Netherlands Institute for Radio Astronomy 1 ASTRON is part of the Netherlands Organisation for Scientific Research (NWO) Square Kilometer Array Low Central.

Slides:



Advertisements
Similar presentations
Beamformer implementations (Mike Jones, Kris Zarb Adami, David Sinclair, Chris Shenton) Starting with top level considerations for now, ie Not, which FPGA.
Advertisements

SKADSMTAvA A. van Ardenne SKADS Coördinator ASTRON, P.O. Box 2, 7990 AA Dwingeloo The Netherlands SKADS; The.
Square Kilometre Array (SKA) Project PRE-CONSTRUCTION PHASE Briefing for Industry & Science Organisations Tuesday 14 th August Wellington.
SADC HPC Workshop, 2 Dec 2013, Cape Town
Jeroen Stil Department of Physics & Astronomy University of Calgary Stacking of Radio Surveys.
21 cm Cosmology Jeff Peterson, CMU -Existing telescopes and data -Intensity Mapping -Fixed Cylinders.
All things DBE… Francois Kapp Sub-system Manager: DBE On behalf of the DBE team present and past... S Rajan, E Bauermeister, A.
SKA South Africa Overview Thomas Kusel MeerKAT System Engineering Manager April 2011.
PELICAN Imaging Framework Imaging on short timescales leads to very large correlator output data rates. In order to cope with these rates and produce updated.
Netherlands Institute for Radio Astronomy 1 ASTRON is part of the Netherlands Organisation for Scientific Research (NWO) From LOFAR design to SKA1 System.
BDT Radio – 2b – CMV 2009/10/09 Basic Detection Techniques 2b (2009/10/09): Focal Plane Arrays Case study: WSRT System overview Receiver and.
Signal Processing for Aperture Arrays. AAVS1 256 antenna elements distributed over –4 stations –64 elements each.
AA-Low Technical Progress Meeting, October 2012, Medicina, Italy AAVS0 & AAVS0.5: System Design and Test Plan Nima Razavi-Ghods Eloy de Lera Acedo.
EMBRACE Local Oscillator distributor EMBRACE (Electronic Multi-Beam Radio Astronomy ConcEpt) has been planned as about 300 square meters aperture array.
1 © 2011 Cisco and/or its affiliates. All rights reserved. Ultra High-speed Telecommunication Requirements for the SKA Peter Elford Business Development.
ASKAP Signal Processing Overview DIFX Users and Developers Meeting
SKA Introduction Jan Geralt Bij de Vaate Andrew Faulkner, Andre Gunst, Peter Hall.
Transition from SKADS to PrepSKA Richard Schilizzi Lisbon, 3 October 2008.
Paul Alexander & Jaap BregmanProcessing challenge SKADS Wide-field workshop SKA Data Flow and Processing – a key SKA design driver Paul Alexander and Jaap.
Accelerating a Software Radio Astronomy Correlator By Andrew Woods Supervisor: Prof. Inggs & Dr Langman.
Casper Signal Processing Workshop 2009 SKA Signal Processing (Preliminary) Wallace Turner Domain Specialist for Signal Processing.
CRISP & SKA WP19 Status. Overview Staffing SKA Preconstruction phase Tiered Data Delivery Infrastructure Prototype deployment.
The Square Kilometre Array: an update Steve Rawlings UoOxford and PrepSKA Coordinator Richard Schilizzi SKA Program Development Office Japan, November.
Nov 3, 2009 RN - 1 Jet Propulsion Laboratory California Institute of Technology Current Developments for VLBI Data Acquisition Equipment at JPL Robert.
© ASTRON On the Fly LOFAR Station Correlator André W. Gunst.
MeerKAT DBE Past Present Future Alan Langman 28 September 2009.
AAVS processing: Uniboard implementation. UNIBOARD Jive led FP7 project UniBoard, high integration density >> processing / m3
Review of developments in Australasia and mainland Asia Steven Tingay Swinburne University of Technology Next Generation correlator meeting, JIVE 27 -
Paul AlexanderSKA Computational Challenges Square Kilometre Array Computational Challenges Paul Alexander.
ATCA GPU Correlator Strawman Design ASTRONOMY AND SPACE SCIENCE Chris Phillips | LBA Lead Scientist 17 November 2015.
Rosie Bolton 2 nd SKADS Workshop October 2007 SKADS System Design and Costing: Update and next steps Rosie Bolton University of Cambridge.
1 Next Generation Correlators, June 26 th −29 th, 2006 The LOFAR Blue Gene/L Correlator Stichting ASTRON (Netherlands Foundation for Research in Astronomy)
Netherlands Institute for Radio Astronomy 1 CSP SKA-low correlator meeting, Dwingeloo, 24 – 27 November 2014 RadioNET3 WP8 RadioHDL: FPGA Firmware Development.
The UniBoard a RadioNet FP7 Joint Research Activity Arpad Szomoru, JIVE.
SKA Central Signal Processor Architecture SKA CSP LMC Peer Review 11.April, 2016, Madrid Sonja Vrcic SKA CSP LMC Sub-element Lead.
Engineering Commissioning May 2016 SKA1 LOW – Assembly, Integration & Verification Adam MacLeod AIV Consortium Manager & ASKAP System Engineer.
Netherlands Institute for Radio Astronomy 1 APERTIF beamformer and correlator requirements Laurens Bakker.
Netherlands Institute for Radio Astronomy 1 Bits & Chips - Smart Systems, November 20th 2014 DSP & UniBoard Astron Hajee Pepping.
SKA Status – Tango Collaboration Meeting Lize van den Heever June 2016.
Andrew Faulkner April 2016 STFC Industry Day: Low Frequency Aperture Array Andrew Faulkner Project Engineer.
Netherlands Institute for Radio Astronomy 1 ASTRON is part of the Netherlands Organisation for Scientific Research (NWO) Board Design Gijs Schoonderbeek.
Limitations of Single Dish Astronomy
Korea Astronomy and Space Science Institute
Building the Square Kilometer Array – a truly global project
Mid Frequency Aperture Arrays
ASKAP High Time Res Capabilities
RadioNet FP7 Joint Research Activity
The UniBoard Generic Hardware for Radio Astronomy Signal Processing
The UniBoard A RadioNet FP7 Joint Research Activity, 9 partners
AAVS1 Calibration Aperture Array Design & Construction Consortium
Signal Processing for Aperture Arrays
Phased Array Feeds Wim van Cappellen
LFAA Software Development
The Development of Broadband VLBI Technologies in SHAO
UniBoard2 applied in the Square Kilometer Array
SAFe Workshop SKA CSP Approach and Plan
Aperture Array Station Processing
FPGA Based Trigger System for the Klystron Department
INTEGRATING THE SKA-MPI DISH INTO MEERKAT
SADT Overall Summary Total ICD count is currently 37 system level ICDs across 6 Elements LFAA 3 ICDs DISHES 7 ICDs CSP 12 ICDs TM ? Unable to proceed.
The Uniboard  FPGA Processing for Astronomy
SKADS White Paper - Technologies -
SKA PEP - Dish Array WP5 Phase 1 Dishes with Single Pixel Feed Systems
Aperture Array Simulations
The e-EVN Arpad Szomoru, JIVE.
Realizing an universal digital processing platform
Correlator Growth Path
VLA EXPANSION PROJECT Correlator Issues.
SKAMP Square Kilometre Array Molonglo Prototype
Presentation transcript:

Netherlands Institute for Radio Astronomy 1 ASTRON is part of the Netherlands Organisation for Scientific Research (NWO) Square Kilometer Array Low Central Signal Processor (SKA CSP_LOW) André Gunst

SKA Receptors ASKAP Phase Array FeedsLow Frequency Aperture Arrays Mid Frequency Aperture Arrays (phase 2) Meer KAT Dishes Site: Western Australia Site: Southern Africa SKA Dishes CSP_LOW CSP_SURVEY CSP_MID

Tasks ASTRON  Architectural design targeted to UniBoard 2  Hardware development  UniBoard 2 firmware development (interfaces)

Context

LFAA (Low Frequency Aperture Array) CSP (Central Signal Processor) SDP (Science Data Processor)

Key Numbers  2048 input signals  300 MHz bandwidth in 1024 subbands  One beam  256 channels  Integration time 0.6 seconds

The Problem

The Solutions Strengths FPGAs Cost Power Long lifetime Dense Strengths GPUs Dev. time Flexible Easy to replace Low risk

GPU Solution GPU IBM Power 8 S824 server

GPU  512 servers required (52 racks)

Redback-4

 Channeliser: 13 boards  Correlator: 138 boards

Mezzanine Card

Power-MX mapping

Firmware (factory image)

Test image

Cost comparison

Conclusions  UniBoard 2 is a good candidate for CSP_LOW  We are involved in architectural, hardware and firmware design  Firmware uses our framework to develop DSP application independently