General Overview Grand Calumet River - Remediation / Roxana Marsh - Restoration General Overview Project Objectives & Team Site Map Activity overview.

Slides:



Advertisements
Similar presentations
Soil Erosion.
Advertisements

Dewatering & Coastal Issues H 2 0 & Erosion Control Workshop UCF Stormwater Management Academy March 15-16, 2007 Jim Smoot, PhD, PE Molly Wood, PE U.S.
MICHELLE GERRITS EROSION & SEDIMENT CONTROL SPECIALIST WISDOT Dewatering Technical Standard
UMR = Balance of Environment and Transportation 1. Pool # 8 - Environmental Management Project 2. Transportation Route – human habitation & settlement.
Wastewater Treatment.
Restoration Alternatives Development and Evaluation West Branch Grand Calumet River By Dan Sparks, USFWS, BFO Presented by Jim Smith, IDEM, OLQ.
1 Utilizing Engineered Permeable Reactive Caps To Minimize Re-Suspension Of COC – Post Dredge WEDA Midwest Chapter – Green Bay April 27, 2012 Allen Bullock.
Greenwich Peninsula.
Art Kuljian, P. E. , BCEE, Kevin Olmstead, Ph. D. , P. E
Marine Construction SCM 330 Tyler Mason Pratt Tyler Mason Pratt
Treatment of Slaughterhouse Wastewater
1 Effluent Guidelines for Construction Greg Davis USEPA
DREDGING YOUR DOCKS 2013 Supported by: USACE Galveston District U. S. Coast Guard Sabine Neches Navigation District.
Ross By-Pass Tunnel Cleanup Pre-Bid Project Overview May 2014
Integrated Waterfront Cleanup and Marina Development in Bellingham, WA Tom Wang, P.E. WEDA Pacific Chapter – San Diego 2009.
Fox River Cleanup Overview Project Participants  Responsible Parties (RPs) – NCR– Arjo Wiggins / Appleton Papers Inc. – PH Glatfelter– US Mills.
Fox River Cleanup Operable Units Fox River Cleanup Total river 39 miles long, OU 2 – 5 is about 13 miles PCB contamination Combined Remedy: Prospective.
Presentation to: Technical Advisory Committee Onondaga Lake.
On-Site Leachate Management RM of Tache Pilot Study.
CONSTRUCTION BEST MANAGEMENT PRACTICES (BMPs) CONSTRUCTION GUIDE TO CLEANER WATER Information compliments of: WaterWorks! WaterWorks! Center for Environmental.
Mudboils AEES Pre-Conference Workshop Wednesday, June 6, 2012 Nate Barlet Brandon Winfrey Roy Wood.
Water Resources Report Rob Montgomery River Flow & Lake Levels TMDL Study Floodplain mapping revisions Dredging 101.
Filter Loading and Backwash Rates Well Yields and Chlorine Dosage in Waterworks Operation Math for Water Technology MTH 082 Lecture Chapter 4 & 8- Applied.
Willamette Water Treatment Plant
Grand Calumet River/Indiana Harbor Canal Feasibility Study
Molalla Water Treatment Plant Field Trip 4/24/07 Molalla Water Treatment Plant Field Trip 4/24/07.
Controlling Aquatic Plants. When left uncontrolled, aquatic plants Impair recreational uses Cause foul odors and bad taste to drinking water Cause fish.
 UAB Vilniaus waters - the largest water company in Lithuania, which operates not only in the city of Vilnius, but also the district, Svencionys and.
Sustainability and Best Management Practices Environmental Remediation Russell Downey Pfizer Global Engineering 5 November 2014.
Cleaning up the Hudson Andrew Brown. The Hudson River Official Source- Lake Tear in the Clouds in Adirondack Mountains Official Source- Lake Tear in the.
The Orange County Water District Riverbed Filtration Pilot Project Jason Keller 1, Michael Milczarek 1, Greg Woodside 2, Adam Hutchinson 2, Adam MP Canfield.
Salton Sea Species Conservation Habitat Workshop June 10, 2010.
PIANC Dredging 2012 Conference Castro Cove Sediment Remediation Project, Richmond, California Ian Austin PhD PE - URS Corporation Paul Ryan – Chevron Environmental.
SEWAGE TREATMENT.  Sewage is the mainly liquid waste containing some solids produced by humans, typically consisting of washing water, urine, feces,
TURNING BROWNFIELDS. Definition US EPA 1997 abandoned, idled or under-used industrial and commercial facilities where expansion or redevelopment is complicated.
History and Cleanup at Chemical Commodities, Inc. Jeff Field US EPA Region 7 1.
CHEMICAL COMMODITIES INC. The History, Cleanup and Ecological Reuse of a Superfund Site 1.
© 2015 EarthCon Consultants, Inc. All rights reserved. This material may not be reproduced, displayed, modified or distributed without the express prior.
Chapter 37 Pipeline Construction. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Explain the.
Environmental Dredging of Perfluorochemical-Impacted Sediment from a Sensitive Wetland Mark A. Gaetz (3M) Paul Lear (WRScompass)
Cleanup and Remediation of Persistent Bioaccumulative Toxics in the Great Lakes Basin Gina Bayer, CH2M HILL PBT Strategy Team Maumee Bay Meeting February.
SUCCESSFUL GREAT LAKES DREDGING PROJECTS GOVERNMENT & PRIVATE SECTOR WORKING TOGETHER Joseph HeimbuchRobert Rulede maximis, inc. PIANC USA COPRI ASCE 2012.
Alternative Sediment Remediation Authorities to CERCLA: Elizabeth River Demonstration Robert Engler Moffatt & Nichol),
Where’s My Material? Appropriate Planning for Cap and Habitat Restoration Material Quantities Presented by Paul LaRosa, P.E., John Verduin, P.E., and Ram.
Where it goes when I go ! A look into London’s waste water challenges.
Project Update: Hudson River PCBs Superfund Site October 24, 2012 Mr. David King, PE – USEPA Region 2 Mr. Gary Klawinski – USEPA Region 2 Mr. Mark Surette.
Vessel Wash Wastewater Management – Options for Marinas Presented by: Michael J. Danko New Jersey Sea Grant Consortium Virginia Marine Trades Conference.
Oregon Natural Treatment Systems for Wastewater Natural Treatment Systems – A Water Quality Match for Oregon’s Cities and Towns June, 2014 Oregon Department.
Planning Habitat Restoration for Dredging Projects WEDA Midwest Chapter Conference Green Bay, Wisconsin April 27, 2012 Jack Brunner.
US Army Corps of Engineers BUILDING STRONG ® Mississippi Coastal Improvements Program (MsCIP) “Comprehensive Barrier Island Restoration Plan” PIANC 2012.
Beneficial Reuse of Sand on the Fox River Sediment Remediation Project Neil Geevers (Stuyvesant/Boskalis) Richard J. Feeney, P.E. (Tetra Tech) Terri L.
Cleaning up the Lower Fox River Greg Hill, Wisconsin DNR Winnebago Project University of Wisconsin Oshkosh, May 23, 2008.
MIAMI-DADE COUNTY REGULATORY AND ECONOMIC RESOURCE DEPT. DIVISION OF ENVIRONMENTAL RESOURCE MANAGEMENT (DERM) “THE PERMITTING PROCESS TO DISPOSE OF STORMWATER.
Chapter 16 Landfill Liners and Geosynthetics
Construction Land Disturbance Pollution Control
Upland Landfill Waste Discharge Application 7295 Gold River Highway
Modified Ludzack-Ettinger Wastewater Plant
EFFECTIVE EROSION AND SEDIMENTATION CONTROLS FOR IN-CHANNEL PROJECTS
Jon Risgaard, Wastewater Branch Rick Bolich, Raleigh Regional Office
Flow Equalization Jae K. (Jim) Park Dept. of Civil and Environmental Engineering University of Wisconsin-Madison.
Wastewater Treatment.
What is an on-lot sewage system?
Outline of Presentation
Average person produces 1700 lbs of MSW per year
Wastewater Treatment.
Wastewater Treatment.
Quality Standards Fresh water can contain a variety of harmful substances and organisms. Concentration refers to the amount of substance that is in another.
Wastewater Treatment.
Wastewater Treatment.
Dave Wethington, PE Joanne Milo, PMP
Presentation transcript:

General Overview Grand Calumet River - Remediation / Roxana Marsh - Restoration General Overview Project Objectives & Team Site Map Activity overview Dredging activities - Dredging - Invasive Species Removal - Clearing & Grubbing Capping / cover - Broadcast Spreader -Organoclay Processing Activities - Plant set-up - Dewatering - Water treatment Transport & Disposal - Solidification Marsh Rehabilitation - Excavation -Backfill of Marsh - Herbicide Treatment - Seeding & Planting West Branch of the Grand Calumet River Highly industrialized area – foundries, distillery, chemical plants, steel mills, oil refineries, etc. Located in Hammond & East Chicago, IN Dredging - Reaches 1 & 2 – 1.3 miles stretch  Reach 1 Indianapolis Blvd to I-90 bridge  Reach 2 I-90 bridge to Columbia Ave Bridge Roxana Marsh Restoration River flows East, shallow depth 1.5/2.0’ with 10’ deep pool near HSD upstream

Project Objectives & Team Grand Calumet River - Remediation / Roxana Marsh - Restoration General Overview Project Objectives & Team Site Map Activity overview Dredging activities - Dredging - Invasive Species Removal - Clearing & Grubbing Capping / cover - Broadcast Spreader -Organoclay Processing Activities - Plant set-up - Dewatering - Water treatment Transport & Disposal - Solidification Marsh Rehabilitation - Excavation -Backfill of Marsh - Herbicide Treatment - Seeding & Planting Objectives:  Remove contaminated sediments from marsh and river  Capping river bottom for long-term contaminant barrier  Provide habitat & aesthetic improvements  Restoration of wetlands to enhance recovery of ecological communities Team:  Agencies  GLNPO  SulTRAC – Design and Oversight  IDEM  IDNR  East Chicago Sanitary District  USACE  US Fish & Wildlife  Construction  J.F. Brennan – GC – dredging, wetlands enhancement, capping  Infrastructure Alternatives – dewatering and water treatment  Terra – Roxana Marsh excavation/sand placement, T&D of all sediments  Pizzo – invasive species control, ecological restoration & bank stabilization

Site Map Grand Calumet River - Remediation / Roxana Marsh - Restoration General Overview Project Objectives & Team Site Map Activity overview Dredging activities - Dredging - Invasive Species Removal - Clearing & Grubbing Capping / cover - Broadcast Spreader -Organoclay Processing Activities - Plant set-up - Dewatering - Water treatment Transport & Disposal - Solidification Marsh Rehabilitation - Excavation -Backfill of Marsh - Herbicide Treatment - Seeding & Planting

Activity Overview Hydraulic Removal of 122,750CY - Channel and Wetland Areas 20 acres of Granular Cap placement and 6 acres - Wetland fill placement 2.5 acres of Clear and Grub - Adjacent to the river Geotextile tube Dewatering On-site water treatment – Decant water - Geotextile tubes & Roxana Marsh Offsite T&D of sediment – minimal use of stabilizing agent Mechanical Excavation 110,000 CY – land-based Roxana Marsh Placed 75,000 CY of Fill in the Roxana Marsh Herbicide treatment invasive species control – Roxana Marsh, wetlands & clear and grub areas Seeding and planting - Roxana Mash, wetlands, clear and grub areas, and invasive species control areas Grand Calumet River - Remediation / Roxana Marsh - Restoration General Overview Project Objectives & Team Site Map Activity overview Dredging activities - Dredging - Invasive Species Removal - Clearing & Grubbing Capping / cover - Broadcast Spreader - Organoclay Processing Activities - Plant set-up - Dewatering - Water treatment Transport & Disposal - Solidification Marsh Rehabilitation - Excavation - Backfill of Marsh - Herbicide Treatment - Seeding & Planting

Dredging Activities 2 – 8” Swinging Ladder Hydraulic Dredges 5 SMUs and 7 Wetland Shelves 122,750 CY Removed Debris Removal Shallow Areas Turbidity Monitoring Grand Calumet River - Remediation / Roxana Marsh - Restoration General Overview Project Objectives & Team Site Map Activity overview Dredging activities - Dredging - Invasive Species Removal - Clearing & Grubbing Capping / cover - Broadcast Spreader -Organoclay Processing Activities - Plant set-up - Dewatering - Water treatment Transport & Disposal - Solidification Marsh Rehabilitation - Excavation -Backfill of Marsh - Herbicide Treatment - Seeding & Planting

Invasive Species Removal in Dredge Areas Selected Areas Primary Invasive Species is Phragmites Hydraulic Dredging Sediment Removal Marine Plant to Remove Vegetative Mass Stockpiled in Roxana Marsh Footprint for later disposal at landfill Grand Calumet River - Remediation / Roxana Marsh - Restoration General Overview Project Objectives & Team Site Map Activity overview Dredging activities - Dredging - Invasive Species Removal - Clearing & Grubbing Capping / cover - Broadcast Spreader - Organoclay Processing Activities - Plant set-up - Dewatering - Water treatment Transport & Disposal - Solidification Marsh Rehabilitation - Excavation -Backfill of Marsh - Herbicide Treatment - Seeding & Planting

Clear and Grub Areas Removal from selected areas – 2’ sediment and root mass Equipment and Execution Marooka track trucks Small excavator – no mats 2’ Sand Placement Currently being seeded Grand Calumet River - Remediation / Roxana Marsh - Restoration General Overview Project Objectives & Team Site Map Activity overview Dredging activities - Dredging - Invasive Species Removal - Clearing & Grubbing Capping / cover - Broadcast Spreader -Organoclay Processing Activities - Plant set-up - Dewatering - Water treatment Transport & Disposal - Solidification Marsh Rehabilitation - Excavation -Backfill of Marsh - Herbicide Treatment - Seeding & Planting

Capping / Cover Wetland sand placement of 1.75’ to 3’ – fine fill sand Channel areas required 6” reactive layer – organoclay and fine fill sand Top layer 12” sand and gravel mix Broadcast Spreader System - BCS™ Land Plant Grand Calumet River - Remediation / Roxana Marsh - Restoration General Overview Project Objectives & Team Site Map Activity overview Dredging activities - Dredging - Invasive Species Removal - Clearing & Grubbing Capping / cover - Broadcast Spreader -Organoclay Processing Activities - Plant set-up - Dewatering - Water treatment Transport & Disposal - Solidification Marsh Rehabilitation - Excavation -Backfill of Marsh - Herbicide Treatment - Seeding & Planting

Capping / Cover Broadcast Spreader System - BCS™ Land Plant Spreader Barge Grand Calumet River - Remediation / Roxana Marsh - Restoration General Overview Project Objectives & Team Site Map Activity overview Dredging activities - Dredging - Invasive Species Removal - Clearing & Grubbing Capping / cover - Broadcast Spreader -Organoclay Processing Activities - Plant set-up - Dewatering - Water treatment Transport & Disposal - Solidification Marsh Rehabilitation - Excavation -Backfill of Marsh - Herbicide Treatment - Seeding & Planting

Organoclay for the Absorptive Layer Organoclay – A manufactured substance created by modifying Bentonite with Quaternary Amine resulting in an organophilic material Purpose Required Dosage Placement Grand Calumet River - Remediation / Roxanna Marsh - Restoration General Overview Project Objectives & Team Project summary Site Map Activity overview Dredging activities - Dredging - Invasive Species Removal - Clearing & Grubbing Capping / cover - Broadcast Spreader -Organoclay Processing Activities - Plant set-up - Dewatering - Water treatment Transport & Disposal - Solidification Marsh Rehabilitation - Excavation - Backfill of Marsh - Herbicide Treatment - Seeding & Planting

Sediment Processing Activities Geotextile tubes for dredged material dewatering Geotextile tube filtrate collected in sump Treated on site in temporary pretreatment plant Discharged to sanitary sewer (City of East Chicago, IN) Grand Calumet River - Remediation / Roxana Marsh - Restoration General Overview Project Objectives & Team Project summary Site Map Activity overview Dredging activities - Dredging - Invasive Species Removal - Clearing & Grubbing Capping / cover - Broadcast Spreader -Organoclay Processing Activities - Plant set-up - Dewatering - Water treatment Transport & Disposal - Solidification Marsh Rehabilitation - Excavation - Backfill of Marsh - Herbicide Treatment - Seeding & Planting

Processing Area Design Grand Calumet River - Remediation / Roxana Marsh - Restoration General Overview Project Objectives & Team Project summary Site Map Activity overview Dredging activities - Dredging - Invasive Species Removal - Clearing & Grubbing Capping / cover - Broadcast Spreader -Organoclay Processing Activities - Plant set-up - Dewatering - Water treatment Transport & Disposal - Solidification Marsh Rehabilitation - Excavation - Backfill of Marsh - Herbicide Treatment - Seeding & Planting

Dewatering Pad & Treatment Plant Set-Up Dewatering pad liner: 40 mm HDPE, with 20 oz. geotextile mesh and 1’ of crushed stone overlay 175,000 gal sump to store storm water and geotextile tube filtrate prior to treatment 10” diameter HDPE piping throughout WTP Float controlled, self-priming 2,000 gpm influent pump Skid mounted treatment units (3) Bag filters, in parallel, with  m filters (2) pairs of lead-lag Granular Activated Carbon (GAC) vessels, in parallel, with 20,000 lbs GAC in each vessel Grand Calumet River - Remediation / Roxana Marsh - Restoration General Overview Project Objectives & Team Project summary Site Map Activity overview Dredging activities - Dredging - Invasive Species Removal - Clearing & Grubbing Capping / cover - Broadcast Spreader -Organoclay Processing Activities - Plant set-up - Dewatering - Water treatment Transport & Disposal - Solidification Marsh Rehabilitation - Excavation - Backfill of Marsh - Herbicide Treatment - Seeding & Planting

Pad Construction and Equipment Installation Grand Calumet River - Remediation / Roxana Marsh - Restoration General Overview Project Objectives & Team Project summary Site Map Activity overview Dredging activities - Dredging - Invasive Species Removal - Clearing & Grubbing Capping / cover - Broadcast Spreader -Organoclay Processing Activities - Plant set-up - Dewatering - Water treatment Transport & Disposal - Solidification Marsh Rehabilitation - Excavation - Backfill of Marsh - Herbicide Treatment - Seeding & Planting

Geotextile Tube Dewatering IAI designed 465’ x 280’ dewatering pad Project total design dredge volume: 126,000 yd 3 Pad capacity 10,000 – 15,000 yd 3 Active filling of geotextile tubes at one end, with haul- out at other end Pad “flipped” (rotated) 9 times during project 200’ long by 75’ circumference tubes utilized Flow polymer feed system Average 15 days of dewatering (from first day of active filling to first day of haul-out) for each tube Grand Calumet River - Remediation / Roxana Marsh - Restoration General Overview Project Objectives & Team Project summary Site Map Activity overview Dredging activities - Dredging - Invasive Species Removal - Clearing & Grubbing Capping / cover - Broadcast Spreader -Organoclay Processing Activities - Plant set-up - Dewatering - Water treatment Transport & Disposal - Solidification Marsh Rehabilitation - Excavation - Backfill of Marsh - Herbicide Treatment - Seeding & Planting

Geotextile Tube Dewatering Grand Calumet River - Remediation / Roxana Marsh - Restoration General Overview Project Objectives & Team Project summary Site Map Activity overview Dredging activities - Dredging - Invasive Species Removal - Clearing & Grubbing Capping / cover - Broadcast Spreader -Organoclay Processing Activities - Plant set-up - Dewatering - Water treatment Transport & Disposal - Solidification Marsh Rehabilitation - Excavation - Backfill of Marsh - Herbicide Treatment - Seeding & Planting

Water Treatment Pretreatment plant design capacity 2000 gpm Discharge to sanitary sewer under Industrial Pretreatment Program (IPP) permit IPP permit faster, easier to obtain than NDPES discharge permit 24-hour effluent composite sampling Prove-in monitoring (1 st week, daily samples collected with 24 hour turnaround on analysis from lab; weekly samples thereafter) Analytical data electronically delivered to City directly from lab Monthly flow reporting Discharge fees paid to the City were based on effluent flow volume Grand Calumet River - Remediation / Roxana Marsh - Restoration General Overview Project Objectives & Team Project summary Site Map Activity overview Dredging activities - Dredging - Invasive Species Removal - Clearing & Grubbing Capping / cover - Broadcast Spreader -Organoclay Processing Activities - Plant set-up - Dewatering - Water treatment Transport & Disposal - Solidification Marsh Rehabilitation - Excavation - Backfill of Marsh - Herbicide Treatment - Seeding & Planting

Water Treatment Grand Calumet River - Remediation / Roxana Marsh - Restoration General Overview Project Objectives & Team Project summary Site Map Activity overview Dredging activities - Dredging - Invasive Species Removal - Clearing & Grubbing Capping / cover - Broadcast Spreader -Organoclay Processing Activities - Plant set-up - Dewatering - Water treatment Transport & Disposal - Solidification Marsh Rehabilitation - Excavation - Backfill of Marsh - Herbicide Treatment - Seeding & Planting

Grand Calumet River - Remediation / Roxana Marsh - Restoration General Overview Project Objectives & Team Site Map Activity overview Dredging activities - Dredging - Invasive Species Removal - Clearing & Grubbing Capping / cover - Broadcast Spreader -Organoclay Processing Activities - Plant set-up - Dewatering - Water treatment Transport & Disposal - Solidification Marsh Rehabilitation - Excavation - Backfill of Marsh - Herbicide Treatment - Seeding & Planting Transport & Disposal - Solidification Minimal use of stabilizing agent = LKD Three load out areas CA1 - marsh CA2 - marsh CA5 – bag field 232,750 CY sent to five landfills

Grand Calumet River - Remediation / Roxana Marsh - Restoration General Overview Project Objectives & Team Site Map Activity overview Dredging activities - Dredging - Invasive Species Removal - Clearing & Grubbing Capping / cover - Broadcast Spreader -Organoclay Processing Activities - Plant set-up - Dewatering - Water treatment Transport & Disposal - Solidification Marsh Rehabilitation - Excavation -Backfill of Marsh - Herbicide Treatment - Seeding & Planting Marsh Rehabilitation - Excavation Composite Mat roads used in the marsh One PC300HD long-reach excavator equipped with GPS Three 15 CY articulating dump trucks 14 psi ground pressure when loaded, delivering material to load out pad 110,000 CY

Grand Calumet River - Remediation / Roxana Marsh - Restoration General Overview Project Objectives & Team Site Map Activity overview Dredging activities - Dredging - Invasive Species Removal - Clearing & Grubbing Capping / cover - Broadcast Spreader -Organoclay Processing Activities - Plant set-up - Dewatering - Water treatment Transport & Disposal - Solidification Marsh Rehabilitation - Excavation -Backfill of Marsh - Herbicide Treatment - Seeding & Planting Marsh Rehabilitation – Backfill of Marsh Two dozers D61 equipped with GPS D51 Articulating dump trucks delivering material 75,000 CY

Grand Calumet River - Remediation / Roxana Marsh - Restoration General Overview Project Objectives & Team Site Map Activity overview Dredging activities - Dredging - Invasive Species Removal - Clearing & Grubbing Capping / cover - Broadcast Spreader -Organoclay Processing Activities - Plant set-up - Dewatering - Water treatment Transport & Disposal - Solidification Marsh Rehabilitation - Excavation -Backfill of Marsh - Herbicide Treatment - Seeding & Planting Marsh Rehabilitation– Herbicide Treatment Primary invasive target- Phragmites Herbicide applied late Summer 2011 Applied via ATV and air boat power sprayers Phragmites was mowed after treatment 12 acres treated and mowed in 2011 – track skid steer

Grand Calumet River - Remediation / Roxana Marsh - Restoration General Overview Project Objectives & Team Site Map Activity overview Dredging activities - Dredging - Invasive Species Removal - Clearing & Grubbing Capping / cover - Broadcast Spreader -Organoclay Processing Activities - Plant set-up - Dewatering - Water treatment Transport & Disposal - Solidification Marsh Rehabilitation - Excavation -Backfill of Marsh - Herbicide Treatment - Seeding & Planting Marsh Rehabilitation– Seeding & Planting Seeding & Planting Scheduled for June 2012 Native wetland species of seed & plugs Restored areas will create quality wetland habitat Invasive control will continue for 1 year 30+ acres native seed, 15,000 plugs

QUESTIONS ?