MASON GULCH LANDSCAPE MANAGEMENT PLAN PUBLIC MEETING August 4, 2016.

Slides:



Advertisements
Similar presentations
Wetland restoration after a mega-storm Jyneen Thatcher, Wetland Scientist Washington Conservation District Paul Bockenstedt, Ecologist Stantec.
Advertisements

Preparing Cutover Woodland for Longleaf Establishment By Larry J. Such NC Division of Forest Resources.
/ / Managing Invasive Plants to Protect Biodiversity.
PLANTING NATIVE SPECIES Introduction to Watershed Science Merritt College Marc Epstein, Instructor.
Working Lands for Wildlife WLFW. Focal Areas by Species.
At the Jewett Lignite Mine. the re-establishment of the stream system that existed prior to disturbance… the re-establishment of the stream system that.
Localisation The potential action of forest stands Management objectives Sylvicultural objectives Sylvicol actionsSuitable stand profilIdeal stand type.
Alley Cropping with Nitrogen Fixing Hedgerows Prepared by: L. Robert Barber, & Ilene Iriarte For: Guam Cooperative Extension Service & Guam Department.
Wildlife Management Principles. Goals What are some goals related to the management of wildlife habitats?
LIGHT RAIL PERMITTING ADVISORY COMMITTEE COMMITTEE MEETING October 15, 2014|3:00PM -5:00PM | ROOM 1E-113.
Urban Forest Hurricane Recovery Program
Introduction to World Agriculture. Define terms related to forestry. Describe the forest regions of the US. Discuss important relationships among forests,
Illinois Department of Natural Resources. Illinois Coastal Management Program Illinois was officially approved as a Coastal Management Program on Jan.
Introduction to Fire Ecology 5/25/07. What is Fire? Rapid oxidation reaction in which heat and light are produced. Exothermic Three ingredients – Fuel.
Environmental Quality Incentives Program (EQIP) Grazing – Our Most Commonly Used Conservation Practices.
Module 7: Construction Phase
HILLOWAY PARK RENEWAL MASTERPLAN 17 December 2002 City of Minnetonka Parks Renewal Project The Kestrel Design Group, Inc Hankerson Ave. Suite 1 Minneapolis,
CLIMATE CHANGE AND MICHIGAN FORESTS
Changes to Rangelands Over Time. Range Change Factors  Grazing  Fire  Invasive Species  Weather/Climate  Human Activities.
Forest Biomes. 1. What are the three main types of forest biomes? Tropical Rain Forest Temperate Forest – Temperate Rain Forest – Temperate Deciduous.
Chapter 4: Kinds of Ecosystems Section. 4.1: Forests.
Earth Day Award Nomination ConocoPhillips Reese Canyon Drill Site Grand Staircase-Escalante National Monument.
Tree invasion on reclaimed anthracite surface mines in Pennsylvania: Reevaluating inhibition Klemow, K.M., R. Klemish, M. Petras, R. Ali, J. Keller, R.
Maximizing Impact / Minimizing Impact: Balancing Human and Environmental Concerns through Site Access Design Lee-Anne Milburn Department of Landscape Architecture.
Dominguez-Escalante National Conservation Area Dominguez Canyon Wilderness Resource Management Plan Scoping Meetings August 30 and 31, 2010.
ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 Fish Habitat Restoration.
Horsley Witten Group, Inc. Public Workshop Vegetation Management and Maintenance January 19, 2011 Rhode Island Stormwater Design and Installation Standards.
Authors - Kim Goodwin, Project Specialist Roger Sheley, Associate Professor Janet Clark, Director, Center for Invasive Plant Management Department Editor.
Lushan Mountain Evergreen broad-leaved forest Evergreen deciduous broad-leaved forest Deciduous evergreen broad-leaved forest Deciduous broad-leaved.
How Plants Grow & Respond to Disturbance. Succession & Disturbance  Community change is driven by successional forces: Immigration and establishment.
August 2009 Presented By: Tim Brodeur The Benefits of Keeping our Native Beauty Intact - Area IV Water Conservation Committee Model Native Plant Ordinance.
6-2 Forest Biomes Page 146. A. Tropical Rain Forests 1. Humid and warm and get about 200 to 450 cm of rain a year.
Forest Ecosystem.
George Peacock, Team Leader Grazing Lands Technology Development Team Central National Technology Support Center 2010 Southern Regional Cooperative Soil.
Orange Lake Habitat Management Plan Stakeholder Input Process Public Meeting #2 October 13, 2015.
Terrestrial Biomes.
ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 Clearing and Site Preparation and Site.
 Provide many social, environmental and economic benefits.  They provide 10,500 hectares of recreational space, improve air quality, control flood waters,
USING STEWARDSHIP AUTHORITY TO ADVANCE RESTORATION Mae Lee Hafer Regional Stewardship Coordinator Collaborative Restoration.
OPEN SPACE/ CONSERVATION
Intermediate Use Areas: Considerations and Tools
Mason Gulch landscape Management plan WORKSHOP
3.9 ECOLOGICAL SUCCESSION
Mason Gulch landscape Management plan Public meeting
Wildlife Terms and Concepts
Chapter 9 Forest Biomes By Faith Lawless & Ryan Smith
Tom Parker and Sarah Flynn Geum Environmental Consulting, Inc.
Forest Biome Forest Climate Forest Plants Forest Animals.
Section 3: How Ecosystems Change
Flowers and Trees Backyard Ecosystem.
Prairie Restorations, Inc.
The Wrap-up.
Construction Management & Inspection
Rangeland Principles (Rem 151)
Section 3: How Ecosystems Change
Section 3: How Ecosystems Change
how do I know when I’m done?
History and Management Practices
An adventure in rangeland transition models.
Section 3: How Ecosystems Change
Section 3: How Ecosystems Change
Section 3: How Ecosystems Change
Piedmont Habitat of Georgia
An adventure in rangeland transition models.
Section 3: How Ecosystems Change
Urban Forests – Our Most Valuable Asset!
Section 3: How Ecosystems Change
Section 3: How Ecosystems Change
Section 3: How Ecosystems Change
Presentation transcript:

MASON GULCH LANDSCAPE MANAGEMENT PLAN PUBLIC MEETING August 4, 2016

TONIGHT'S AGENDA  Introduction  Public Process Timeline  Final Draft Plan Details  Site Work Implementation  Q&A

PUBLIC PROCESS TIMELINE  Final Draft LMP Review – early September  Permit Application – mid-September  Public Comment Period  No later than 28 days after application  2 week duration  Permit Receipt – anticipated 120 days from permit application

FINAL DRAFT PLAN  Improving Slope Stability  Maximizing Stormwater Benefits  Working to Protect Public Infrastructure and Public Safety  Achieving a Sustainable Target Ecosystem  Improving Wildlife Habitat  Developing a Program for Stewardship and Public Involvement  Scenic Views from Public Areas

5 MANAGEMENT UNITS

MANAGEMENT UNIT 1 INVASIVE DOMINANT (TOP OF SLOPE) Phase One – Preparation and Planting, Late Summer/Fall  Identify weeds present and use eradication methods  Remove weed top growth leaving roots in place  Minimize soil disturbance  Install coir erosion control blankets over entire restoration area  Install deciduous and evergreen shrubs (no trees) Phase Two – Monitoring and Adaptive Management  Monitor during the growing season for the first year  Replace plants that fail and adapt species mix as necessary  Continue to monitor plant establishment for five years  Monitor for slope movement

MANAGEMENT UNITS 1 AND 2 No Work will happen in areas with slopes 80% and over.

MANAGEMENT UNIT 2 – STEEP SLOPES, INTENSE RESTORATION Phased Grid Cell Work  Coppice only previously coppiced deciduous trees leaving one healthiest stem in each tree  Remove 25% of canopy on other deciduous trees only if needed for light (May repeat in subsequent years )  Leave coppiced tree stems lodged against stumps, remove brush  Install coir erosion control blankets throughout cell  Install plants to average five conifers, two deciduous trees per grid cell with dense shrub and groundcover layers  Monitor for plant establishment for five years, supplement planting as needed  Monitor for slope movement

MANAGEMENT UNIT 2 – GRID

SLOPE CROSS SECTION

MU2 – SLOPE CROSS SECTION

GRID CELL PHASES

MANAGEMENT UNIT 3 – STEEP SLOPES, MODERATE RESTORATION Phase One – Preparation and Planting, Fall  Identify weeds present and eradication methods  Remove weed top growth leaving roots in place  Minimize soil disturbance  Install five species of deciduous shrubs and four coniferous tree species Phase Two – Monitoring and Adaptive Management  Monitor during the growing season for the first year  Replace plants that fail and adapt species mix as necessary  Continue to monitor plant establishment annually for five years

MANAGEMENT UNIT 4 – TRANSITION ZONE Phase One – Preparation and Planting, Fall  Identify weeds present and eradication methods  Remove weed top growth leaving roots in place  Minimize soil disturbance  Install six species of native shrubs, four groundcover species and two coniferous tree species Phase Two – Monitoring and Adaptive Management  Monitor during the growing season for the first year  Replace plants that fail and adapt species mix as necessary  Continue to monitor plant establishment for five years

MANAGEMENT UNIT 5 – INTERIOR VALLEY Phase One – Preparation and Planting, Fall  Identify weeds present and eradication methods  Remove weed top growth leaving roots in place  Minimize soil disturbance  Install three shrub species, two species of emergents, and five tree species Phase Two – Monitoring and Adaptive Management  Monitor during the growing season for the first year  Replace plants that fail and adapt species mix as necessary  Continue to monitor plant establishment for five years

SITE WORK IMPLEMENTATION  Permit received – anticipate mid-December  Jan – Mar 2017 – Work in MU1 – one acre invasive removal and planting  Oct 2017 – Mar 2018 – Work in MU1 – one acre and start on MU2 squares as resources allow  Offer Vegetation Modification Request process when approved and available

WE HEARD… RESULT…  Workshop  Trails – for and against  Plant Selection  Public View  Private Views  Workshop held on May 25  Due to soils, safety, and public comment - public trails will not be addressed in this LMP  Shorter plants at top of slope  Found balance between an acceptable risk level and actions  Vegetation Modification Request

FIND OUT MORE