Logo area MQXF Review: Safety Thomas Otto HL-LHC Project Safety Officer International Review of the Inner Triplet Quadrupoles (MQXF) for HL-LHC.

Slides:



Advertisements
Similar presentations
Health and Safety Committees RENZO BERTOLINI Canadian Centre for Occupational Health and Safety.
Advertisements

2 3 There are two basic areas where there is a need to have resources available. Internal:  Financial  Personnel  Assets  Time External  Consultants.
Safety and Health Management Program
Health and Safety - an update Ian Gillett Safety Director.
SIEP HSE Management System
1 NOTES This presentation is an outline of some of the most important aspects of DOE O 440.1B For completeness, copies of the Order should accompany this.
TUTORIAL Grant Preparation & Project Management. Grant preparation What are the procedures during the grant preparations?  The coordinator - on behalf.
Safety Management of the LIU Project A. Funken Anne Funken, LIU PT 21/05/15.
SHE Code 26: Safe use of Lifting Equipment and Lifting Accessories Safety, Health and Environment (SHE) Group.
Safety & Safety Documentation 2 3 Safety in three Questions Why ? Providing a safe workplace is a legal and moral obligation on every undertaking, and.
1 CHCOHS312A Follow safety procedures for direct care work.
17 July 2002RSOC presentation G.D. 1 NEW SAFETY CODE A9 Origin –Revision of SAPOCO 42 document Main modifications: –Official name becomes SAFETY POLICY.
Ship Recycling Facility Management System IMO Guideline A.962
Laboratory Biorisk Management Standard CWA 15793:2008
Occupational Health and Safety
André Henriques DGS/SEE LIU-PSB OOSTER. HSE S AFETY C ORRESPONDENT 13 TH S EPTEMBER 2012 September 2012.
Basics of OHSAS Occupational Health & Safety Management System
Copyright  2005 McGraw-Hill Australia Pty Ltd PPTs t/a Human Resource Management in Australia 2e by De Cieri, Kramar, Noe, Hollenbeck, Gerhart & Wright.
SHEPPARD ROBSON IN-HOUSE TRAINING TECHNICAL SEMINAR The Construction (Design & Management) Regulations CDM.
Adverse Event Management from the HSE perspective E. Cennini / DGS-SEE EDMS Id Adverse events Workshop Creating a common understanding.
John Robert Etheridge, TS/HDO, Health and Safety Coordinator for the installation of the LHC and its Experiments Enviromental Health and Safety – managing.
Safety organization and training. The biosafety officer and biosafety committee A safety policy, A safety manual, and Supporting programmes for their.
Risk Management NDS Forum June 23 rd Example safety objective Objective 1: To protect the health, safety & welfare of employees and people at our.
Evaluation Plan New Jobs “How to Get New Jobs? Innovative Guidance and Counselling 2 nd Meeting Liverpool | 3 – 4 February L Research Institute Roula.
1 EARLY SAFETY MANAGEMENT OF PROJECTS AND EXPERIMENTS HSE UNIT PH DSO EDMS No
RSSO refresher meeting J. Pedersen M. Tavlet, T. Otto.
Workshop on Implementing Audit Quality Practices Working Group on Audit Manuals and Methods March 2006 Vilnius (Lithuania) Hungarian Experiences.
Responsible Care® Health & Safety Task Force – 06 H&S.
HSE-LSA HSE procedure foresees a Launch Safety Agreement for all new project –this is since several year made systematically for all new projects. The.
PRODUCT STEWARDSHIP Code of Practice GCWellon June 2010.
The new approach to the CERN Safety Policy and Safety Organisation A. Goehring-Crinon & R. Trant.
LS2 Safety Thomas Otto, LS2 Safety Coordinator.
Guidelines for the Organization of Practical Placements for Students (PPS) Code of Practice for Actors Gregory Makrides – European Association of Erasmus.
19/11/2015 PSB and PS&TT2 Facilities YETS L. Kobzeva.
Last but not least : LS2 General Safety 1 Thomas Otto, LS2 Safety Coordinator for LHC Ana-Paula Bernardes, LS2 Safety Coordinator for Injectors.
Safety Documentation Formerly an exotic unknown, today part of the work!
Standards for Technical Educators Occupational Safety & Health.
Copyright  2004 McGraw-Hill Australia Pty Ltd PPTs t/a Occupational Health and Safety by Margaret Stewart and Frank Heyes Slides prepared by Frank Heyes.
Health and Safety Refresher Training
28 th January LHC Performance Workshop Session 8: (E)YETS and Long Shutdown 2 Strategy and Preparation. General.
Being TSO at CERN Safety at CERN2 Being TSO at CERN – Safety at CERN Safety – what is it ? Safety Policy Safety responsibilities Organisational structure.
Learn Integrated Management System Documentation Process with Ready-to-use EQHSMS Documentation Kit
Engineering Environment Awareness
Logo area 11 T Review: Safety and Codes Thomas Otto HL-LHC Project Safety Officer With contributions by -Frédéric Savary, Hervé Prin, TE-MSC -Carlos Arregui,
Dipl.-Ing. Ogün Uykun TAIEX WORKSHOP - ANKARA
Logo area MQXF Review: Safety Thomas Otto HL-LHC Project Safety Officer With contributions by -Paolo Ferrcin and Ezio Todesco, TE-MSC -Francesca Viggiano,
Logo area Compliance with CERN Safety Rules – Role of CERN Health, Safety & Environment protection (HSE) Unit C. Arregui, S. Marsh (HSE-SEE) International.
SHE Requirements Clarification Meeting Date:17 November 2014 Compiled: Nompumelelo Kaule.
LS2 Safety Preparation Thomas Otto, LS2 Safety Support Officer for LHC
Cryogenic safety organisation at CERN
Being TSO at CERN Safety at CERN Being TSO at CERN Safety at CERN.
East Area Renovation Project Team meeting # 2 – EDMS News
Strategy for conformity of non-standard cryogenic equipment
Safety Documentation EHN1
Safety in Construction and Upgrade Phases
HSE rules & regulations
Safety for the FCC Conceptual Design Report
East Area Renovation Project team #6 Launch safety agreement
Safety Accountabilities
EP Experiments safety validation process Safety Permits
Thomas Otto, TE Department, CERN
HL-LHC Safety Assessment Process
OHS Staff Introduction Training
Radiation protection organisation
ISO management systems
Safety and Regulatory Guidelines In the Medical Laboratory
Ian Evans SSRL Safety Office
ESS Handbook for Radiation Protection
Health and safety at work in the EU
Presentation transcript:

logo area MQXF Review: Safety Thomas Otto HL-LHC Project Safety Officer International Review of the Inner Triplet Quadrupoles (MQXF) for HL-LHC

logo area Contents  CERN Safety Policy  HL-LHC Safety Organisation  HL-LHC Safety Process  Launch Safety Agreement  Pressure Equipment Directive  Next Steps Thomas Otto, HL-LHC Project Safety Officer, MQXF Review,

logo area CERN Safety Policy Excellence in matters of Safety Objectives:  to ensure the best possible protection in health and safety matters of all persons participating in the Organization’s activities as well as of the population living in the vicinity;  to limit the impact of the Organization’s activities on the environment, and  to guarantee the use of best practice in matters of Safety. Thomas Otto, HL-LHC Project Safety Officer, MQXF Review,

logo area Implementation principles  Organic units are responsible for implementing the Safety policy  HSE unit has the role of providing assistance and independent control  Specialised units have specific tasks (Medical Service, Fire Brigade …)  Establishment of a Safety Management System CERN Safety Policy Excellence in matters of Safety Thomas Otto, HL-LHC Project Safety Officer, MQXF Review,

logo area Who is in Charge of Safety ? Means Hierarchical Line Consulting Rules / Advice/ Control Thomas Otto, HL-LHC Project Safety Officer, MQXF Review,

logo area CERN Safety Rules 1.Grant a high level of Safety (European practice in occupational Safety) 2.Take account of the intergovernmental status of the Organization. 3.CERN Safety rules are based on regulations, directives and standards of the European Union, if they exist and are deemed applicable to CERN. 4.For cases not covered by CERN Safety Rules, the regulation applicable in the competent Host State is used. Thomas Otto, HL-LHC Project Safety Officer, MQXF Review,

logo area Two aspects of Safety ConformityPreventive Workplace Safety EquipmentProcess Standards (ISO, EN, Eur. Dir….)Safety Rules, best practice InspectionHazard identification, risk assessment Report on non-conformitiesSafety Report, action list Make conformApply rules and best practice Conformity marking User manualProcedure manual Training in use of equipmentTraining the process Safety Training Personal Protective Equipment 7 Thomas Otto, HL-LHC Project Safety Officer, MQXF Review,

logo area Equipment Conformity Issues  Project and HSE unit draw up Hazard Register for the equipment  HSE unit produces “Launch Safety Agreement”  Compulsory list of applicable rules, codes and standards  Deliverables required for Safety Clearance by HSE Thomas Otto, HL-LHC Project Safety Officer, MQXF Review,

logo area HL-LHC Safety Process Equipment Conformity  Hazard Identification of operation of the finished equipment  Launch Safety Agreement, fixing Safety requirements  Design, production, testing  Collect documents for a “Safety File”  Safety Clearance by HSE unit  Install and operate Workplace Safety  Hazard Identification of the production process  Laboratories, Workshops  Production facilities  Test facilities  Workplace Risk Assessment with Action List for Supervisors  Act on recommendations  Produce, test, repair items Thomas Otto, HL-LHC Project Safety Officer, MQXF Review,

logo area Safety Files for TE Buildings  Identification of priority buildings (next slide)  Safety File consists of  Descriptive Part: description of Building and major processes  Workplace Analysis, for each process, describing hazards, risks, applicable safety rules and Safety Action Plan  Descriptive part approved by DH and GLs  Workplace analysis approved by SL and GL Thomas Otto, HL-LHC Project Safety Officer, MQXF Review,

logo area Organisation of Safety File BuildingProcess subprocess Thomas Otto, HL-LHC Project Safety Officer, MQXF Review,

logo area Workplace Safety Assessment Process Identification Thomas Otto, HL-LHC Project Safety Officer, MQXF Review,

logo area Workplace Safety Assessment Subprocess analysis Thomas Otto, HL-LHC Project Safety Officer, MQXF Review, Observations 13

logo area Workplace Safety Assessment Action List Thomas Otto, HL-LHC Project Safety Officer, MQXF Review,

logo area Workplace Safety Assessment Status for HL-LHC Magnet WPs BuildingPurposeStatus 163s.c. cable testingUnder approval 103s.c. cable productionIn work 101 / 911Polymer laboratoryIn work 183Support WorkshopUnder approval 927Model ProductionIn work 180Prototype ProductionUnder review SMI-2Cryostating SM-18Magnet testingReleased Thomas Otto, HL-LHC Project Safety Officer, MQXF Review,

logo area Summary  The HL-LHC Project and the CERN HSE unit have established a Safety Process for  Conformity with Safety Standards  Safe workplaces at CERN  The process is (hopefully) made transparent by  Requirement documents (LSA)  Specific linkpersons (PSO, HSE correpondents and experts)  Integration of Safety in the project structure Thomas Otto, HL-LHC Project Safety Officer, MQXF Review,

logo area Thank you for your Attention Thomas Otto, HL-LHC Project Safety Officer, MQXF Review,