System Status Update February 2012. Overview Review of year to date demand and energy Review of recent system performance Outlook for summer 2012 What.

Slides:



Advertisements
Similar presentations
Roadmap for Sourcing Decision Review Board (DRB)
Advertisements

Responding to the Electricity Challenges: Five Point Plan Overview 19 December 2014 Confidential 1.
Click to edit Master title style 0 Eskom’s MYPD2 Tariff Application 03 December 2009 Brian Dames – Chief Officer (Generation Business)
2015/06/091 Overview of Maintenance & Infrastructure Delivery of Eskom Overview of Maintenance & Infrastructure Delivery of Eskom Eng Logan Pillay Eskom.
G 200 L 200 ISO NEW ENGLAND T H E P E O P L E B E H I N D N E W E N G L A N D ’ S P O W E R. COLD SNAP Overview of Proposed Options for Winter 2004/2005.
IMO 18-Month Outlook Presentation to the F&ASC June 25, 2003.
Forecasts and Assessments Presented to the Independent Power Producers’ Society of Ontario Pat Doran, Supervising Technical Officer Independent Electricity.
R Southwest Gas Corporation February 16, 2001 Southwest Gas Corporation Update on Factors Affecting Gas Prices n Storage u Storage levels continue below.
Study Results Drought Scenario Study This slide deck contains results from the 2011 TEPPC Study Program. This study shows the impact in the interconection.
Big Sandy Rural Electric Cooperative Corporation 2006 Load Forecast Prepared by: East Kentucky Power Cooperative, Inc. Forecasting and Market Analysis.
Farmers Rural Electric Cooperative Corporation 2006 Load Forecast Prepared by: East Kentucky Power Cooperative, Inc. Forecasting and Market Analysis Department.
Commercial Opportunities
20 September 2015 GAZ DE FRANCE ESS Introduction of Gas Reserve Arrangements Mark Bailey Gaz de France ESS.
Reliable Power Reliable Markets Reliable People Performance Targets for the Customer Interconnection Process January, 2008.
Grayson Rural Electric Cooperative Corporation 2006 Load Forecast Prepared by: East Kentucky Power Cooperative, Inc. Forecasting and Market Analysis Department.
Updated Cost/Benefit Analysis for PRR Part A/S Bidding Proposed Methodology.
ISO Outlook Summer 2005 and Beyond Senate Energy, Utilities and Communications Committee February 22, 2005 Jim Detmers Vice President of Grid Operations.
1 BRIEFING ON THE CURRENT ELECTRICITY CRISIS AND PRICING TO The Portfolio Committee on Minerals and Energy 28 th May 2008.
Annual Results Presentation 27 August 2009 Jacob Maroga – Chief Executive Empowering the South African dream.
May 03, UFE ANALYSIS Old – New Model Comparison Compiled by the Load Profiling Group ERCOT Energy Analysis & Aggregation May 03, 2007.
Growth Initiatives Mailing Services MTAC February 18, 2010.
© Nano Time Limited – October 2008 Source Planning What –Analytical process that for creating procurement and supply strategies for key categories Wh y.
Blue Grass Energy Cooperative Corporation 2006 Load Forecast Prepared by: East Kentucky Power Cooperative, Inc. Forecasting and Market Analysis Department.
Licking Valley Rural Electric Cooperative Corporation 2006 Load Forecast Prepared by : East Kentucky Power Cooperative, Inc. Forecasting and Market Analysis.
1 Review Group 264 Rules & Options Analysis for BSSOQ Methodology Changes Post MOD th September 2009.
Writing and updating strategic and annual plans Richard Maggs Astana September 2014.
Interim Fuel Factor Adjustment and Surcharge for Under-Recoveries
Review of National Power System and 2008 Winter Prognosis
Department of Higher Education and Training
MELBOURNE RENEWABLE ENERGY PROJECT
RESTRUCTURING OF THE ELECTRICITY DISTRIBUTION INDUSTRY
Inquiry into the national electricity supply shortage and load shedding Presented to the Parliamentary Portfolio Committee on Minerals and Energy 28 May.
SECRET.
Affordable Energy Production from Renewable Fuel
Eskom Holdings Limited Reg. No. 2002/015527/06
Economic Operation of Power Systems
M1 J32-35a 60mph through Roadworks trial
ColumbiaGrid Summary of: COI Utilization Report dated May 4, 2011
NEDLAC REPORT TO THE NATIONAL ASSEMBLY PORTFOLIO COMMITTEE ON ENERGY
DEPARTMENT OF MINERAL RESOURCES
MRES Resource Operations in SPP
CSP Grid Value of Energy Storage and LCOE Implications 26 August 2013
MELBOURNE RENEWABLE ENERGY PROJECT
EU-IPA12/CS02 Development of the Renewable Energy Sector
THE LABOR SUPPLY / DEMAND ANALYSES THE “HATRAK” APPROACH TO USING
Plan the implementation of change
TVA RC 2017 Summer Outlook TVA RC July 27, 2017.
Benefits of New England’s Proposed Capacity Market
2018/19 ANNUAL PERFORMANCE PLAN FOR MISA
2017 Jan Sun Mon Tue Wed Thu Fri Sat
Energy Intensive User Group Generation Maintenance Update
Financial benefits of solar and wind power in South Africa in 2015
Jan Sun Mon Tue Wed Thu Fri Sat
Presented by: Ms Siyabulela Bashe
portfolio committee on ON the Independent development trust
Special MRC – Fuel Security
INTERCONNECTED SYSTEM GENERATING CAPACITY RELIABILITY EVALUATION
Calendar.
Study Results Drought Scenario Study
Progress on the Renewable Energy IPP Procurement Programme
Options for the Development of a Demand Side Response Mechanism
Progress on the Bucket Eradication Programme
Planning Reserve Margin
Wholesale Electricity Costs
Isaac Sokopo Group Electrification Planning Manager
Contingency Plan for the March/April, 2006 possible power shortage
Weekly System Status week 34 (19/08/2019 – 25/08/2019) System Operator
Weekly System Status week 28 (08/07/2019 – 14/07/2019) System Operator
Weekly System Status week 37 (09/09/2019 – 15/09/2019) System Operator
Weekly System Status week 38 (16/09/2019 – 22/09/2019) System Operator
Presentation transcript:

System Status Update February 2012

Overview Review of year to date demand and energy Review of recent system performance Outlook for summer 2012 What is being done to meet the challenges 2

Weekly peak demand 3 The peak demand in 2011 was similar to the all time high in 2007, although it should be noted it occurred before the typical winter peak period, indicating the shift in demand from winter. The summer demand in 2011 was generally higher than that previously experienced. There was an increase in the annual “energy sent out” (incl sales to Eskom from non Eskom generation) of about 1.3% (Y-Y)

2012 load growth Initial weeks showed a slightly higher demand than 2011, but initiatives are in place to reduce demand and results have been seen over the last few weeks. There has been about 0.5% energy growth Y-Y compared to the same time last year (including non Eskom sales to Eskom) 4

Constrained generation trends – OCGT usage In 2011 we used our OCGTs more to ensure that as much as possible maintenance is done while keeping the lights on. This has been continued in However there is still a maintenance backlog. 5

Reserve utilisation Although a similar number of incidents of usage of emergency and supplemental demand side options occurred, there has been a substantial increase in the volume of OCGT usage to accommodate maintenance. 6

Generation availability 7 The full and partial generation load losses are indicated above. There was a peak in November 2011 and January This has contributed to the increase in OCGT utilisation as well as influenced the availability of opportunity for maintenance.

What do we expect in summer 2012 Year to date the system has been extremely tight with frequent use made of emergency reserves. Higher than normal OCGT load factors are an indication of the tightness the system has been operated at to accommodate maintenance. However planned maintenance requirements still exceed the capacity available for maintenance. In addition, generation forced outages have contributed to this, both full units and partial load losses at various stations for a number of reasons. This situation is not expected to ease off as outages that have previously been postponed are now getting to a point where they have to be done, for technical and statutory reasons. 8

Expected system status 9 With all gas we should be operating in the green. Our normal planning assumption is 3600MW unplanned with 4 500MW being a risk assessment. It is clear that without deferring maintenance, the system status is more risky. DateMaintenance Excess Capacity available assuming use of 2238MW of OCGT capacity, required 3600MW unplanned allowance, required Operating Reserves and Forecast Excess Capacity available assuming use of 2238MW of OCGT capacity, required 4500MW unplanned allowance, required Operating Reserves and Forecast 13-Jan-12. Fri Jan-12. Fri Jan-12. Thu Jan-12. Tue Feb-12. Tue Feb-12. Mon Feb-12. Mon Mar-12. Thu Mar-12. Mon Mar-12. Wed Mar-12. Thu Mar-12. Mon Apr-12. Tue Apr-12. Tue Apr-12. Tue Apr-12. Wed May-12. Wed May-12. Mon May-12. Mon May-12. Thu May-12. Mon Jun-12. Thu Jun-12. Thu Jun-12. Thu Jun-12. Wed Jul-12. Mon Jul-12. Mon Jul-12. Wed Jul-12. Mon Jul-12. Mon

10 Maintenance outlook Jan - Jul Green : Sufficient capacity to meet demand, reserves and allowance for planned and unplanned maintenance of generation plant. Yellow : 0 to 1000MW short of capacity needed. Orange : 1000 to 2000 MW short of capacity needed. Red : 2000 to 4000MW short of capacity needed. Brown : Greater than 4000MW short of capacity needed For maintenance scheduling, 1300MW of OCGT capacity is considered and the ideal scenario is to operate in the “green” zone. In planning mode, an “orange”, “red” or “brown” status is unacceptable and outages will have to be deferred. Operation within the “green” zone is needed to manage typical risks, such as loss of a large nuclear unit, loss of imports from Cahora Bassa or multiple unit trips at the coal stations.

Required Capacity to ensure stable system operation 11 Ideally, MW of committed capacity from supply and demand initiatives is needed immediately to keep the lights on and enable maintenance to continue. Reducing this target will require a significant adjustment to the maintenance programme. Between now and end-December 2013, the minimum targets set out in the table below need to be achieved to prevent an emergency. Immediate (within 1 month) (MW) By July 2012 (MW) and sustained to end December 2013 High load factor initiatives to bring certainty to maintenance planning Pre-Emergency/ Contingency/Peaking initiatives

Way Forward Eskom has set up a recovery team to: Execute the plan to secure identified and approved demand and supply levers. Step up communications to encourage greater energy efficiency. Be clear about our maintenance philosophy and the governance processes to manage risk and specify operating envelopes for power generation plants. Implement an effective outage strategy, using maintenance windows to reduce the backlog, deal with emerging risks and conduct scheduled, design-based maintenance. Implement a more sustainable maintenance philosophy throughout the generation fleet. The Department of Public Enterprises has established a task team with Eskom to develop the detailed delivery schedule and review progress, coordinate activities that require Government intervention, prepare updates for Cabinet and align communication and stakeholder plans. 12

System Status if initiatives materialise 3600MW Unplanned Allowance4500MW Unplanned Allowance DateMaintenance Excess Capacity available assuming use of 2238MW of OCGT capacity, required 3600MW unplanned allowance, required Operating Reserves and Forecast MW risk incl. gas with 1000MW mitigation MW risk incl. gas with 2000MW mitigation MW risk incl. gas with 3000MW mitigation Excess Capacity available assuming use of 2238MW of OCGT capacity, required 4500MW unplanned allowance, required Operating Reserves and Forecast MW risk incl. gas with 1000MW mitigation MW risk incl. gas with 2000MW mitigation MW risk incl. gas with 3000MW mitigation 13-Jan-12. Fri Jan-12. Fri Jan-12. Thu Jan-12. Tue Feb-12. Tue Feb-12. Mon Feb-12. Mon Mar-12. Thu Mar-12. Mon Mar-12. Wed Mar-12. Thu Mar-12. Mon Apr-12. Tue Apr-12. Tue Apr-12. Tue Apr-12. Wed May-12. Wed May-12. Mon May-12. Mon May-12. Thu May-12. Mon Jun-12. Thu Jun-12. Thu Jun-12. Thu Jun-12. Wed Jul-12. Mon Jul-12. Mon Jul-12. Wed Jul-12. Mon Jul-12. Mon

14 What has been done Signed power purchase agreements (PPA’s) with the two municipalities to secure baseload generation. Secured available non-Eskom generation from customer base on a short term basis. Signed power buyback agreements, where we were able to remove base demand off the system, while some were deferred to the winter period. Obtained voluntary co-operation over peak periods from large customers (at least 400MW) Additional DMP has been obtained and non Eskom peaking plant is being finalised Demand Response Aggregator Pilot Program (DRAPP) has been initiated and an additional 500 MW of demand response is expected by winter Identified possible cross border generation and engagements are currently taking place.

Summing up South Africa’s power system will be tight for the next few years: the next two years are critical. Summer is maintenance season in Eskom. System is being run at higher levels of risk to tackle backlog and keep up with maintenance while at the same time meeting demand. Strategy of shifting maintenance outages can no longer be sustained. We need to save 10% of our current energy demand and remove 3000MW from our demand to ensure that the power system can be operated in a stable mode and that adequate maintenance is done on the generation fleet to provide safe and sustainable performance.

Thank You