© 2015, Fiatech Adding the Underground to 3D Construction Models Compelling Image Here (If Possible)

Slides:



Advertisements
Similar presentations
Amitava Mitra, Solution Architect, Oracle Primavera, TCS
Advertisements

Prioritized Scheduling and Managing of All Utility Work Utility Characteristics Historical Concerns Improvement Goals Process Teams Implementation of.
Value across the entire software project lifecycle
Airport Owner’s Guide to Project Delivery Systems Prepared by: The Joint Committee of ACI-NA, ACC and AGC.
3-1 Utility Conflict Identification and Management Lesson 3.
Continuous Value Enhancement Process
Plant Information Model (PIM) Breakout N1 – (1:00pm – 2:30pm), Monday, June 16, 2014 Russell Adams – EPRI Consultant Laurent Perkins, Bentley Kent Freeland,
TOOL TO DESIGN FOR CONSTRUCTION WORKER SAFETY An Article Written by Gambatese, Hinze and Haas 1997.
Continuous Auditing. Items to be discussed include: Developing a Continuous Auditing Program Continuous Auditing Process Benefits of Continuous Auditing.
Welcome ISO9001:2000 Foundation Workshop.
New PBIS Coaches Meeting September 2,  Gain knowledge about coaching  Acquire tips for effective coaching  Learn strategies to enhance coaching.
OneView Benefits Sales collaboration across network A “one-stop” utility portal Ease of use, scalability & accessibility Useful reports and metrics Improved.
Analyze Opportunity Part 1
A New Paradigm for Utility Coordination Kenny Franklin INDOT Director of Utilities and Railroads.
3D Utility Data – Reducing Project Delays, Managing Assets 3D Utility Data – Reducing Project Delays, Managing Assets WASHTO 2015WASHTO 2015.
Current Design and Implementation Challenges of Road Projects on the Coastland Ron Rahaman Chief Roads and Bridges Officer Ministry of Public Works Works.
Service Transition & Planning Service Validation & Testing
Texas Turnpike Authority Division AASHTO Right of Way & Utilities Committee Conference Wednesday – April 22, 2009.
The Services Model: Transitioning Your Mind & Your Team Bonnie M. Robertson The Robertson Company.
Software Project Management
1 Local Readiness Team Lead Kick-Off Meeting May 16, 2007.
Enterprise Architecture Enterprise Architecture = a framework or ‘blueprint’ for how the organization achieves the business objectives at hand and in future.
KFS Data Mapping Leveraging a new KFS 3.0 feature.
© BMGI. You may freely modify, distribute and/or reproduce this only if BMGI's logo is not altered or removed. Finance Process 22 May 2006.
2007 National Weatherization Training Conference December 9-12, 2007 Orlando, Florida 2007 National Weatherization Training Conference December 9-12, 2007.
© 2015, Fiatech Scanning the Horizon: Identifying and tracking global technologies & processes Horizon-360 Team Update Compelling Image Here (If Possible)
© 2015, Fiatech Implementing Change. © 2015, Fiatech Presentation Takeaways/Deliverables Implementing Change Fiatech BIM - From 2D to ?D Resistance to.
1 Hach Water Information Management Solution TM (Hach WIMS TM ) Overview.
1 The New York State Integrated Justice Information Exchange Project BJA Regional Information Sharing Conference: Information Exchange Modeling/Business.
Value of Subsurface Data in Transportation Steven P. DiBenedetto, CPG Senior Geoscientist & Technology Manager Chris Clark Mid Atlantic Director of Business.
© 2015, Fiatech Collaborative Decision making -- How IT can help.
1 Global Design Effort: Controls & LLRF Controls & LLRF Working Group: Tuesday Session (29 May 07) John Carwardine Kay Rehlich.
The Implementation of BPR Pertemuan 9 Matakuliah: M0734-Business Process Reenginering Tahun: 2010.
© 2015, Fiatech Size Does Matter Making Big Data Small Case Studies.
4.5 Perform Integrated Change Control
State of Georgia Release Management Training
© 2003 Six Sigma Academy0 The Roles of Six Sigma Champion Workshop.
Application of NASA ESE Data and Tools to Particulate Air Quality Management A proposal to NASA Earth Science REASoN Solicitation CAN-02-OES-01 REASoN:
Internet of Things Business Case Template. Powered by InfoTech, provided by Atlantic BT Summarize the business case for analyzing the Internet of Things.
Installation and Commisioning SE view point Romuald Duperrier ESS SE manager.
A New Paradigm for Utility Coordination Kenny Franklin VP of SUE Development Blood Hound.
Systems Analysis and Design in a Changing World, Fifth Edition
Continuous Improvement Project (A Guideline For Sponsors)
Design – BIM – Build – Operate
Richard White, David Gate
At the Crossroads: The Convergence of IT Service Management and Project Management in Higher Ed Wednesday October 1, :30 PM – 2:20 PM Meeting Room.
The Five Secrets of Project Scheduling A PMO Approach
SCC Spend Visibility (SpendVis) Training
Project Portfolio Management
Multilevel Marketing Tree Viewer
Boeing Phantom Works Lean and Efficient Processes and Tools
Systems Analysis – ITEC 3155 Evaluating Alternatives for Requirements, Environment, and Implementation.
Health Catalyst Care Management Suite
ITPD ISSUE MANAGEMENT PROCESS SEPTEMBER 5, 2008
RISK ASSESSMENT TOOL PREVIEW
Project Charter I want to design a project
STRATEGIC THINKING AND VISIONING
Catalyst Pitchback Energy Efficiency as a Service
Community Update Project Overview Maximizing Benefits
Your Facility Your Information
Sarbanes-Oxley Act (404) An IT Viewpoint
55 Assessment, monitoring and evaluation
Developing a Research Impact Capture System
Joint Planning and Development Office “Where new ideas are welcome”
Developing a Research Impact Capture System
Capital Improvement Plans
A Paradigm for Utility Coordination
Applied Software Project Management
Technology Maintenance
OU BATTLECARD: Oracle Systems Learning Subscription
Presentation transcript:

© 2015, Fiatech Adding the Underground to 3D Construction Models Compelling Image Here (If Possible)

© 2015, Fiatech Presentation Flow Presentation Takeaways/Deliverables Opportunities Being Addressed Constraints & Barriers Approach & Benefits Realized Future Work & Industry Adoption Contact & More Information Presentation Flow

© 2015, Fiatech Presentation Takeaways/Deliverables Key Takeaways Understand benefits of having 3D utility data available in a design & construction model Grasp limitations of the utility data collection and modeling processes Compelling Image Here (If Possible)

© 2015, Fiatech Opportunities Being Addressed Utility Risks in Construction Inaccurate records/mapping & unknown utilities Construction scheduling dependent on utility relocations & installation being complete on time Civil structure & utility design based on (poor/wrong) available information Coordination issues during relocation design & construction Safety! Compelling Image Here (If Possible) Photo Courtesy of EPA

© 2015, Fiatech Constraints & Barriers to Effective Utility Modeling Buried utilities not visible from surface; Not Lidar WYSIWYG Utility materials can be difficult to detect Soil & environment can foil geophysics New utility installations occurring daily Records obsolete & rarely georeferenced “as-builts” = “as-imagined” Depths difficult to obtain w/o testholes Constraints & Barriers 3dbc8ddb970d-pi

© 2015, Fiatech Anticipated Benefits of 3D Utility Model Compelling Image Here Central Communication Tool for all utility- related information across disciplines Comprehensive utility info clearinghouse: SUE QL, Type, Size, Owner, Material, QL A (testhole) information Easy retrieval of info for entire DB Team: Profiles, elevations, stakeout, testholes Enables strategic vs. reactionary decisions Fewer redesigns, change orders & schedule impacts; enhanced communication O+M applications for future utility installations Handover to owner Approach & Benefits Realized

© 2015, Fiatech Building & Maintaining the Model Bentley SUE package, Power InRoads/GeoPak Based on QLB fieldwork with QLD metadata Depths assumed from TXDOT Utility Accommodation Rules (UAR) Continual attribute updating based on testhole program & fieldwork (location, depth, size, material) New installations added as constructed Utilities taken out of service and/or removed are updated in model Approach & Benefits Realized

© 2015, Fiatech Summary & Implementation Value still being calculated on this project (construction begins this month) High quality SUE program necessary for best model inputs & uses; many assumptions still necessary to build model Requires savvy design/build Team that is proficient & familiar with 3D modeling across disciplines SUE Software has limitations on metadata access across platforms & systems that need improvement Start SUE Early & Set Expectations! Future Work & Industry Adoption

© 2015, Fiatech Thank You… Are There Any Questions? Steven P. DiBenedetto, P.G., C.P.G. Senior Geoscientist & Technology Mgr. Underground Imaging Technologies, LLC Photo Contact & More Information Adding the Underground to 3D Construction Models