRIGATION SCHEME (2 years period)
RHD Foundation Terms and conditions of the auction Address Yaroslavl region, village of Gubtsevo. Lease right price (initial price) (four million.
Short and Long Range Water Supply Planning and Aquifer Performance Test (APT)
Aerojet Environmental Update Carmichael Town Hall Meeting March 12, 2008 Michael Girard Aerojet Environmental Site Remediation (916)
Diversion of Flood Water from Ganga at Kanpur.  Introduction  Study Area  Flow Pattern of Ganga at Kanpur  Quantification of Divertible Flood  Downstream.
Introduction Procurement of Consultant Services (based on PPA 2004 and Best Practices) Presented by: NM Lema Macrh, 2013.
PUBLIC PROCUREMENT SYSTEM IN TAJIKISTAN RAVSHAN KARIMOV AGENCY FOR PUBLIC PROCUREMENT UNDER THE GOVERNMENT OF THE REPUBLIC OF TAJIKISTAN.
(Water Availability : 57.50TMC, Ayacut proposed: 2,55,510Acs)
PACKAGE 22PACKAGE 23 Total Ayacut under this scheme: 50,250 Ac. KOILSAGAR LIFT IRRIGATION SCHEME, MAHABOOBNAGAR DISTRICT (FLOW DIAGRAM) Approach channel.
PPP Legal & Regulatory Framework. PPP Policy In July 2008 GOK approved the PPP policy directive through which: PPPs are identified as a method for investing.
Coordination of Right of Way on Design-Build Contracts By- Richard Bennett State Right of Way Director Virginia DOT.
11 PUBLIC HEARINGS ON CONDITIONAL GRANTS AND CAPITAL EXPENDITURE 2008/2009 PARLIAMENT 27 AUGUST 2008.
Richland Creek Water Supply Program Contract for WTP and Pump Stations CMAR Services and Program Update Paulding County, Georgia Board of Commission Work.
Why Groundwater is used? 1.Accessible to large number of users at an affordable price 2. Less capital intensive than surface water and is not dependant.
Kevin Colvett, P.E. Nashville Corrective Action Plan and Engineering Report, Phase III for Metro Water Services and the City of Brentwood, TN Presentation.
Small Purchase of Professional Service Providers Administrative Rule R
Erdeneburen HPP Project Implementation Unit
1 EASTERN MUNICIPAL WATER DISTRICT Cactus II Feeder Transmission Pipeline Joe Mouawad, PE Sr. Director of Engineering September 2, 2015.
Building Capacity of SMEs for Participation in Public Procurement Draft Presentation for Training of Trainers June 2014.
Approve Change Order No. 4 for the Caylor Wholesale Meter Modification Item 4B.
I P M 1 City of Fort Worth City Council Presented by Doug Rademaker, Deputy Director, PMO Ken Hall, IPM Program Manager, CH2M HILL October 6, 2009 I n.
Richland Creek Water Supply Program Update Paulding County, Georgia Board of Commissioners Work Session March 08, 2016.
Paper Presented by At the Zambezi River Basin Stakeholder Conference : 22 – 23 Nov Windhoek, Namibia Eng. S. Z. Mhlanga Senior Manager (Projects.
Compliance with CCNA F.S..  Advertisement  Longlist  Shortlist  Request for Proposal  Scope of Services Meeting  Technical Proposal Review.
Stage 2 Light Rail Transit Program “In the ground ready”
SPMU Details Sl. No. Post under NHP Name Designation 1.
The Port of New Orleans - As-Needed Consultant Selection Process for Professional Services June 9, 2016.
PRE-ACCESSION PROJECT IMPLEMENTATION IN CROATIA
Systems Analysis and Design in a Changing World, 4th Edition
December 2016.
Presentation of the case in Japan for Technical Committee K - Integrated Operation of Hydropower Stations and Reservoirs- Centers for Civil Engineering.
GANDHINAGAR INSTITUTE OF TECHNOLOGY
Completing the State Aid Payment Request
PROJECT DELIVERY METHODS
In The Name of ALLAH the Most Gracious the Most Merciful
Introduction DEFINATION :-
portfolio committee on ON the Independent development trust
October 29, 2018 Terry Lauritsen, P.E.
Delta Water Supply Project
Richland Creek Water Supply Program Program Update
Construction Management Services April 16, 2018
Brieana Reed-Harmel, Broadband Project Manager
Presentation transcript:

Presentation For 8.1 MGD Water Supply to Quetta CONSTRUCTION OF MANGI DAM AND WATER CONVEYANCE SYSTEM

Name of Project: Construction of Mangi Dam and water Conveyance System Location: The Mangi Dam is proposed to be constructed Near Mangi Village on Khost River about 76Km from Quetta City. Estimated CostRs. 9, million Construction of Dam Body (Rs billion) Construction of Water Conveyance System (Rs.5.05 billion) Construction of Boosting Stations, Surface Storage Tanks and Building (Rs billion) 3

SALIENT FEATURES A.DAM BODY B.Type:Concrete Gravity Height over deepest foundation:61 M ( ft) Catchment Area:1217 Sq Km (470 sq miles) Crest Length:202 M ( ft) RESERVOIR: Mean Annual Flow:20.3 MCM ( Acre-ft) Gross Reservoir Capacity:36.43 MCM ( Acre-ft) Dead Storage:4.69 MCM ( Acre-ft) Live Storage:31.74 MCM ( Acre-ft) Total Annual Releases:13.41 MCM ( Acre-ft) 15 ft3 /sec B.SPILLWAY Type and Location :Ungated, Confined Overflow Design Discharge:888 m 3 /s (31353 ft 3 /s) based on 1 in 10,000 year return period 4

Crest Width30.0 m (98.4 ft) C. INTAKE STRUCTURES Intake Type and Size:Intake structure built on upstream of dam body D. WATER CONVEYANCE SYSTEM Pumping Main to High Point40 Km of 600 mm DI pipeline Combined Gravity Main20 Km of 450 mm DI Pipeline Pumping RequirementsIntake Tower plus three Booster pumping stations Maximum Capacity of Pumping Station.36,720 m 3 (8.1mgd) Water Storage Tanks Capacity (18,000m 3 )2 Nrs. (40,00,000 gallons each) Capacity (5,400m 3 )3 Nrs. (12,00,000 gallons each) 5

RIVER GORGE AT MANGI DAM AXIS

Reservoir Area on Right Side of Dam Site MANGI DAM

DAM LAYOUT PLAN

HOUSES BUSHES GRAVEYARD PROPOSED DAM RESERVOIR BOUNDRY ORCHARD CULTIVATED LAND ROAD / TRACK NALA FLOW DAM CREST LEVEL = M NORMAL POOL LEVEL = M RESERVOIR BOUNDRY RESERVOIR AREA = 400 HECTARES LIMIT OF RESERVOIR AREA TO BE ACQUIRED AT LEVEL = 1624 M PROPOSED GRAVITY DAM MANGI DAM RESERVOIR G.L = 1595 M RUINS OF RAILWAY BRIDGE

Executing AgencyPublic Health Engineering Department through Project Management Unit (PMU) Mangi Dam Project by establishment of Two Supervisory Cells i.e Dam: A cell of technical team from Irrigation Department will assist the PD Mangi Dam Project during execution of dam component. Water Conveyance System: A cell of technical committee from Public Health Engineering Department will assist during execution of water conveyance component. Approval Status Mangi Dam Project is included in Federal PSDP with 50:50 sharing basis. The Project is approved by ECNEC on 08 th March 2016, an amount of Rs million has already been released by the Federal Government, whereas; Rs million is current year allocation in Federal PSDP. Time of Completion36 months 11

Objectives. i.Providing about 8.1 MGD for augmenting the existing under stress water requirements of Quetta Town. ii.Shifting the existing trend of extracting underground water by means of tube wells to more sustainable option of constructing the surface water storage reservoirs. iii.Providing un-interrupted drinking water supplies to the inhabitants of Quetta Town by means of Construction of water Tanks in Quetta Valley. iv.Uplifting the livelihood of inhabitants by providing employment and business opportunities during construction phase of the project. v.Mitigating the impacts of floods D/S of proposed Dam site. 12

Present Status a)Expression of Interest (EOI) for shortlisting of country leading well reputed consulting firms has been completed. b)The Request for Proposal (RFP) documents have been provided to the shortlisted consulting firms in order to obtain technical & financial proposals (Last date 09 th June, 2016) Contract Agreement with FWO The Mangi Dam project was originally part of QWSEIP, but later on excluded from the scope of project and included in Federal PSDP as an independent project. Initially an agreement dated for survey investigation and designing of Mangi & Halak Dam was signed with FWO for a cost of Rs million. FWO has completed the assigned task & payment of Rs million has been made to FWO. 13

Another agreement for construction of Mangi Dam and Conveyance System was made with FWO through “Direct Contracting” against contracted price of Rs billion on The same could not attain maturity & finally the Mangi Dam project was excluded from scope of QWSEIP project & included as on independent project in Federal PSDP. Balochistan Public Procurement Regularity Authority (BPPRA) rules have now been implemented in Balochistan w.e.f To decide fate of agreement signed with FWO, legal advice from Law & Parliamentary Affairs Department was sought. The Law & Parliamentary Affairs Department concluded that the contract agreement of June 2007 is not advisable in light of judgments of the Hon’ble Supreme Court and enforcement of BPPRA rules. 14

Way Forward Award of Civil Works In order to expedite pace of progress of project and to save time, the process of pre-qualification of Civil Contractors as per Balochistan Public Procurement Rules 2014 needs to be initiated. Some of the country leading civil works contractors are: Frontier Works Organization (FWO) National Logistic Cell (NLC) Descon International Pvt Ltd o Meerani Dam Project awarded (Rs.6.0 Billion) Zahir Khan & Brothers (ZKB) o Shadi Kaur Dam Project (Rs.7.0 Billion) o Basol Dam Project (Rs.9.6 Billion) Sadullah Khan & Brothers (SKB) o Sabakzai Dam Project (Rs.2.0 Billion) 15

Agha Construction Company o Construction of Six Dispersal structures on Nari River (4.5 Billion) Noor ul Haq & Brothers o Sawar Kaur Dam Project (1.00 billion) o Water Conveyance System of Shadi Kaur Dam Project. (2.50 billion) o Water Conveyance System of Basol Dam Project. (3.50 billion) Conclusion. The Reputed firms such as; FWO, NLC & other major construction companies will be facilitated & encouraged to participate in the bidding process 16