TeraGrid Accounting System Progress and Plans David Hart July 26, 2007.

Slides:



Advertisements
Similar presentations
Scaling TeraGrid Access A Testbed for Attribute-based Authorization and Leveraging Campus Identity Management
Advertisements

User Introduction to the TeraGrid 2007 SDSC NCAR TACC UC/ANL NCSA ORNL PU IU PSC.
How-to Use iLab Solutions software within Auckland Science Analytical Services in the Faculty of Science, the University of Auckland Auckland Science Analytical.
Module 4: System Maintenance Intuit Financial Services University Internet Banking Certification Training.
University of Florida Academic Activities Reporting (Formerly IWF)
Transition. TG/XD Transition TG awardees are expected to make funding last until March 31, 2010 XD start date is Apr 1, 2010 RP Planning – non-Track 2.
Technology Steering Group January 31, 2007 Academic Affairs Technology Steering Group February 13, 2008.
Technology Steering Group January 31, 2007 Academic Affairs Technology Steering Group February 13, 2008.
TeraGrid Science Gateway AAAA Model: Implementation and Lessons Learned Jim Basney NCSA University of Illinois Von Welch Independent.
TG QM Arlington: GIG User Support Coordination Plan Sergiu Sanielevici, GIG Area Director for User Support Coordination
JIRA Defect Tracking Tool Tool to Record, Track and Resolve Issues, Bugs, Defects, Improvements and New Feature Requests LIGO-G M.
Core Services I & II David Hart Area Director, UFP/CS TeraGrid Quarterly Meeting December 2008.
Network, Operations and Security Area Tony Rimovsky NOS Area Director
NOS Objectives, YR 4&5 Tony Rimovsky. 4.2 Expanding Secure TeraGrid Access A TeraGrid identity management infrastructure that interoperates with campus.
SMART METER TEXAS Status Update July 29, AGENDA Release 1 Smart Meter Texas Online Portal Update – SMT Solution Update – Registration Statistics.
Scaling Account Creation and Management through the TeraGrid User Portal Contact: Eric Roberts
ILearnNYC Platform Session Objectives Provide an understanding of overall platform components, how they fit together and associated timelines Explain.
DBS to DBSi 5.0 Environment Strategy Quinn March 22, 2011.
Michigan’s E-Grants Project Presented by: C. Douglass Couto Agency Services Information Officer Department of Information.
TeraGrid VO Support and Plans for AAA Testbed Dane Skow, Deputy Director TeraGrid University of Chicago / Argonne National Laboratory Internet2 Member.
SMART METER TEXAS Status Update May 5, AGENDA Release 1 Smart Meter Texas Online Portal Update – SMT Solution Update – Registration Statistics –
Coordinating the TeraGrid’s User Interface Areas Dave Hart, Amit Majumdar, Tony Rimovsky, Sergiu Sanielevici.
UFP/CS Update David Hart. Highlights Sept xRAC results POPS Allocations RAT follow-up User News AMIE WebSphere transition Accounting Updates Metrics,
1 PY4 Project Report Summary of incomplete PY4 IPP items.
AGENDA  Objectives  Understand / Identify / Agree to continued dependencies  Review Approach  Projects / Priorities / Schedule (consensus)  Summary.
Presented to: By: Date: Federal Aviation Administration Automating Project Data Submittals Setting Expectations FAA Airports (AEA) Conference Cameron Bryan,
 Advanced Metering Working Group (AMWG) Update to RMS 1 August 5, 2014.
Obtaining Computer Allocations and Monitoring Use SCD User Meeting at AMS January 11, 2005 Ginger Caldwell, SCD.
Integrating Oracle iSupport into Online Customer Service Portal for RMA January 17, 2007 Presented by: Craig Vidal Anant Soni.
Leveraging the InCommon Federation to access the NSF TeraGrid Jim Basney Senior Research Scientist National Center for Supercomputing Applications University.
Presented by: Tony Rimovsky TeraGrid Account Management Tony Rimovsky, Area Director for Network Operations and Security
TeraGrid NOS Turnover Jeff Koerner Q meeting December 8, 2010.
3 rd Party Registration & Account Management SMT Update To AMWG August 26, 2014.
NOS Report Jeff Koerner Feb 10 TG Roundtable. Security-wg In Q a total of 11 user accounts and one login node were compromised. The Security team.
User-Facing Projects Update David Hart, SDSC April 23, 2009.
TeraGrid Institute: Allocation Policies and Best Practices David L. Hart, SDSC June 4, 2007.
Network, Operations and Security Area Tony Rimovsky NOS Area Director
TeraGrid-Wide Operations Von Welch Area Director for Networking, Operations and Security NCSA, University of Illinois April, 2009.
JD Edwards Support & Tools Gillian Boshell Product Service Advisor, Oracle Australia.
Attribute-based Authentication for Gateways Jim Basney Terry Fleury Stuart Martin JP Navarro Tom Scavo Nancy Wilkins-Diehr.
Gateway Security Summit, January 28-30, 2008 Welcome to the Gateway Security Summit Nancy Wilkins-Diehr Science Gateways Area Director.
Preparation for the TeraGrid: Account Synchronization and High Performance Storage Bobby House.
A Vision for Core Services 2.0 Core Services 2.0 WG David L. Hart TG Quarterly Meeting, Dec. 7, 2007.
Gateways security Aashish Sharma Security Engineer National Center for Supercomputing Applications (NCSA) University of Illinois at Urbana-Champaign.
TeraGrid User Portal and Online Presence David Hart, SDSC Area Director, User-Facing Projects and Core Services TeraGrid Annual Review April 6, 2009.
Introducing ART UCSF’s Application, Review and Tracking (ART) System
Accountability & Structured Privacy Management
Quarterly Certification Automation Project
Training Documentation – Replacing GSPR with RFQ 2.0
Introduction for Academic Business Managers
Translational Trials Development and Support Lab
Getting Started with the Grants Portal Grants
Getting Started with the Grants Portal Non-Grants
Chapter 6: Community Features.
DrayWatch Training November 2009.
The Grants Portal: An Overview
ForumPass Familiarization Demonstration
SPR&I Regional Training
Portfolio Management Process & Customer Request Management
iLab Training for VU Departments & Users of VUMC Core Groups
Your Time to Grow! Alpine Technology REGIONAL SEMINAR 2018
Federated Environments and Incident Response: The Worst of Both Worlds
A Grid Authorization Model for Science Gateways
ZTE Customer Request Self-Service Portal Operation Guide V1.0.5
TeraGrid Identity Federation Testbed Update I2MM April 25, 2007
Operational Excellence
About Quick Base Technical notes
OU BATTLECARD: Oracle Systems Learning Subscription
Kerri Briesmiester CTMS Application Manager & OnCore Coordinator
Presentation transcript:

TeraGrid Accounting System Progress and Plans David Hart July 26, 2007

Recent Accounting Activities Server/Software Upgrade (Aug 2006) –New hardware, PostgreSQL upgrade –Test and development instances on prior hardware –Ongoing monitoring NPU processing bottleneck eliminated (Dec 2006) –Troubleshooting, identifying and fixing issue –Solving Purdue Condor job backlog Support for tracking arbitrary job “attributes” (Jan 2007) –Targeting proposed gateway needs Project out-of-funds/expired packets, PI notification (March 2007) –Plus update to provide more info to RPs in RPI packets –Notification in use by NCSA, TG Cluster; Purdue planned –User inactivation (RAI packets) Credits/debits via NPUs (May 2007) –Refunds, reservation charges, storage charges (in SUs), misc. credits/debits TGCDB user “roles” (May 2007) –NPUs can flag user types including “community user”, “PI”, “co-PI”, “allocation manager.” –Other roles can be added. (Perhaps “training user” )

Activities currently underway Job/NPU processing improvements –Simpler TGCDB structure, faster processing, easier error correction –Will also permit improved reporting capabilities –Ready, pending RP action AMIE benchmarking –To identify bottlenecks and improve packet transport performance Supporting ability for users to change contact information via portal GRAM/grid job info –Already supported by TGCDB/AMIE, requires RP action

Ongoing Activities DNs and DN propagation –TGCDB/AMIE components in place, troubleshooting TG-wide compliance Portal support –Miscellaneous requests, including improvements to add user form, portal logins, etc. Support for adding/decommissioning new resources, RPs –NCAR and Frost –Abe, Ranger, Big Ben, storage resources added –Lemieux, Radium, Tiger decommissioned tgusage updates Updated to v2.9 from v2.4 in August 2006 Requested feature to extract per-job details Ongoing support for trouble tickets, error correction –Including backloads of PSC data and PSC/SDSC DACs

Recent POPS Developments Portal login support Supporting grant data collection changes –to comply with NSF policy change New resource types (storage, ASP) and billing units (TBs, Months) Sept: Online proposal status tracking, viewing of reviewer comments –Enhanced admin capabilities to customize award notices and automate notifices to PIs/co-PIs Plans –Context-based help –Go “paperless” for reviewer meeting materials –DAC changes for NSF Graduate Fellows

Planned Activities Storage usage accounting and reporting Near-term updates –New features requested by other TG areas or to reflect policy changes –AMIE optimizations –Streamlining TGCDB procedures and triggers New “Core Services” proposal submitted –To replace current NCSA/SDSC Core-leveraged funding for allocations and accounting-related activities Better integration of and communication between POPS and Allocations activities/staff with TGCDB and Accounting activities/staff

TeraGrid Core Services 2.0 Major focus for next year Multi-site, GIG-funded team for requirements gathering and initial design Top to bottom evaluation and integration of the allocation, authentication, authorization, and accounting system components Seamless interaction between POPS, TGCDB, TGUP, Gateways infrastructure, and Authentication system Eliminate NCSA Sybase from the critical path Automate process to minimize the human effort required Multi-site or site-independent project/user creation