By:- Rajat Pundir R 140208036. STUDY OF PROCESS &MAKING OF PROCESS SHEETS PLANT ENGINEERING DEPARTMENT This is the department on which I have worked on.

Slides:



Advertisements
Similar presentations
Suspension Systems - 1 Topics covered in this presentation:
Advertisements

Assembled Vehicle Inspection (AVI) Process
STATESMAN Campers, Raising the standards. STATESMAN XP- 3.
MODULE V CDL Pre-route Victoria Creech Training Representative.
ANATOMY OF MOTOR CAR PREESNTED BY AJAY K. JAIN. ANATOMY OF THE CAR.
DAILY PRE-TRIP.
Suspension Fundamentals
Fuel Cell Challenge. Has developed a new challenge that will soon be available to teachers! Engineering Design Experience used in our other challenges.
STATESMAN Campers, Raising the standards. STATESMAN XP- 1.
Steering Columns.
STATESMAN Campers, Raising the standards. STATESMAN XP- 2.
Formula High School: Team Del-Tech. Team Del-Tech Left to right: Xao Yang, Rob DeLeers, Bart Amenson, Eric Simon, and Derek Blackman.
Automotive Industry Development 1. Production of foreign suppliers in Russia Source: Russian Automotive Market Research. 2.
1A-1 Fire Engine Maintenance Unit 1A Vehicle Inspections.
Национальная Ассоциация Производителей Автомобильных Компонентов Член Европейской Ассоциации Поставщиков Автомобильных Компонентов
University of Southern California Enterprise Wide Information Systems Manufacturing Planning and Execution Instructor: Richard W. Vawter.
Introducing Kobelco Car Dismantling Machine
Suspension Fundamentals
Engineer Training Mechanical Overview. Engineer Training Confidential 2 XL1500 is both Roll-to-Roll and Roll-to-Sheet Printer MachineXL1500-2mXL1500-3mXL1500-5m.
2013 NATEF Task Area A-7 Heating, Ventilation, and A/C A. A/C System Diagnosis & Repair B. Refrigeration System Component D & R C. Heating, Ventilation.
Title: Corvette C5 Column Lock Bypass Originator: John Neese Date: 30 Jan 2005 Revision: Sheet: 1 of 6 Column Lock Bypass.
Proper Handling of Automotive Airbag Modules. REMEMBER ALWAYS USE THE REQUIRED PPE Airbag modules are explosive. Improper handling can lead to serious.
APPROVED TRAINING MANUAL’S LESSON PLANS AND COURSEWARE STAR MARIANAS AIR, INC. Recurrent – Flight Crew Part III – Aircraft Ground Training Section 2 –
Parts Catalogue Model : T290/T330 (Tier 2) Printed : 2007/02 Version : A Part number of this book: 제 작 일제 작 일 작 성 박 정 현 ( 인 ) 검.
Manufacturing Engineering Elevator Lift System Operation Copyright © Texas Education Agency, All rights reserved. 1.
Printed : 2008/06 Version Part number of this book: 제 작 일제 작 일 작 성 백 현 미 검 토 정 재 영 승 인 이 종 열 Parts Catalogue T303/353NC.
Corvette Assembly Process Chassis And Final Assembly NCRS National Convention July 20, 2011 John Hinckley.
2005I Lb GVW RV CAB CHASSIS Bob Fluck Program Engineer Manager.
Introduction to the Automobile Chapter One Page 3.
FRAME AND CHASSIS Chassis is a French term which is now denotes the whole vehicle except body in case of heavy vehicles. In case of light vehicles of mono.
Presented by: Rick Kuemin, MSA Training Director
Automobile Manufacturing Plant. ASSEMBLY PROCESS  The Parts  Start With the Frame  Installing the Parts  Engine and Transmission Installed  Building.
RISK INSPECTION & PROCESSING CLAIM WITH LOSS MINIMISATION A PRESENTATION By AJAY K. JAIN.
MAE 435 Progress Report Team: Formula SAE Due Date: 2/8/2016 Advisors: Dr. Bawab; Nathan Luetke Presenter: Ryan P.
WELCOME TO GOLD COAST REGION’S CONCOURS UNIVERSITY & CONCOURS PREPARATION SCHOOL 2016.
Chapter 27 Restraint System Repairs. Objectives Explain the difference between an active and a passive restraint system Learn how to service seat belts.
Chapter 23 Interior Repairs. Objectives Identify the major parts of a vehicle’s interior Remove and replace seats, seat covers, and carpeting Service.
ELECTROMAGNETIC BRAKING SYSTEM
REPAIRING BODY OTOMOTIF
Automotive Heating And Air Conditioning
Automotive Engines Theory and Servicing
PRECISION ARC ROBOTIC SYSTEMS
Suspension Systems - 1 Topics covered in this presentation:
Overview of Vehicle.
Team Name TEAM LOGO COLLEGE NAME Virtual Presentation.
Overview control systems examples of control systems diagrams
An OVERVIEW ON AUTOMOBILE ENGINEERING
CHASSIS, FRAMES AND DRIVES
Foton 6x4 Dumper BJ 3251 This graph shows how the market rates us. These are weaknesses but also an opportunity because if we improve we will increase.
Air Distribution Control
Deliver Today … Build the Future
TYPES OF AXLES.
Welcome We’re using a new cost system for BAJA SAE for the 2018 season. The main change will be moving away from an MS Excel document to an online system.
Parts & Accessories.
Based in Essex, Heathfield Green Parts is one of the UK’s leading suppliers of used Volvo, Vauxhall and Jaguar Parts. With low prices and a vast range.
Lot No - WL1 - SCRAP RADIATOR
MAINTENEANCE AND REPAIR OF STARTING SYSTEMS
Parts & Accessories.
Pre-Trip Responsibilities
FIGURE 24-1 The two horns on this vehicle were finally located under the front bumper. They were not visible until the vehicle was hoisted.
Suspension Systems - 1 Topics covered in this presentation:
F 350 Ford Inspection Peaslee Tech Vehicle.
Suspension Systems - 2 Topics covered in this presentation:
Automotive Technology Principles, Diagnosis, and Service
Automotive Engines Theory and Servicing
Automotive Engines Theory and Servicing
Horn, Wiper, and Blower Motor Circuits
Fuel-Injection Systems
Manual Transmission/ Transaxles
Presentation transcript:

By:- Rajat Pundir R

STUDY OF PROCESS &MAKING OF PROCESS SHEETS PLANT ENGINEERING DEPARTMENT This is the department on which I have worked on. It is an agency which takes care of the pre-engineering activities essentially for in-house components & assemblies of a New Product / New Project, Capacity Enhancement, New Technologies, Method / Process improvements & Engineering Changes to the existing products.

MAIN ACTIVITIES : Feasibility study / Budgeting & sanctions for any new Product / Project. Process design and Productionization of the Product & Projects. Plant & Shop Layouts Management. Facilities, Resource & Equipment Planning & Arrangement Tooling Design and Management Work Measurement, Line Balancing & Manpower Planning Productivity Management New Product introduction through APQP / MPDS route SAP and Process BOM Management KAIZEN Activities & Improvements

PLANT ENGINEERING FUNCTIONS Process Engineering Process Definition & Compliance Change Management Concern Resolution APQP for new Projects Process Improvements Industrial Engineering Work Measurements Manpower Planning Productivity Management Layouts Management Ergonomics & Improvements

INTRODUCTION TO BOLERO SHED BOLERO shed is a place where assembly of BOLERO 4- wheeler is done. This shed consist of: TRIM LINE FACIA LINE CHASSIS LINE ENGINE LINE MAIN LINE

TRIM LINE: Vehicle Body comes from Paint Shop & goes to Trim Line where various operations on body are carried out like Floor Carpet Fitment, Battery Fitment, Trim Pads Fitment, Body Doors Fitment, AC Fitment, Instrument Panel Fitment, Tapping of seat holes, Car Roof Covering, Fitment of various Harnesses for Vehicle’s Electrical Functions, etc. FACIA LINE: Vehicle’s Facia after getting separated from Body goes to Facia Line where various Operations are carried out on Facia like AC Condenser fitment, Air Deflector Fitment, Reservoir Fitment, Modulator Fitment, Euro Tubes Fitment, Headlamp Fitment, Side Indicator Fitment, etc

CHASSIS LINE: Vehicle’s Chassis enters the chassis line after inspection and then various operations like Rear & Front Axle Fitment, Front & Rear Shock Absorber Fitment (Coil Spring & Leaf Spring), Steering Gearbox Fitment, Stabilizer Bar Fitment & Fuel Tank Fitment on Chassis are carried out. ENGINE LINE: In Engine Line, Engine wiring Harness is fitted to the Engine along with Speedo Sensor. Bell Housing attached to a Gear Box is also coupled to an Engine & Clutch Plate too is fitted. Then Starter Motor and Power Steering Pump & Reservoir are also fitted.

MAIN LINE: In Main Line, Various Operations like all the Bundy Tubes Fitment, Fuel Line Fitment, Radiator Fitment, Body Drop, Facia Drop, Tyre Fitment, Handbrake Fitment and many other Important Operations are carried out. FAI CAI WRAP RFI

INTRODUCTION TO PROCESS SHEET Process sheet is used when there is some problem at the line & helps the engineer & operator for doing the specific operation.

It is made with the help of the following 2 things: (1) Dynamic Control Planning (DCP) (a) Process Flow Chart (PFC) (b) Control Plan (CP) (2) Bill of Materials (BOM)

BILL OF MATERIALS (BOM) BOM is a term which is used for Bill of materials. Bill of Material is a document which contains the information regarding: Part No. Part Description Quantity required of that part for a particular product

As in Mahindra & Mahindra there are 4 different BOM’s for 4 different models of Bolero namely: Di Plus/Longer SLE SLX

BOM is a very sensitive document and must be updated as soon as possible and with precision, because it is directly related with the Product Quality Costing of the Product Safety of the Customer

I made total 407 process sheets of bolero(for all models). I worked at shop floor on five lines, names are given below:- Trim line Facia line Engine line Chassis line Main line

THANK –YOU