990901EIS_RR_Tech.1 Overview and Status of EIS Technical Program Dr. Clarence M. Korendyke EIS US Project Scientist Naval Research Laboratory 202-767-3144.

Slides:



Advertisements
Similar presentations
EIS/Solar-B: EIS information that was sent to System Side EIS subsystems: EIS consists of three EIS subsystems. (a) STR: Structure, (b) HAR: Harness, (c)
Advertisements

Plans for LSE-130 through CD-2 Gregory Dubois-Felsmann SLAC National Accelerator Laboratory.
990901EIS_Opt.1 The Instrument: Optical Design Dr. John T. Mariska Data Coordination Scientist Naval Research Laboratory
Cyber Education Project Accreditation Committee November 2014.
Laser Display System Christopher Nigro David Merillat.
Univ. of XXXXXXXXX 1 Things To Include: Team Photo Team Logo/Name.
WBS & AO Controls Jason Chin, Don Gavel, Erik Johansson, Mark Reinig Design Meeting (Team meeting #10) Sept 17 th, 2007.
NGAO interface control documents: Christopher Neyman W. M. Keck Observatory Keck NGAO PD phase Meeting #6 March 19, 2007 Videoconference.
Overview of Advanced Design White Paper Farrokh Najmabadi Virtual Laboratory for Technology Meeting June 23, 1998 OFES Headquarters, Germantown.
EMIS Chapter 6. EMIS Chapter 6 EMIS Chapter 6 Fig 6.2 shows where the SEMP fits into the earliest program stages. Fig 6.5 has an.
NGAO System Design Phase System & Functional Requirements Documents NGAO Meeting #6 Peter Wizinowich April 25, 2007.
Systems Engineering Management
TECH 101 Product Design and Manufacturing. TECH 1012 System Life-Cycle Engineering 2 Major phases in almost all products and in many cases services –Acquisition.
NGAO Instrumentation Preliminary Design Phase Planning September 2008 Sean Adkins.
LSU 10/09/2007System Design1 Project Management Unit #2.
Engineering Systems of.
LSU 01/18/2005Project Life Cycle1 The Project Life Cycle Project Management Unit, Lecture 2.
990901EIS_RR_Instru.1 The Instrument: US Subsystems and Requirements Dr. Clarence M. Korendyke US Project Scientist Naval Research Laboratory
990901EIS_RR_Science.1 Science Investigation Goals and Instrument Requirements Dr. George A. Doschek EIS US Principal Investigator Naval Research Laboratory.
Conceptual Design Review Design Requirements The Systems Perspective Rob Hubbard Systems Engineering.
GTRInewFormat.ppt-1 Electronic Systems Laboratory TMC Operator Requirements and Position Descriptions, Phase 2, Kickoff Meeting Presented by Dennis J.
ENGR-11_Engineering_Design_Cycle_Details.ppt 1 Bruce Mayer, PE Engineering-11: Engineering Design Bruce Mayer, PE Licensed Electrical.
DVA Series Work Flow P. Dewdney Apr 15, SPDO DVP Work Flow 2 DVA-1 CPG.
PACS IIDR 01/02 Mar 2001 Instrument Interfaces1 PACS FPU Opto-mechanical Design Overview and Interfaces J. Schubert MPE.
NASA’s Goddard Space Flight Center Systems Engineering Mike Pryzby Swales Aerospace August 16-17, 2005.
System issues System decomposition / Product tree System specification: function, performance, interfaces, budget Work-breakdown structure.
Golf Swing Robot EE 486 Project Presentation College of Engineering and Technology Presented by Nasser Almarri.
POAD Book: Chapter 8 POAD: Analysis Phase Instructor: Dr. Hany H. Ammar Dept. of Computer Science and Electrical Engineering, WVU.
Request for Proposal (RFP)
THE PROJECT LIFE CYCLE PROJECT MANAGEMENT LIFE CYCLE LSU 01/18/2005 PROJECT LIFE CYCLE 1.
Software Development A Proposed Process and Methodology.
Week 04 Object Oriented Analysis and Designing. What is a model? A model is quicker and easier to build A model can be used in simulations, to learn more.
P15051: Robotic Eye Project Definition Review TIM O’HEARNANDREW DROGALISJORGE GONZALEZ KATIE HARDY DANIEL WEBSTER.
SRR and PDR Charter & Review Team Linda Pacini (GSFC) Review Chair.
Engr 691 Special Topics in Engineering Science Software Architecture Spring Semester 2004 Lecture Notes.
The Field Camera Unit Results from technical meeting S. Scuderi INAF – Catania.
How Software Projects Start SW projects start with a need. We need to keep better data on the students in the CSCE Dept. I heard that one of our competitors.
990901EIS_RR_HV.1 Heritage and Validation Approach Dr. Clarence M. Korendyke EIS US Project Scientist Naval Research Laboratory
Request for Proposal (RFP) In response to the RFP – the first step is to prepare a proposal 1. Review Customer Requirements and come up with candidate.
BioRainbow Development Process Description. Development Process Overview We use combination of MSF development technology ( Extreme.
بسم الله الرحمن الرحيم وبه نستعين
Chapter 4 – Requirements Engineering Lecture 2 1Chapter 4 Requirements engineering.
RockSat-C 2013 SITR Payload Subsystem Integration and Testing Report University/Institution Team Members Date.
Writing Technical Reports
T Project Review X-tremeIT I1 Iteration
Technology Readiness Assessment (TRA)
THE COMPANY OPTIKRON, your partner for micro-optics, assemblies and optical coatings was founded in 1992 in the optics and technology region of Jena. We.
Chapter 6: Database Project Management
Solar-B Science Working Group
OVERVIEW Impact of Modelling and simulation in Mechatronics system
POAD Book: Chapter 8 POAD: Analysis Phase
Problem-Based Learning Diagrams
Request for Proposal (RFP)
Focus Areas Business and Applied Business Fine Arts, Design, and Media
Systems Engineering Bob Goeke.
Systems Engineering Bob Goeke 27 June 2005 System Engineering.
بعض النقاط التي تؤخذ في الحسبان عند تقييم الاستثمارات الزراعية
Project II Rule Optimizer for the Atlas Reactivity Engine CNT
HMI Reliability Dale Wolfe Reliability Engineer LMSSC*ATC*LMSAL
EMIS 7307 Chapter 6.
CS/EE/ME 75(a) Nov. 19, 2018 Today: Prelimnary Design Review Homework.
GLAST Large Area Telescope:
Scientific Method Song
Introduction and Overview
PSS verification and validation
Instrument Overview Larry Springer HMI Program Manager
Project Management Unit #2
<Your Team # > Your Team Name Here
Malu Balachandrana, R Rajeshb
Introduction To Software Development Environment
Presentation transcript:

990901EIS_RR_Tech.1 Overview and Status of EIS Technical Program Dr. Clarence M. Korendyke EIS US Project Scientist Naval Research Laboratory

990901EIS_RR_Tech.2 Physical Block Diagram

990901EIS_RR_Tech.3 Electrical Block Diagram

990901EIS_RR_Tech.4 Program Responsibilities

990901EIS_RR_Tech.5 EIS Scientific Characteristics

990901EIS_RR_Tech.6 General Status Completing the EIS Conceptual Design Identified Critical Interface and Technical Issues Within the Experiment Have Pursued Specific Cost and Technical Issues Within the US Components Development Program, Optics, Filters, Actuators, etc. Have Completed the Conceptual Design and Prepared for Expected Phase B Breadboard Development Have Significantly Iterated and Optimized the Overall EIS Design Have Calculated Exposure Times for Numerous Configurations Have Modeled Precision of Doppler and Turbulent Velocity Measurements

990901EIS_RR_Tech.7 Optical Subsystem Status Design Principles and Trade-Offs Well Understood (>10 Designs Studied) Present Design Satisfies Science Objectives While Minimizing Risk and Cost Mirror and Grating Specifications Have Been Sent to Vendors for Comment First Cut Sensitivity Analysis Has Been Conducted Filter Specifications Are Being Iterated

990901EIS_RR_Tech.8 NRL Mechanism (MIR, SLA, GRA) Status Conceptual Design Has Been Completed Conceptual Design Satisfies Requirements Actuator Specifications Have Been Drafted and Iterated With the Vendor Location, Fit, and Mounting Point Issues Have Been Resolved Draft Electrical Interface Document Has Been Written