Tue 23/8 – Wed 24/8 09:00 Start 90 m optics run – Preparation and verification of the collimation functions – Re-generation of functions for Transverse.

Slides:



Advertisements
Similar presentations
8:16 SB 25ns dumped by RF; integrated lumi 0.6 nb-1. 9:14 BIC problem in TI8 and CMS recovering their tracker 10:09 Abort gap cleaning commissioning. 16:29.
Advertisements

Wednesday 12 th September Pumping, removal of vacuum equipment from tunnel in the morning TOTEM & ALFA, RP movement tests: OK 11:50 pre-cycle started,
MD#2 News & Plan Tue – Wed (19. – 20.6.) DayTimeMDEiCMP Tue06: GeV  4 TeV: Ramp for chromaticity - missed A 08:00Ramp down 10: GeV: Large.
Lot’s of time lost due to cryo problem in IR8. Major impact, therefore review of MD program… Start discussion here, please let us know your input. Will.
CONTENT: Beam characteristics and parameters Filling schemes Operational settings OP procedure and COLL setting Planning Shift breakdown To define the.
ION COMMISSIONING REVISITED 1 Thanks to: John Jowett, Walter Venturini. Matteo Solfaroli.
Monday h00: End of fill #1640: 3.7 pb h14: RB S12 and S23 tripped before loading rampdown table, active filter. MPE piquet. Fip_Com_Lost.
LHC progress Report LHCC Wednesday 23 rd March 2011.
LHC Progress Friday 30 th October 2015 Coordination Week 44: Massimo Giovannozzi, Wolfgang Hofle, Jorg Wenninger.
LHC Progress Thursday 29 th October 2015 Coordination Week 44: Massimo Giovannozzi, Wolfgang Hofle, Jorg Wenninger.
Monday :00 Injection for physics fill # :00 Stable beams fill #1816, luminosity ~1.2x1033 cm-2s-1 11:08 Beams dumped. QPS trigger on detector.
MD Wed – Sat DayTimeMD Wed06:00UPS repair, ATS optics checks w/o beam 12:00Cycle, test ATS optics w/o beam 16: TeV: BPM offset determination for.
Draft MD Planning Thu (3.11.) DayTimeMDMP Thu05:00 Ramp down, cycle 07: GeV: Injection stability and losses – check steering constraints, define.
– Machine closed. Ramp for powering tests & pre-cycle – Pilots through nominal cycle up to collisions. Measure chroma during squeeze. Check dump of pilots.
Saturday 11.9 ● From Friday – Minimum required crossing angle is 100  rad in 2010 – Plenty of aperture at triplets: > 13  (n1 > 10) – Can stay with 170.
CONTENT: Beam characteristics and MP concerns BI configuration Operational settings Collimators Planning Shift breakdown Thanks to: P.Baudrenghien, G.Bellodi,
Cryo back at 17:30 Beam back at 19:00 IR2 aperture until ~03:00 Since then no beam from the SPS:  Connector problem on MKD  Connector eroded, needs to.
04h36: Cryo problem in arc 81. Access. 09h14: Injection.  TI8 injection collimator setup.  Testing new sequence.  New version of vacuum application.
28/01/2013LHC 8:30 meeting Summary of Week 4 pPb physics Machine Coordination: Mike Lamont & Jan Uythoven Ion coordination: John Jowett.
LHC Status Sat Morning 30-June Bernhard Holzer, Jan Uythoven Status Friday Late: preparing restart some issues... LHCb dipole tripped / router problem.
:30 meetingEBH 1  No beam during the morning:  4:15 – 9: V distributor: Recovery after electrical interruption  access for TI services.
Week 13: R. Assmann, J. Wenninger
Wednesday
Ralph Assmann, Giulia Papotti, Frank Zimmermann 25 August 2011
MD Planning Fri – Sat (26. – 27.8.)
Wednesday 8.9 External crossing angles:
1st LHC MD Period Started
Cryo Problem MD Planning Tue (1.11.) C B Day Time MD MP Tue 01:00
Saturday 21st April 00:33 Interlock during ramp on BLM HV
MD Report 24 June 2012 Machine coordinators: Barbara Holzer, Mike Lamont MD Coordinators: Ralph Assmann, Giulia Papotti, Frank Zimmermann MD#2 News & Plan.
Friday 07:00 Power glitch on the EDF network. Point 8 affected.
Monday 11/07: Recovery Plenty of accesses.
Week 46 Week 46: Machine coordinators: Roger Bailey – Gianluigi Arduini Main aims of the week: Stable beams with ions Scheduled stop for ion source refill.
Tue :25 Beams dumped due to RF vacuum interlock
Wednesday /Thursday 09-11:00 Verification of the LSS6 interlocked BPMs: took longer to fill due to some problems with RF cavities in the PS. In the mean.
LHC Morning Meeting - G. Arduini
Tuesday TOTEM and transverse loss map (1) OK
LHC MD block#3 Ralph Assmann, Giulia Papotti, Frank Zimmermann
Summary of Week 11: 14 – 21 March
LHC Morning Meeting - G. Arduini
Summary of Week 16 G. Arduini, J. Wenninger
MD#2 News & Plan Tue – Wed (19. – 20.6.)
Mon 22/8 – Tue 23/8 00:07 stable beams #2040. Initial luminosities: 2.1x1033 cm-2s-1 18:00 Programmed dump. End of physics #2040. ~83 pb-1 in ~18 hours.
Wed :40 Lost S78 - QPS controller.
Week 36 plan Todo’s: And also: 12+b injection.
Week 35 – Technical Stop and Restart
Summary of Week 26 Main aims: G. Arduini, B. Holzer, M. Lamont
MD#2 News & Plan Tue – Wed (19. – 20.6.)
Friday morning 10:30 Optics measurements and corrections.
LHC Morning Meeting - G. Arduini
Yesterday’s morning’s controls issues
Friday 16/3 08:30 – 10:15 Access for QPS and EPC (BI in point 4)
BI cont. *** Summary Matching Monitor test *** We only had ~15minutes of inject and dump, but managed to see a profile with ~9e9 p (!)
Saturday 7th May Sat – Sun night
Friday 23rd March 08:00 Access
Summary Thursday h21: Stable beams fill #1303.
Summary of week 19 Machine Coordinators: G. Arduini, M. Lamont Main aim: Luminosity production.
Aims for the week Recover from technical stop and precycle at 10A/s
MD#2 News & Plan Tue – Wed (19. – 20.6.)
MD Planning Fri – Sat (1. – 2.7.)
Wednesday h10: Programmed dump. 07h54: Injection. 200b.
Summary for LPC (March 7th, Ralph Assmann)
Friday 14th September 03:15 Beta* at 1 km. Optics measurements, see yesterday. 07:00 Dump. 08:00 Refill with 3 nominal bunches for high beta. 11:15 Beams.
Saturday :42 stable beams fill 3541
Monday :15 fill 3523 dumped by BPMs IP6
LHC Morning Meeting - G. Arduini
Wednesday h18: 228b fill lost just before start of ramp.
Another Immortal Fill….
Thursday Morning/Afternoon
Saturday 29th October Friday during IP2 1 m squeeze test
Presentation transcript:

Tue 23/8 – Wed 24/8 09:00 Start 90 m optics run – Preparation and verification of the collimation functions – Re-generation of functions for Transverse damper, RF longitudinal blow-up etc. 10:30 Injecting. – Problems in the orbit acquisition due to the defined filling scheme with bunches of different intensity (2 bunches with 8x10 10 p/bunch, 4 bunches with 3x10 10 p/bunch). – BPM triggering also on lower intensity bunches even reducing their intensity below 2x10 10 p/bunch. – Poor orbit readings leading to beam dump (LSS6 BPMs)

Tue 23/8 – Wed 24/8 14:00 New filling scheme with 5 bunches of 6x10 10 p/bunch

Tue 23/8 – Wed 24/8 15:00 Lost beam during the ramp due to a problem on an RF frequency distribution module requiring a reboot on request of RF expert 17:00 refill after fixing problem with RF module (replaced). Ramp OK a part of a dip in Beam 1 lifetime. Longitudinal blow-up OK

Tue 23/8 – Wed 24/8 18:30 Beam dump during the squeeze due to a trip of two triplet orbit correctors (RCBXH1.R1, RCBXH3.R1). Traced back to a problem in LSA function trim leading to functions with no rounding. Not observed on the physics hyper-cycle  still being analyzed with CO experts.

Tue 23/8 – Wed 24/8 Functions smoothed out by rolling back to older functions 21:47 finally squeezed to 90 m. Lifetime OK this time

Tue 23/8 – Wed 24/8 In agreement with MD coordinator and Physics coordinator decided to give an additional slot of 9 h taking it from MD time (beam-beam MD) to be recovered after technical stop to allow completing the TCT/roman pot alignment and data taking 23:47 Beams colliding at all IPs and start TCT alignment. Some difficulties in optimizing collisions due to missing luminosity data (had to reboot DIP servers)

Tue 23/8 – Wed 24/8 01:06 All TCTs aligned. 04:53 All TOTEM Vertical roman pots aligned but problem with high voltage for data taking. Problems with ALFA roman pots movement (no communication with PXI). After verification with rMPP (Rüdiger) decision not to reboot PXI with circulating beam

Tue 23/8 – Wed 24/8 05:16 Power glitch. Trip of compensators in point 2 and 8 Start preparation of  * 1 m MD.

MD Planning Wed – Thu (24. – 25.8.) DayTimeMDMP Wed 04:00Ramp down, cycle 06: GeV  3.5 TeV: Head-on beam-beam + 1h data taking (stable beams) – for highest pile-up B 13:00Ramp down, cycle 15: GeV  3.5 TeV: Optics setup for  *=1m (1) – Pilots through squeeze, measure and correct Q, Q’, C, orbit, measure beating and local coupling A 19:00Ramp down, cycle 21: GeV  3.5 TeV: Long bunch length – RF setup at injection, test ramp for losses in IR3, voltage change at flat top B Thu 03:00Ramp down, cycle 05: GeV  3.5 TeV: Beam Instrumentation B 13:00Ramp down, cycle. 15: GeV  3.5 TeV: LR beam-beam – 2 batches, effect of number of LR interactions, effect of emittance C MD Planning 2011/12, MD#3 16/08/2011

Draft MD Planning Fri – Sat (26. – 27.8.) DayTimeMDMP 23:00Ramp down, cycle. Fri 01: GeV: Transverse damper – beam blowup at injection B/C 07: GeV  3.5 TeV: Aperture – scraping pilot beam tails in triplets, maybe test global aperture measurement with transverse damper B 15:00Ramp down, cycle. 17: GeV: 25 ns studies – injection of up to 144b/288b, damper B Sat 00: GeV: 25 ns studies – vacuum, ecloud, RF B 07: GeV  3.5 TeV: Optics setup for  *=1m (2) – apply proposed beating and local coupling corrections; at 1m: measure beating and coupling, verify corrections, test collision beam process A 15:00Ramp down, cycle. 17: GeV  3.5 TeV: Collimator setup for  *=1m – tight collimation settings, set up TCT’s in IR, loss maps. Asynchronous dump, if time left. B MD Planning 2011/12, MD#3 16/08/2011

Draft MD Planning Sun – Mon (28. – 29.8.) DayTimeMDMP Sun 01:00Ramp down, cycle. B 03: GeV  3.5 TeV: p-p rephasing – debunching during ring rephasing with nominal emittances 09:00Ramp down, cycle. 11: GeV: UFO studies – generation mechanism at MKI’s, statistics, MKQA tests (p-Pb interlock test in the shadow) C 19: GeV: Quench margin at injection – observation with special QPS instrumentation, losses from TCLIB collimator C 22: GeV  3.5 TeV: Quench test at 3.5 TeV – test losses in other dispersion-suppressors – dropped if extra time needed for  *=1m C Mon 06:0 0 Technical Stop MD Planning 2011/12, MD#3 16/08/2011 Needs from experiments : -Luminometers on during beam-beam MDs and in the second slot of  *=1 m