BUCKET BRIGADES An Approach to Autonomous Work Allocation in Flow Production Systems (Reading No. 7 in poly-copy) Also INDEX snippet on course site.

Slides:



Advertisements
Similar presentations
Operations Scheduling
Advertisements

WAREHOUSING MANAGEMENT
WAREHOUSING MANAGEMENT
Process Design and Analysis
Warehouse Zoning & Bucket Brigades
11–1. 11–2 Chapter Eleven Copyright © 2014 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Lean Supply Chains Chapter Fourteen McGraw-Hill/Irwin
THE CONTEXT OF LOGISTICS. Cycle of Supply and Demand Customers Other Inputs Other Outputs Operations Demand for Products Supply of Products passed to.
©2008 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved. This material is protected under all copyright laws as they currently exist.
Just-In-Time “Eliminate Waste”.
Automated Production Lines
Lean and Sustainable Supply Chains. 1. Describe how Green and Lean can complement each other. 2. Explain how a production pull system works. 3. Understand.
Product layout Assembly-line balancing approach. 2 Facility layout Process terminology Cycle time: Average time between completions of successive units.
Just-in-Time (JIT) and Lean Systems Chapter 7. MGMT 326 Foundations of Operations Introduction Strategy Quality Assurance Facilities Planning & Control.
Chapter 3 Supply Chain Drivers and Obstacles
Chapter 3 Storage Systems
Specification section 3.1
Horizontal Carousel System “Good” carousel stock is typically a subset of the SKUs that have medium velocity They are called for often enough to make automatic.
Slides 6 Distribution Strategies
Inventory Fundamentals
COPYRIGHT © 2008 Thomson South-Western, a part of The Thomson Corporation. Thomson, the Star logo, and South-Western are trademarks used herein under license.
Managing Processes and Capabilities CHAPTER THREE.
© Wiley 2007 Chapter 10 Facility Layout. © Wiley 2007 OUTLINE What Is Layout Planning? Types of Layouts Designing Process Layouts Special Cases of Process.
Chapter 8: Storage and Handling
Process Characteristics
MH...CH LECT-021 SYSTEMS CONCEPT Adopting a materials handling systems from overall optimization point of view. Adopting a materials handling systems.
McGraw-Hill/Irwin Copyright © 2013 by The McGraw-Hill Companies, Inc. All rights reserved. Lean Supply Chains Chapter 12.
Part 3.
Logistics/Supply Chain Costing Prof. Costas Panou Lecture #5 in M.Sc New Technologies in Shipping and Transportation.
Applying Lean Principles in Warehouse Operations
Production Planning.  What to produce  When to produce  How to produce.
BIA 674 supply chain analytics Lecture 2b
SUPPLY.
Best Practices Consortium
LESSON 2 Push and Pull Systems
Chapter 16: Global Sourcing and Procurement
Managing Waiting Lines & Queuing Systems
Introduction to the Theory of Constraints (TOC) & Critical Chain Project Management (CCPM) Major Mark McNabb.
Supply Chain Management
IENG 451 / 452 Just In Time Processes: Cells, Stores, Kanban, Demand
Distribution Strategies
Chapter 3 Supply Chain Drivers and Obstacles
Material handling Defined as the art and science of moving, packing and storing of substances in any form. Creation of time and place utility Movement.
Common Learning Blocks
Modeling and Simulation (An Introduction)
AS/RS (Automated Storage/Retrieval System)
Process Design and Analysis
CHAPTER 8 Operations Scheduling
Management Information Systems
“GARMENT PRODUCTION SYSTEM”
4.3 Increasing efficiency and productivity
Herbie – An Introduction to WiP Limits
SUPPLY.
Chapter 3 Supply Chain Drivers and Obstacles
Apparel management & quality control
Fulfilling omni-channel demand Designing a Distribution Network
Material Requirements Planning (MRP)
World-Views of Simulation
Chapter 3 Supply Chain Drivers and Metrics
Swarm Intelligence: Bucket Brigade Assembly Lines
BUSINESS COMMUNICATION SKILLS PRESENTATION SKILLS OF THESIS & PROJECT
National Stores Committee
Memory management Explain how memory is managed in a typical modern computer system (virtual memory, paging and segmentation should be described.
Process Selection and Facility Layout Lecture 5. Forecasting Product and Service Design Technological Change Capacity Planning Process Selection Facilities.
Chapter 3 Supply Chain Drivers and Obstacles
2 Disks and Things.
L Maximizing Resources: Applying Lean Six Sigma Principles to Your Print Operation Monday March 18, AM – 12 PM.
Flexible Assembly Systems
GATORADE MX Production
Chapter 5 Process Analysis.
Presentation transcript:

BUCKET BRIGADES An Approach to Autonomous Work Allocation in Flow Production Systems (Reading No. 7 in poly-copy) Also INDEX snippet on course site

Conventional Approach (Order Picking) Products Order #xyz 2 blue jeans 3 red hats 1 green shirt Order/product flow Completed orders Customer order “Zone picking”

Conventional Approach (Order Picking) Order/product flow Products Order #abc 10 green shirts 4 yellow ties Completed orders Customer order “Zone picking”

Bucket Brigades Order/product flow Products Completed orders Customer order In bucket brigades, there are no zones. Individuals continue to add to an order until it is taken off them Order #xyz 2 blue jeans 3 red hats 1 green shirt Meet and handoff

Bucket Brigades Order/product flow Products Completed orders Customer order In bucket brigades, there are no zones. Individuals continue to add to an order until it is taken off them Order #xyz 2 blue jeans 3 red hats 1 green shirt

Bucket Brigades Order/product flow Products Completed orders Customer order In bucket brigades, there are no zones. Individuals continue to add to an order until it is taken off them Meet and handoff Order #abc 10 green shirts 4 yellow ties

Bucket Brigades Order/product flow Products Completed orders Customer order In bucket brigades, there are no zones. Individuals continue to add to an order until it is taken off them Order #abc 10 green shirts 4 yellow ties

Product flows down line in overall progression Usually more stations/ workplaces than workers, who move to where the work is to be performed Each worker takes product towards completion along the line, and when last worker finishes product: – Despatches it and walks back to take-over work from immediate upstream worker, – who in turn goes back to preceding worker, and so on Works as a continuous looping relay with both ways movement for baton pass How Do Bucket Brigades Work? Middle of page 2 in reading

How Bucket Brigades Work: A Simple Animation

Work mostly comprises variations on a few/ simple skills, and is spread along the line Easy/ fast movement between stations Easy/ fast take-over of work between workers Stations are inexpensive w.r.t. labour costs Preferred sequence Slowest-Fastest No passing, alteration of worker sequence, or accumulation of buffer WIP permitted Assumptions/ When Appropriate Middle of page 7 (& 2) in reading

Inspirations from Natural Systems “Models of organization that are based on living systems are naturally organic and adaptive.” Most biological systems do not forecast or schedule: They respond — quickly, robustly, and adaptively The Conceptual Difference: Rather than trying to control the system, Design the system so that it controls and adapts itself.

Nectar Collection in Honey Bees ForagersReceivers May split load up to 6 times!

If waiting time is long: recruit more receivers If waiting time is short: recruit more foragers If waiting time is intermediate : do nothing No need to know details about: – supply and demand – rate of arrival – number of other bees queueing But can track a fluctuating and unpredictable environment Work Organization Simple individual level rule (whose?):

Food Foraging & Transport in Ants NestFood

Bucket Brigades Order/product flow Products Completed orders Customer order NestFood

Several Toyota subsidiaries/ suppliers (>100) since 1970’s; outside Japan since 1989 Toyota Sewn products System (TSS) developed by Aisin Seiki for seat-covers – Each worker takes over sewing of predecessor’s item – Usually based on standard workers with possibly varying processing requirements at different stations Champion Products for sewing Couch Leatherware for sewing Manufacturing Applications: Apparel/ Upholstery

TSS Snapshot

U-shape to reduce walking/ improve communication Work (sewing) done standing up at waist-chest high stations Number of workers generally preferable < 12: – Ex.: 2 workers making T-shirts (2.5’ work content) – Ex.: 16 workers making Leather covers (190’ work content) Reset times (returning to all-forward movement) as low as 3-10 secs. in a 3-worker/ 13 station line with 7’ work content Sometimes a little work squeezed in during walk-back too Layout & Configuration Aspects

Mitsubishi Consumer Electronics America for TV assembly, Cell-phone packing United Technologies Automotive for automotive harnesses Tug Manufacturing for assembly of airport tractors Subway for sandwich assembly (at 13,000 franchisees) Manufacturing Applications: Simple Assembly Jobs

Single most fertile area, involving much walking/ picking but less dexterity For high-volume Distribution Centres (DC’s) – Orders arrive at beginning of aisle of multiple rows of flow racks – Pickers pick items from a segment of rack along conveyor, adding until next person takes over Order variations, load fluctuations etc.: difficult to plan/ balance statically Warehousing Applications: Order Picking in Distribution

Warehouse Pick Line Snapshot

McGraw Hill DC’s Time-Warner Trader Publishing/ Little-Brown Bantam Double Day-Dell Distribution Reader’s Digest (8% rate increase, 35% error reduction) The Gap DC’s serving Old Navy, The Gap & Banana Republic Stores (throughput up 25%) Revco Drug Stores (now CVS) in national DC’s Warehousing Application Examples

Less need for detailed time study, pre-planning and accurate balancing Simple, identical protocol which still enjoys repetitiveness benefits Only limited multi-skilling needed (neighbours) Pull system: limited WIP but can cope with changes Manual handling often sufficient Consistent with other contemporary small-group based Operations approaches Potential Benefits

From polycopy reading no. 7 (Section 2.1 and Appendix B) Each worker (i = 1…n) is characterized by a work rate, based on the amount of time required by that worker to complete one full unit, and a (relative) work velocity v i w.r.t. a “standard” worker Workers are arranged slowest to fastest To calculate aggregate production rates and steady-state “operating zones” Quantitative Analysis of Bucket Brigade Lines

Dropping off work in buffer if station busy – Workers keep circling pre-bottleneck => fewer available to clear bottleneck and post-bottleneck – When worker leaves bottleneck station, fresh worker may not be available => bottleneck idle – Need to plan number of workers more rigorously, defeats self-planning objective – Can only protect by buffering worker/station too Possible Improvements?

Workers circling around in order to reduce hand- off delay – If workers speeds are not same, all workers will accumulate behind slowest worker (no-passing case) – If passing allowed, faster workers protected but slower workers may need to wait for stations to get free => workers not used fully – Also less learning benefits, since performing entire set of tasks rather than in own zone and its vicinity Possible Improvements?