PANDA, GSI, 03.12.2010 Electrically Cooled Ge-Detectors development Status Report I. Kojouharov.

Slides:



Advertisements
Similar presentations
CIEMAT technological contributions to linear colliders Fernando ToralGandía, 3/12/2005.
Advertisements

Chubaka Producciones Presenta :.
Results on Test Cryostats and The AGATA Asym. Triple: Status of Cryostat Production AGATA Detector Group Meeting, IKP Cologne March 16th, 2006.
2012 JANUARY Sun Mon Tue Wed Thu Fri Sat
P Pathophysiology Calendar. SundayMondayTuesdayWednesdayThursdayFridaySaturday January 2012.
For more information, please contact 19/11/2010 EN/CV/DC Chiller design and purchase by Elena Perez Rodriguez.
J A Hill – EID RAL 1-2 September EE End Cap Mechanical Design ECAL EE End Cap Engineering CMS-UK Collaboration Meeting Brunel University September.
WORD JUMBLE. Months of the year Word in jumbled form e r r f b u y a Word in jumbled form e r r f b u y a february Click for the answer Next Question.
DATE POWER 2 INCOME JANUARY 100member X 25.00P2, FEBRUARY 200member X 25.00P5, MARCH 400member X 25.00P10, APRIL 800member.
2011 Calendar Important Dates/Events/Homework. SunSatFriThursWedTuesMon January
SunSatFriThursWedTuesMon January
July 2007 SundayMondayTuesdayWednesdayThursdayFridaySaturday
ENGINEERING SUPPORT FOR FINAL YEAR PROJECT STUDENTS. SCHOOL OF ENGINEERING.
DEGAS – the HPGe array spectrometer for NUSTAR I. Kojouharov, GSI, Darmstadt Workshop “Detectors for FAI R”, 2016, February 19-20, Puri, India.
EuCARD-WP7-HFM meeting 15 November 2011 Status of construction of FRESCA2 dummy coil assembly Attilio Milanese, Juan Carlos Perez.
Teleconf ACS – FREIA 28th March 2017
Teleconf ACS – FREIA 13th March 2017
Status of the PANDA Solenoid Magnet Production in BINP
CSP 25th November 2010 Technical agreement number 3: overview
End-cap Mechanics FDR Overview of the Project
Status of design and production of LEP connection cryostat
PANDA Yoke of the Magnet
Complementary ISTC Projects #3888, 3889p
BINP, Sergey Pivovarov, Panda magnet meeting at GSl, June 07, 2016
PANDA Collaboration Meeting , BINP Sergey Pivovarov.
Teleconference ACS – FREIA 17th October 2017
Teleconference ACS – FREIA 31st October 2017
FY16 Budget Build (Banner)
MICE Coupling Coil Update
Dictation practice 2nd Form Ms. Micaela-Ms. Verónica.
TIMELINES PHOTOS This is an example text
TIMELINES PHOTOS This is an example text
McDonald’s Kalender 2009.
McDonald’s Kalender 2009.
Teleconference ACS – FREIA 20th February 2018
HIE-LINAC status report
Potential Milestones A timeline to finish in one year
Timelines – 12 Months (years)
1   1.テキストの入れ替え テキストを自由に入れ替えることができます。 フチなし全面印刷がおすすめです。 印刷のポイント.
January MON TUE WED THU FRI SAT SUN
January MON TUE WED THU FRI SAT SUN
Planning Process Strategic Plan Operational Priorities
HPGe Planar Detector Stack
McDonald’s Kalender 2009.
January MON TUE WED THU FRI SAT SUN
Problem Gambling Clicks to Opgr.org
2300 (11PM) September 21 Blue line is meridian..
Updated concept of the CBM dipole magnet
McDonald’s calendar 2007.
1 - January - Sun Mon The Wed Thu Fri Sat
Status of the PANDA Solenoid Magnet Production in BINP
Teacher name August phone: Enter text here.
NUSTAR Annual Meeting, 2018, GSI
JANUARY 1 Sun Mon Tue Wed Thu Fri Sat
Circle Chart Template Process Name.
JANUARY 1 Sun Mon Tue Wed Thu Fri Sat
February 2007 Note: Source:.
as a prototype for Super c-tau factory
MONTHS OF THE YEAR January February April March June May July August
Budker Institute of Nuclear Physics,
Teleconference ACS – FREIA 19th June 2017
JANUARY 1 Sun Mon Tue Wed Thu Fri Sat
McDonald’s calendar 2007.
PANDA Cryostat and Yoke
UPPSALA UNIVERSITY_GERSEMI PROJECT
Habitat Changes and Fish Migration
2015 January February March April May June July August September
Habitat Changes and Fish Migration
Temperature Distribution Study of Composite Germanium Detector
Presentation transcript:

PANDA, GSI, Electrically Cooled Ge-Detectors development Status Report I. Kojouharov

PANDA, GSI, Status of the development of the Single Capsule Cryostat I. Kojouharov The Single Capsule Cryostat The single Capsule cryostat design status: - Conceptual design with single capsule is further elaborated. ◊ - The thermal processes with real components were simulated in order to minimize the thermal leaks and to achieve better cooling. Certain solutions were approved. ◊ -The mechanical design was modified in order to improve the performance ◊ - The X-Cooler II cooling engine is purchased and is tested, performs fine with PopTop capsule ◊ - The mechanical components for the cryostat are to be sent for processing until the end of the Year -... X-Cooler II Electrically Cooled Ge- Detectors development Timeline: - End of December Placing order for processing of the mechanical components for the Single Capsule Cryostat - February Assembly and test of the Single Capsule Cryostat. Delivery is foreseen end of February. Courtesy of J.Kojouharova

PANDA, GSI, Electrically Cooled Ge- Detectors development Status of the development of the Capsule I. Kojouharov The capsule mechanics, T.Engert The crystal mechanical processing test - dummy Ge(Li), Nov.2010, T.Engert The Capsule design status: - Capsule conceptual design is done, patent is pending ◊ - HPGe crystal is purchased ◊ -The mechanics manufactured ◊ - Test with dummy Ge(Li) crystal is done in order to evaluate the quality and the safety of the processing. Another test with different fixing is coming ◊ -... Timeline: - January 2011 – Another test with different crystal holding. - February 2011 – Processing of the inner hole. - March 2011 – Lithium diffusion. - Mai 2011 – Final shape processing. - June 2011 – Implantation and passivation. - September 2011 – Test without welding. - October 2011 – welding and conditioning. - End 2011 – test Problems:- Mechanical processing capability – we do not have sufficient priority to have it at GSI, search for outsourcing. - Uncertainty for the contacting processes timeline. - Uncertainty for encapsulation processes timeline. The crystal geometry

PANDA, GSI, Status of the development of the triple cryostat I. Kojouharov Electrically Cooled Ge- Detectors development The HyperTriple Detector – the design concept The cold frame with 3 capsule models Thermal Shield Cryostat Cup Problems: – Mechanical processing capability – we do not have sufficient priority to have it at GSI, search for outsourcing. We use the same machine for HPGe processing and for complex metal shapes processing. – The design was postponed due to priority given to other projects and – The design was postponed due to priority given to other projects and unexpected functional problems with the Single Capsule Cryostat (electrically cooled).

PANDA, GSI, I. Kojouharov Electrically Cooled Ge- Detectors development Thank you