RF Pulse Compression system for CTF3.

Slides:



Advertisements
Similar presentations
Areal RF Station A. Vardanyan RF System The AREAL RF system will consist of 3 RF stations: Each RF station has a 1 klystron, and HV modulator,
Advertisements

Areal RF Station A. Vardanyan RF System The AREAL RF system will consist of 3 RF stations: Each RF station has a 1 klystron, and HV modulator,
1 Bates XFEL Linac and Bunch Compressor Dynamics 1. Linac Layout and General Beam Parameter 2. Bunch Compressor –System Details (RF, Magnet Chicane) –Linear.
RF Stability Working Group Jorn Jacob (ESRF), John Byrd (LBNL) General Issues RF phase and amplitude noise –filtered by cavity and translate into timing.
RF Synchronisation Issues
RF Systems and Stability Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center.
Beam loading compensation 300Hz positron generation (Hardware Upgrade ??? Due to present Budget problem) LCWS2013 at Tokyo Uni., Nov KEK, Junji.
Demonstration of the Beam loading compensation (Preparation status for ILC beam loading compensation experiments at ATF injector in this September) (PoP.
CERN klystron test stand – CLIC Workshop, Oct page 1 F. Peauger High-Power RF Test Areas: Design & Planning Progress of the CERN Klystron Test Area.
R. Corsini, CLIC Project Meeting - 24 th May 2013 CTF3 1 CTF3: Highlights of the 1 st run R. Corsini for the CTF3 Team 1.
Alessandro Cappelletti for CTF3 collaboration 5 th May 2010 RESULTS OF BEAM BASED RF POWER PRODUCTION IN CTF3.
8/24/2015Pengda Gu, Structure Meeting Study on 30GHz Pulse Compressor 1.Simulation of a multi-cavity RF pulse compressor using a coupled resonator model.
Room temperature RF Part 2.1: Strong beam-cavity coupling (beam loading) 30/10/2010 A.Grudiev 5 th IASLC, Villars-sur-Ollon, CH.
Compensation of Transient Beam-Loading in CLIC Main Linac
Drive Beam and CTF 3 International Workshop on Linear Colliders 2010 October 22, 2010 Erik Adli, Department of Physics, University of Oslo and CERN Bernard.
RF Synchronization Activity at SPARC A.Gallo and D. Alesini, M. Bellaveglia, R. Boni, G. Di Pirro, A. Drago, A.Ghigo P. Baldini, L. Cacciotti, M. Scampati,
R&D proposals for EuCard 2 EuCard2, April 21Steffen Döbert, BE-RF  SRF basic research (W. Weingarten)  CTF3 and CTF3+, possible infra - structure for.
PULSE SHAPING ISSUES FOR THE PETS TESTING PROGRAM AT SLAC A.Cappelletti SLAC, Oct 2008.
Grzegorz Jablonski, Technical University of Lodz, Department of Microelectronics and Computer Science XFEL-LLRF-ATCA Meeting, 3-4 December 2007 XFEL The.
1Matthias LiepeAugust 2, 2007 LLRF for the ERL Matthias Liepe.
RF Cavity Simulation for SPL
ECE 662 – Microwave Electronics
Two-beam Test Stand Status and Results Roger Ruber & Igor Syratchev for the TBTS team.
Ding Sun and David Wildman Fermilab Accelerator Advisory Committee
RF scheme of electron linear accelerator with energy MeV Levichev A.E. Budker Institute of Nuclear Physics SB RAS.
Beam Loading experiment at KEK ATF ( Multi-train acceleration at KEK-ATF Injector ) KEK Masafumi Fukuda and Junji Urakawa LCWS /10/052 train acceleration.
1 Franz-Josef Decker 1 Multi-Bunch Operation for LCLS Franz-Josef Decker March 17, Definitions and goals multi-bunch within.
EnEfficient RF Sources Workshop. June 2014 I. Syratchev X-band high RF power testing activity at CERN I.Syratchev.
Femtosecond phase measurement Alexandra Andersson CLIC Beam Instrumentation workshop.
12 GHz Stand alone power source. Provisional Klystron Parameters ParametersSpecificationsunitsObservations RF Frequency12 (11.4)GHz Peak RF power50 -75MW.
SPL waveguide distribution system Components, configurations, potential problems D. Valuch, E. Ciapala, O. Brunner CERN AB/RF SPL collaboration meeting.
Oleksiy Kononenko CERN and JINR
I. Syratchev, structure team meeting, Re-circulation Re-visited I. Syratchev.
CLIC Workshop 2008 TBTS status. PETS testing program and installation status. Igor Syratchev & Germana Riddone for the CLIC team.
Overview of long pulse experiments at NML Nikolay Solyak PXIE Program Review January 16-17, PXIE Review, N.Solyak E.Harms, S. Nagaitsev, B. Chase,
RF phase & amplitude stability of the CTF klystrons By Dubrovskiy Alexey 4 February 20091CLIC beam physics meeting And thanks to Frank Tecker and Daniel.
X-band Based FEL proposal
Measurement and Instrumentation
High-efficiency L-band klystron development for the CLIC Drive Beam High-efficiency L-band klystron development for the CLIC Drive Beam CLIC workshop,
A CW Linac scheme for CLIC drive beam acceleration. Hao Zha, Alexej Grudiev 07/06/2016.
Status of the sub-harmonic bunching system for the CLIC DB injector front end Hamed Shaker School of Particles and Accelerators, Institute for Research.
KLYSTRONS OUTPUT CORRECTION: LabVIEW CODE DEVELOPMENT AT SLAC A.Cappelletti CERN, 22 Apr 2009.
Areal RF Station A. Vardanyan
Prospects for developing new tubes
Multi-stage pulse compressor
How does a klystron work? TE-MPE Section Meeting Karolina Kulesz
Multi-bunch Operation for LCLS, LCLS_II, LCLS_2025
Lesson 20: Process Characteristics- 2nd Order Lag Process
RF Synchronization Activity
Development of X-band 50MW klystron in BVERI
Steering algorithm experience at CTF3
Soft and hard mode switching in gyrotrons
with operating voltage
An X-band system for phase space linearisation on CLARA
Application of moderate (5 MW) X-band power sources for the CLIC accelerating structures testing program and other projects I. Syratchev, CERN.
Application of the moderate peak power (6 MW) X-band klystron’s cluster for the CLIC accelerating structures testing program. I. Syratchev.
Sven Reiche UCLA ICFA-Workshop - Sardinia 07/02
CLIC Klystron based. Updates 2017.
High Efficiency X-band Klystron Design Study
High Efficiency X-band Klystron Design Study
CLIC Drive Beam Stabilisation
Klystron Power Supplies for ILC
Electric Field Amplitude (MV/m)
LCLS RF Stability Requirements
Lecture 6 ACCELERATOR PHYSICS HT E. J. N. Wilson
CLIC Feasibility Demonstration at CTF3
Accelerator Physics Particle Acceleration
Operational Experience with LCLS RF systems
RF Parameters Calculation for JLEIC Colliders (e Ring)
Gap Transient Suppression using Increased Bunch Density
Presentation transcript:

RF Pulse Compression system for CTF3. MDK Workshop, CERN, Geneva, April 2001 RF Pulse Compression system for CTF3. I.Syratchev, CERN MDK-2001 CERN Switzerland

 RF Pulse Compression is the only way to increase RF power level from the number of klystrons available for CTF#3.  RF phase/amplitude modulation is the tool to control the RF pulse shape in a system - klystron plus “SLED”-like RF pulse compressor.

RF Pulse Compression system for CTF3. The flat pulse after the cavity based pulse compressor (LIPS), with modulation of the input RF phase (PM). The linear part of the phase slop will be compensated with the frequency shift: Tout =  LIPS cavity Q0 =1.8x105, =8 2.3 Input phase Output  2.1 6.5 sec RF phase, degree Power gain 5.5 sec Time, ns Time, ns

RF Pulse Compression system for CTF3. The effect of residual RF phase sage and energy spread. R. Corsini Energy spread The residual phase envelops after two RF stations 1=60 2=80 1=80 2=60 1 minimized 2 Single bunches profiles after re-combination. No energy spread

RF Pulse Compression system for CTF3. The flat pulse after the cavity based pulse compressor (LIPS), with modulation of the input RF phase-to-amplitude (PTA). Time LIPS LIPS+PTA 1 2 Amplitude 1 2 Comparison between PTA and PM Pros:  Output pulse flat both in RF amplitude and phase.  Easy RF power level control.  Better stability of operation. Cons:  Less efficient (~10%).  Two klystrons needed.

RF Pulse Compression system for CTF3. Power gain. PM PTA Klystron pulse, sec Power gain LIPS Modified # LIPS modification is mainly the adjusting of the cavity coupling.

RF Pulse Compression system for CTF3. System operation stability. The examples of the compressed RF pulse distortion due to the klystron RF phase ripples. Because of the energy spread, the demand on the compressed pulse flatness : P/P < 2% Time Power a) RF Phase modulation. Klystron RF phase ripples 30 peak-to-peak. The main sources of instability: Klystron RF phase and amplitude jitter as result of HV supply instability. 1 Time Power b) RF Phase-to-amplitude modulation. Klystron RF phase ripples 100 peak-to-peak. PM P/P, % PTA Klystron’s RF phase amplitude of ripples, degree.

RF Pulse Compression system for CTF3. System operation stability. 2 The frequency deviation of the storage cavity, mainly because of the temperature variation. The identity of the LIPS cavities resonant frequencies. 3 F=-10 kHz -3 kHz -1 kHz Time, ns Power 2 P/P, % 3 F, kHz To keep the flatness of the compressed pulse within specified P/P, the temperature stabilization of the cavity must be < ± 0.04 0C.

RF Pulse Compression system for CTF3. System operation stability. Algorithm of the fast correction of the cavity frequency shift. Standard “SLED” Pulse RF phase modulation Flat pulse Distorted pulse -10 kHz Re-adjustment of the RF phase modulation in a fast local feedback system of the klystron. Old New Temperature control system. Flat pulse RF phase modulation

RF Pulse Compression system for CTF3. Experiments with high RF power level. R. Bossart, December 2000. Klystron output RF phase 100 1.92 ~100 Time RF power RF phase 1sec Klystron LIPS RF phase Time, ns Klystron drive phase Initial RF phase ripples correction Parameters: Q unloaded 1.6x105 Coupling 8.0 Tin 5 sec Tout 1.4 sec P out/in 34.7/18 MW P gain/teor. 1.92/2.04 P/P < 1%

RF Pulse Compression system for CTF3. Barrel Open Cavity pulse compressor. 3 GHz version. WHY? 1. We need at least four more RF pulse compressors. 2. The BOC has one cavity, operating in a travelling wave regime - solves the problem of the cavity’s pair identity. 3. Easy to manufacture than LIPS. We can do it in CERN. 4. The test prototype is preparing for the high RF power test.

RF Pulse Compression system for CTF3. The Barrel-cavity theory. The eigen-frequency of the Barrel cavity with Emnq oscillation is the solution of the next equation: mn is a root of the Bessel function that for the big m can be approximated as: The optimal radius r0, when the external caustic has the smallest height comes from: where  and  are derived from: Finally the height of the external caustic and Q-factor of the cavity are: z  =   =  r0 -d d 2h r 2a Cavity profile

RF Pulse Compression system for CTF3. The shape of the 3.0 GHz Barrel-cavity. R150 R100(L) any R50(R2) Q=1.9780*105 F=2.99855 GHz R125.113* R228(R1) 241.116* 197.75* 11.627(a) 60.150() R239.627

RF Pulse Compression system for CTF3. The modes of the 3.0 GHz Barrel-cavity. H11,1,2 E10,1,1 H9,1,4 E8,1,3 H7,1,6 2.907 GHz 3.000 GHz 2.918 GHz 3.0134 GHz 2.922 GHz E7,2,1 E6,1,5 E5,2,3 3.081 GHz 3.0215 GHz 3.097 GHz

RF Pulse Compression system for CTF3. General view and technical sketch of the 3.0 GHz BOC RF pulse compressor.

RF Pulse Compression system for CTF3. Discussion... Questions ?...