MVD COOLING STATUS COOLING PLANT: -UPDATE of THE HYDRAULIC SYSTEM -INTEGRATION OF THE MVD COOLING CIRCUIT PATHS INSIDE THE PANDA AREA -DEFINITION OF THE.

Slides:



Advertisements
Similar presentations
Water Source Heat Pump Systems
Advertisements

Refrigeration Systems
PREMIX PLANTS. We offer full supply of grinding, dosing and conveying lines, starting with the intake of raw materials, through main storage tanks, grain.
Reservoirs Covered in Ch. 5 of Vickers Text
Ventricle Chamber Valve Imaging Chamber ECG Machine Aortic Compliance Chamber Buffer Chamber Secondary Compliance Chamber Flow Meter Pressure Sensors DAQ.
Actuators.
ELECTRONIC FUEL INJECTION COMPONENTS
Muhajir Ab. Rahim School of Mechatronic Engineering
Lesson 5 Fluid Systems.
High Density Cooling Air conditioning for high density applications
Engine Compartment Left Side. Oil-to-Fuel Heat Exchanger.
HEAT EXCHANGER.
Engineer Training Cooler TJ8300 / TJ8500 Cooler. Engineer Training Cooler TJ8300 / TJ8500 Confidential 2 Introduction.
EMISSION PROBE PARTS TUBE: 3/8” OD x wall Stainless Steel Length determined by pipe diameter and placement of connecting end to allow easy connection.
Vacuum system.
HOW THE DUMP RESISTOR’S TANK LOOKS LIKE COOLING OF THE LHC ENERGY EXTRACTION RESISTORS G. Peón (ST/CV), K. Dahlerup-Petersen, G. Coelingh (AT/MEL) Air.
Claudio Bortolin. 1 st June: PT100 electrical connection failure (Temp Chiller water In&Out) 1) it required an access to the cavern to be fixed 2) access.
19 May 09P. Tropea1 Fluorocarbon systems –SS1 hydraulics completed, now under commissioning –SS2 connections and sensors installation done –Pixels ready.
CPPM Pixel Evaporative Cooling Plant Description & Operation with C 3 F 8 or C 4 F 10 G. Hallewell, CPPM, Feb 07, 2005.
November 12, 2001 C. Newsom BTeV Pixel Modeling, Prototyping and Testing C. Newsom University of Iowa.
Claudio Bortolin. Drilling: – tungsten carbide tip welded on twisted ss cable – drill to operate the rotation – counter-flow at 200 mbar w/manometer to.
Claudio Bortolin 03/09/2012. SPD (RP analyses required) 1) Pump 17b replacement and leak test 2)Pressure test on the old inlet lines (technicians coming.
Launch Chameleon Plus P - More Preventive features and safety L - More Longer Lasting and robust U - More User friendly operation S - More Service friendly.
1 Thermal tests planning for mock-up TM0 Thermal tests planning for CLIC prototype module type 0 May 30th,
CM27 – 8 th July 2010 LH2 System Progress and Future Plans M Hills T Bradshaw M Courthold I Mullacrane P Warburton.
Ships Service Air System
CMS Pixels upgrade CO2 cooling transfer lines Draft spec – for introduction Paola Tropea & Hans Postema 5 December 2012.
TS-CV-Detector Cooling 22-Jan-04P. Tropea - JCOV1 Design, construction and installation of a double loop fluorocarbon 150 kW cooling plant for the CMS.
Page 1 Sapphire by pass line  Design Concept of Cooling Water System : Funnel 10 line Tank 2 10 tones Chiller -20cm tilt - 5cm distance between growers.
Status of the ATLAS ID Evaporative cooling system JCOV 25 Nov P. Bonneau TS/CV/Detector Cooling CONTENTS Overall statusOverall status Cooling plant.
A.Henriques (JCOV meeting 31/5/2001) ATLAS Calorimeter cooling project Goal: u Definition of a common frame work for the cooling of the ATLAS calorimeter.
Building 180 NORMATEF TEST FACILITY Demineralized cooling water station upgrade R. Bozzi / EN-CV.
Installation of the T600 at Fermilab CSN2, September 22,
LS1 SSD PLANS 1.Cooling always on 2.SDD/SSD Cooling plant under UPS 3.Counter flow cleaning 4.Removing Teflon 5.Check safety valves 4 Sept 2012ITS Cooling.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
Mitglied der Helmholtz-Gemeinschaft PANDA MVD Slow Control Issues Harald Kleines, Forschungszentrum Jülich, ZEA-2.
7 February 2012 Annekathrin Frankenberger (HEPHY Vienna) Open CO 2 Cooling System at the beam test Belle II SVD-PXD Meeting.
MVD COOLING STATUS-PAST AND UPDATES PIXEL COOLING PROJECT: -STUDIES and TEST on MATERIALS (Carbon Foam) -THERMAL FEM ANALYSES and TEST on DISKS and STAVES.
MVD COOLING STATUS COOLING PLANT UPDATE: -ADDITION of the NEW CIRCUITS FOR GBT AND DC-DC Converter BOARDS IN THE COOLING PLANT -THERMAL STUDY OF GBT AND.
13 Januar 2011 Immanuel Gfall (HEPHY Vienna) Annekathrin Frankenberger (HEPHY Vienna) SVD Cooling Cooling Meeting Karlsuhe.
/ 11 Updates of PANDA 3D Model CM June 2016 at GSI, MEC Session J. Lühning, GSI Updates for: Panda Hall Target Spectrometer Latest version.
MVD COOLING STATUS MVD COOLING PROJECT: CHOICE of COOLING FLUID,
MVD updates SUMMARY OF GSI OCTOBER 28th -29th
It’s…….
Update on the PSB Cooling and Ventilation Systems
Fixed Orifice Tube Cycling Clutch System (FOTCC)
Status CO2 Cooling IBBelle: Reconnection after Belle II Roll in
Government Engineering College
Installation of the T600 at Fermilab
Micro Vertex Detector of PANDA Status of Strip BARREL and DISC
Fixed Orifice Tube Cycling Clutch System (FOTCC)
Design of the thermosiphon Test Facilities 2nd Thermosiphon Workshop
ARAC/H/F Air-cooled water chillers, free-cooling chillers and heat pumps Range: kW.
Update of MVD services and requests
Beam
MVD updates SUMMARY OF GSI OCTOBER 28th -29th
FPix Cooling Circuit. FPix Cooling Circuit FPix Shared HD - Nominal Flow ΔPtotal = 5bar Δm = 0.5g/s mnominal = 2.6g/s ΔPtotal = 10bar Δm = 0.2g/s mnominal.
Forum on Tracking Detector Mechanics - Bonn, May 2016
Pixel cooling specifications
Tracker cooling loop “check out” draft for discussion
Integration – preliminary ideas on routing and tests
Cooling technology Main components and equipments
Work packages status in Torino and perspectives
Subsystems of EFI Chapter 22 Lesson 2.
Pixel CO2 Cooling Status
Detector Technology Group
Air Conditioning System-1
SNS PPU Cryomodule Instrumentation
SNS PPU Cryomodule Instrumentation
P16452 Active Reciprocating Compressor Valve Assembly
Presentation transcript:

MVD COOLING STATUS COOLING PLANT: -UPDATE of THE HYDRAULIC SYSTEM -INTEGRATION OF THE MVD COOLING CIRCUIT PATHS INSIDE THE PANDA AREA -DEFINITION OF THE PACKAGE SECTION OF ALL THE COOLING TUBE ALONG THE PATH -INSERTION OF PATCH PANELS -OPEN QUESTIONS S.COLI - DEC.20141

MVD HYDRAULIC CIRCUIT PNEUMATIC VALVES TEMPERATURE SENSORS FLOW METERS PRESURE REGULATORS HEAT EXCHANGER -PUMP -VACUUM PUMP -PLC -CONTROLS PRESSURE SENSORS COOLING PLANT PNEUMATIC VALVES S.COLI - DEC.20142

PIXEL : 42 TUBES 65 m INLET and RETURN outside the magnet 2,5 m INLET and 2,5 mt RETURN inside the magnet 2,3 m in the MVD WATER VOLUME: about 160 liters MASS FLOW RATE: about 16 lit/min STRIP : 44 TUBES 65 m INLET and RETURN outside the magnet 2,5 m INLET ad 2,5m RETURN inside the magnet 2, 7m in the MVD WATER VOLUME: about 190 liters MASS FLOW RATE: about 10 lit/min SERVICES : 64 TUBES 65 m INLET and RETURN outside the magnet 2 m INLET ad 2m RETURN inside the magnet 1 m in front of MVD WATER VOLUME: about 270 liters MASS FLOW RATE: about 30 lit/min HYDRAULIC CIRCUIT for MVD SYSTEM (PIXEL + STRIP + SERVICES): S.COLI - DEC SUMMARING About 640 lit About 56 lit/min About 75 circuits 150 Tubes TUBES FROM COOLING PLANT TO MAGNET: TUBES in STAINLESS STEEL = 0,65 m* 0,15m total section IN FRONT OF THE MAGNET DOOR (PP4) -150 Pressure sensors + tube fittings -150 Readout cables and Power supply AT THE COOLING PLANT -PLC -Tank -Vacuum pump -Inlet pump + filter -Water cleaning unit -Manifolds and 75 inlet tubes -Manifolds and 75 return tubes -Heat exchanger -75 pressure regulator, + 75 flow meters + 75 valves on return lines + 75 water Temperature sensors -150 pneumatic valves -Other sensors (tank level indicator, pump pressure sensors, water temperature sensors…)

PANDA AREA S.COLI - DEC PANDA in ASSEMBLY POSITION PANDA FINAL POSITION MVD COOLING PLANT MVD TUBES PATH

S.COLI - DEC MVD COOLING PLANT – OUTSIDE THE PIT INLET RACKS (PIXEL, STRIP, SERVICES) PLC HEAT EXCHANGER (?) 3,8 mt 3,5 mt

S.COLI - DEC MVD COOLING PLANT – IN THE PIT RETURN RACKS (PIXEL, STRIP, SERVICES) TANK+ VACUUM PUMP INLET PUMP + WATER CLEANING UTIT

S.COLI - DEC MVD COOLING SYSTEM – INLET AND RETURN TUBES PATH INSIDE PANDA AREA TUBE PAKAGE SECTION ALL ALONG THE PATH [0,65m X 0,15 m] h= 2 mt INLET LINES RETURN LINES

S.COLI - DEC MVD COOLING SYSTEM – INLET AND RETURN TUBES PATH INSIDE PANDA AREA TUBE LENGHT:~ 65 m

S.COLI - DEC MVD COOLING SYSTEM– PATCHPANELS PP1: TRANSITION (FLEX-METAL TUBES) PP2: FOR ASSEMBLY PP3: FINAL PP4: PRESSURE SENSORS AND FITTINGS, AFTER CAL INSERTION PATH ? BEFORE CAL INSERTION

S.COLI - DEC MVD COOLING SYSTEM– REQUEST 1 THE RETURN TUBES AT THE HEIGHT OF THE FLOOR? CROSSING PROBLEM?

S.COLI - DEC MVD COOLING SYSTEM– REQUEST 2 CAN THE MVD OCCUPY THE RIGHT SIDE OF THE PIT? CROSSING PROBLEM? AVAILABLE AREA?

S.COLI - DEC MVD COOLING SYSTEM – QUESTIONS Can the return tube be located on the floor along the external wall? Can the MVD cooling plant occupy the right side of the pit ? From where does the cold water arrive? AIR line at 6 bar? Where? Is the door a passage? Can we put the patch panels? The small patch panel4 on the floor held by the CAL support (charriot)? After CAL insertion, we need to cut tubes to patch panel 4 (?) The path for the flex tubes from PP3 to PP4?