Page 1 TQC Mechanical Model Igor Novitski / Rodger Bossert May 24, 2006 Results of MM#4 and MM#5.

Slides:



Advertisements
Similar presentations
Coil TQ 36 size measurements F. Nobrega/ R. Bossert
Advertisements

LR Summary and LQ Plan Jesse Schmalzle w/ contributions from: J. Muratore (BNL) P. Ferracin (LBNL) October 18, 2007.
Mechanical Analysis of Dipole with Partial Keystone Cable for the SIS300 A finite element analysis has been performed to optimize the stresses in the dipole.
Mechanical Design & Analysis Igor Novitski. Outlines Electromagnetic Forces in the Magnet Goals of Finite Element Analysis Mechanical Concept Description.
LHQ Coil 1 OL Curing LHQ Coil 1 Shipping Miao Yu 02/28/2013.
QXFSM1 Mirror Shim System R. Bossert Dec. 1, 2014 LARP Teleconference.
EuCARD-HFM ESAC review of the high field dipole design, 20/01/2011, Maria Durante, 1/40 EuCARD-HFM ESAC Review of the high field dipole design Fabrication.
Racetrack Coil Technology – G. Ambrosio 1 LARP DOE review – FNAL, June. 5-6, 2007 BNL - FNAL - LBNL - SLAC Racetrack Coil Technology (LR, SQ) & other Supporting.
S. Caspi, LBNL HQS Progress Report High Field Nb 3 Sn Quadrupole Magnet Shlomo Caspi LBNL Collaboration Meeting – CM11 FNAL October 27-28, 2008.
Preliminary Design of Nb 3 Sn Quadrupoles for FCC-hh M. Karppinen CERN TE-MSC.
Rolling element bearings A. Lozzi 09
LCLS-II Magnetic Structure Design Review - Conceptual Mechanical Design: Module Assembly Method Alan Black Steve Marks 7/6/11 1.
Helene Felice Joint LARP CM20 / Hilumi Meeting April 8 th to 10 th 2013 Napa, CA, USA HQ02 Assembly summary and Next steps.
LARP QXF 150mm Structure Mike Anerella / John Cozzolino / Jesse Schmalzle November 15, nd Joint HiLumi LHC-LARP Annual Meeting.
LHQ Coil Fabrication Experience and Plan Miao Yu 04/08/2013.
H. Felice - P. Ferracin – D. Cheng 09/19/2013 Update on structure CAD model.
Helene Felice HQ02 Assembly status 02/28/2012. HQ02 layout COIL 16COIL 15 COIL 17COIL 20 VIEW LOOKING AT LEAD END A C BD Sector A Sector B Sector C Sector.
H. Felice - P. Ferracin – D. Cheng 09/11/2013 Update on structure CAD model.
2 nd Joint HiLumi LHC – LARP Annual Meeting INFN Frascati – November 14 th to 16 th 2012 Helene Felice Paolo Ferracin LQ Mechanical Behavior Overview and.
Fred Nobrega. 9 Dec 2014 Model Design & Fabrication – FNAL Fred Nobrega 2 Outline Background Mechanical Design Model Magnet Features Coil Technology and.
The construction of the model of the curved fast ramped superconducting dipole for FAIR SIS300 synchrotron P.Fabbricatore INFN-Genova The construction.
FNAL QXF Curing Mold Miao Yu, FNAL 05/07/2013. FNAL Short Curing Press 2 2 meter long Capacity (pump psi) Max. force/cylinder kN (ton) Spacing cm(inch)
DOE Review of LARP – February 17-18, 2014 Coil Design and Fabrication Miao Yu February 17,
11 T Nb3Sn Demonstrator Dipole R&D Strategy and Status
11 T Dipole Status at FNAL Fred Nobrega January 21, 2014.
Fred Nobrega, Nikolai Andreev 21 September, 2015.
S. Caspi, LBNL HQ Progress and Schedule Shlomo Caspi LBNL LARP Collaboration Meeting – CM13 Port Jefferson November 4-6, 2009.
Subscale quadrupole (SQ) series Paolo Ferracin LARP DoE Review FNAL June 12-14, 2006.
Hybrid Structure with Cooling John Cozzolino LARP Collaboration Meeting Port Jefferson, NY November 4-6, 2009.
Magnet design, final parameters Paolo Ferracin and Attilio Milanese EuCARD ESAC review for the FRESCA2 dipole CERN March, 2012.
LMQXFA Cold Mass Assembly Antonios Vouris Fermilab February 3, 2016.
HQM01 Test Summary Outline -Magnet Instrumentation and Shim System -SG Data -Short Sample Limits -Quench Training at 4.6 K and 2.2 K -Ramp rate and Temperature.
S. Caspi, LBNL TQS – Progress and plans Shlomo Caspi LBNL Collaboration meeting FNAL April
L/R Coil Asymmetry Coil Fabrication Working Group Trey Holik Wednesday, June 3 rd 2015.
1 BNL -FNAL - LBNL - SLAC P. Wanderer IR’07 - Frascati 7 November 2007 U.S. LARP Magnet Programme.
Fabrication of test coil for D1 2m model Michinaka SUGANO KEK WP3 meeting 08/10/2014.
DOE Review of LARP – February 17-18, 2014 SQXF Coil Design and Fabrication Winding and Curing Miao Yu February 17,
Cold Mass and Assembly Tooling Design, Procurement Status and Assembly Plan Igor Novitski Fermilab 15 T Dipole Design Review April 2016 April 28-29,
CERN MBHSM0101 and Plan for Future Models F. Savary on behalf of the 11T Dipole Project Team.
S. Caspi, LBNL HQ Magnet Program Shlomo Caspi LBNL LARP DOE Review FNAL June 1-2, 2011 BNL Jesse Schmalze Mike Anarella Peter Wanderer Arup Gosh FNAL Rodger.
QXF Winding/Curing Tooling and Curing Mold Miao Yu, FNAL 04/09/2013 CM20_Napa Valley, CA.
3 rd ESAC Review, 27 th February to 1 st March 2013, CEA Saclay Fresca2 Dipole Structure Assembly J.C Perez on behalf of Fresca2 collaboration team.
1 Long QXF Mirror Fabrication (MQXFPM1) Rodger Bossert HiLumi-LARP Collaboration Meeting May 18-20, 2016 SLAC R. Bossert - HiLumi Collaboration Meeting.
1 MQXFS Mirror Fabrication R. Bossert, G. Chlachidze, S. Stoynev HiLumi-LARP Collaboration Meeting May 11-13, 2015 FNAL.
LHQ Coil Fabrication Experience and Plan Miao Yu 04/08/2013.
16 T dipole in common coil configuration: mechanical design
QXF Coil Fabrication & Tooling Reaction / Impregnation
TQS Overview and recent progress
Model magnet test results at FNAL
HQ Mirror Assembly R. Bossert
TQS Structure Design and Modeling
Rodger Bossert/Shlomo Caspi
Mechanical tolerance analysis for the MQXF prototype structures
SQXF Mirror QXFSM1 Strain Gauges
16 T Cosq DIPOLE Mechanical Analysis
LARP Technology Quadrupole Review
11T Dipole – Single Aperture 2m Model
TQC-01 SG data I. Novitski.
Plans for the PSI Canted-Dipole Program
Mechanical Modelling of the PSI CD1 Dipole
11 T dipole coil features and dimensions
FRESCA2 Update on the dipole design and new calculations
16 T dipole in common coil configuration: mechanical design
Helene Felice 02/15/2013 HiLumi Meeting HQ Program
Bore quench field vs. critical current density
the MDP High Field Dipole Demonstrator
MKQXF FEA Model Haris Kokkinos
Helene Felice 02/15/2013 HiLumi Meeting HQ Program
Fred Nobrega September 4, 2019
MQXFS6 assembly and loading
Presentation transcript:

Page 1 TQC Mechanical Model Igor Novitski / Rodger Bossert May 24, 2006 Results of MM#4 and MM#5

Page 2 Goals of Mechanical Models #4 and #5 1.Determine mid-plane shim for collaring. – MM#4 2.Determine shim between collared coil and yoke – MM#5 3.Verify that yoke welding procedure can provide acceptable stress to control spacers and coils. MM #5 – Collared coil assembly only – Made with practice coils #2 and #4 (impregnated at LBNL). Used full round collars. Purpose was to determine mid-plane shim. MM #4 – Included yoke and skin – Made with practice coils #1 and #3 (impregnated at FNAL). Used full round collars. Purpose was to verify yoke welding and determine collar-yoke shim.

Page 3 TQC collared coil. MM #5 – Collared coil only – Made with practice coils #2 and #4 (impregnated at LBNL). Used full round collars. Strain gauges placed on inner surface of inner coil to measure preload during and after collaring. Fuji Film placed at mid-plane to understand relationship between inner and outer layer preload. Procedure: 1.Measure coils azimuthally 2.Key coils with 2 shim sizes (0 and 4 mil) 3.Read strain gauges. 4.Check Fuji film. 5.Re-key with final shim size. 6.Take final readings of strain gauges and collar deflections.

Page 4 MM #5 – First, practice coil #2 was measured individually using reaction tooling in hydraulic press. Measured size was similar, slightly smaller than the nominal size at 60 MPa. Measurements for coil #2 are shown below: The coils were then placed into the collars and keyed.

Page 5 Fuji film placed at the mid-plane showed that inner- outer preload was approximately the same and uniform radially across the cable. With no azimuthal shim Strain gauge readings on coil surface of MM#5 during collaring (inner coil only).

Page 6 With 4 mil azimuthal shim Fuji film placed at the mid-plane showed that inner- outer preload was approximately the same and uniform radially across the cable.

Page 7 Collar deflection measurements using the 5 mil shim are shown above. Deflections are consistent with a preload of about 70 MPa. Based on these results, a 5 mil midplane shim was chosen (2 ½ mils per coil), and a final keying was done using this shim.

Page 8 TQC cross-section. MM #4 – Included yoke and skin – Made with practice coils #1 and #3 (impregnated at FNAL). Used full round collars. Strain gauges were placed on inner surface of inner coil to measure preload increase when yoking. Strain gauges were placed on the control spacers to ensure adequate contact with yoke. Strain gauges were bonded to the skin to verify the expected stress after welding.

Page 9 MM#4 Procedure: 1.Measure collar outside diameter and yoke inside diameter. 2.Install collar-yoke preload shims according to the measurements. 3.Place completed collared coil into yoke. 4.Press yoke until contact with control spacers is made according to strain gauges 5.Weld skin in several passes. 6.Take readings of strain gauges to confirm that contact is made on control spacers, skin stresses are appropriate, and proper coil preload is achieved. Strain at pole is expected to approximately double between the collared and yoke assemblies.

Page 10 Q4-coil1 Q3-coil1 Q2-coil3 Q1-coil3 Gauges bonded to inner surface of inner coils

Page 11 Collar OD and Yoke ID measurement. A 3 mil radial interference is desired. Based on these measurements, 18 mil radial shims were used. Collar OD Yoke ID (Collared coil using Practice coils #1 and #3)

Page 12 Strain gauges on Control spacers show contact made by press to vertical blocks, then contact made to horizontal blocks during skin welding. Stress in skin, from skin gauges, averaged about 250 MPa after welding, about the expected value. Horizontal block Vertical block Horizontal block

Page 13 Near pole Near midplane Near pole Out of range MM#5 Quadrant 1 strain gauge readings

Page 14 MM#5 Quadrant 2 strain gauge readings Near midplane Near pole

Page 15 MM#5 Quadrant 3 strain gauge readings Near pole

Page 16 MM#5 Quadrant 4 strain gauge readings Near pole Out of range Near pole

Page 17 Final midplane shim size of 5 mils (2 ½ mils per side) will be used when collaring TQC01. Collar-yoke shim with 3 mils radial interference (based on measured collar and yoke measurements during assembly) will be used on TQC01. Welding procedure is adequate to achieve proper yoke-control spacer contact. Measured skin stress conforms with analysis. Proceed with TQC01. Conclusions