Slides for TAC meeting Oct/2015 Marcelo juni Ferreira Vacuum section leader October, 2015 1.

Slides:



Advertisements
Similar presentations
Requirements Structure and Status for NCFE
Advertisements

ESS Cryogenic System Process Design Philipp Arnold Section Leader Cryogenics CEC – ICMC 2015 June 29, 2015.
The ESS vacuum team has overall responsibility for all technical vacuum systems used on the: Accelerator, Target and Neutron Scattering Instruments and.
Introduction and Charge to the Review of ESS Target building and Instrument Hall design requirements Roland Garoby November 2014, Lund
Requirements Engineering for the Accelerator Eugene Tanke Systems Engineer Workshop on Requirements Conformance for SRF.
Hydrogen system R&D. R&D programme – general points Hydrogen absorber system incorporates 2 novel aspects Hydrogen storage using a hydride bed Hydrogen.
Conceptual Design Review of the NPDGamma Experiment in Beam Line 13 Seppo Penttila NPDGamma project manager September 25, 2007 at SNS.
The ESS Cryogenics System J. G. Weisend II, P. Arnold, J Fydrych, W. Hees, J. Jurns, A. Lundmark, X. T. Su, X.L. Wang June 2015.
Peter Spiller, COLMAT-Kick off meeting, Cryo-Collimator, CERN, COLMAT Kick-off meeting CERN Peter Spiller Cryo-Collimator (Catcher) for.
Response to TAC8 and Annual Review Recommendations John Haines Head of Target Division April 2, 2014.
Progress on Remote Handling Systems TAC 12 Magnus Göhran – WPM 15 th October 2015.
Interface of FP420 to LHC FP420 meeting 28-Sep-2006.
General overview of WU : Cryogenic Distribution for Elliptical Linac Jarosław Fydrych Cryodistribution Project Engineer Preliminary Design Review,
Beam on Target Diagnostics Beam on Target Meeting 2013 March Tom Shea.
Electrical Engineering for NSS - Status and Planning- Thomas Gahl Electrical Engineering Group Leader February 26, 2014.
Status report on ICS interfaces (Accelerator, Target, NSS, CF) and related activities Miha Reščič Deputy Project Manager, ICS
ESS | title of presentation | 2012-xx-xx | name of presenter Roles and Responsibilities sub title.
ESS Vacuum Systems TAC 6 November 2012 Peter Ladd Senior Vacuum Expert.
8/29/07K. C. Wu - Brookhaven National Lab1 Major Components in ILC IR Hall Interchangeable Detectors.
Personnel Safety Systems Stuart Birch Senior Engineer, Personnel Safety Systems November 6 th, 2014.
Thomas Jefferson National Accelerator Facility Page 1 Dana Arenius Cryogenics Control Account Manager 12 GeV Upgrade Project X Collaboration September.
Accelerator/Technical Documentation and Breakdown Structure Dr. Felix Schlander Lead Engineer 20 April
ESS Vacuum Standardization
Update on the ESS monolith design Rikard Linander Monolith and Handling Group ESS Target Division TAC 10, Lund, Nov 5,
Overview of the ESS Linac Cryogenic Distribution System
Target Systems and Monolith Design Update Rikard Linander Group Leader Monolith and Handling April 2, 2014.
In-Kind Strategy Integrated Control Systems Garry Trahern Head of ICS Division TAC 9, 3 rd April, 2014, ESS, Lund.
1 IPN Orsay / Division Accélérateurs The Spoke cryomodule Vacuum aspects P. DUTHIL on behalf of the IPNO team ESS Lund February 19 th 2013.
Introduction to the Accelerator layout February 2016 Nick Gazis Mechanical Integration Lead Engineer.
ESS Cryomodule Status Meeting – Introduction | | Christine Darve Introduction to Cryomodules for the ESS 2013 January, 9 th Christine Darve.
The ESS Target Station Eric Pitcher Head of Target Division February 19, 2016.
WP 12.3 Moderator & Reflector Systems D. Lyngh, M. Kickulies, J. Ringnér, J. Jurns, M. Andersson, M. Pucilowski, T. Hedlund, A. Olsson TAC11 Lund, 1 st.
Cryoplant Controls Installation
CERN – Zanon discussions
Cryomodule test stand at ESS site
Making Difficult Decisions in a Transparent Way –
Dana M. Arenius Jefferson Laboratory Cryogenics Dept Head
LINAC4 Vacuum Control System Review
Spoke CDS PDR Closeout J. G. Weisend II June 10, 2016.
XFEL Vacuum System Commissioning
ESS Target Cryogenic System European Cryogenic Days CERN
Optimum cryomodule length at the ESS
ESS Project Status Roland Garoby – Technical Director August 2018.
ESS Freia Scope Setting ESS - Lund - 17/10/2016.
SNS PPU Cryomodule Instrumentation
Operations, Risks & Hazards
RF systems introduction
Prototype cryomodule development
Daresbury ESS In-Kind Contributions
Ion Source and LEBT control system topology, Interlock strategy
ISRC and LEBT Vacuum System Design
Progress on Standardization
Primary Spectrometer & Sample Environment
MPS commissioning at ESS
Spoke section of the ESS linac: - Status of prototypes and CDS-SL
RSFs & categorisation 20 May, 2019.
APTM and GRID interface requirement PBIP and PBW
Safety Readiness Review (SRR) Thomas Hansson, ESH
Hilko Spoelstra, Vacuum Group Specialized Technical Services / AD
Ola Ingemansson Electrical & Instrumentation Engineer
Licensing update ESHAC #7, October 2017
Test Beamline System Requirements and Charge to PDR Committee
Charge and Agenda of the 18th TAC meeting
Vacuum Control System for Monolith Vacuum
SAR MEBT Bilbao March Mats Lindroos
MRV system budget and scheduling Short overview installation
SNS PPU Cryomodule Instrumentation
Vacuum System Design for the Target Monolith System
Overview of the TARGET Monolith Rough Vacuum
General Overview of WP 12 ESS Vacuum System
Presentation transcript:

Slides for TAC meeting Oct/2015 Marcelo juni Ferreira Vacuum section leader October,

ESS Vacuum system Warm LINAC Cold LINAC Target Neutron Instruments The ESS organization charges the ESS Vacuum Group with the responsibility for all ESS “technical” vacuum systems of the Accelerator, Target and Neutron Instruments including neutron guides and choppers. The main task of the group is to support the in- kind-contributions (IKC) of the vacuum systems provided by our ESS Partners to ensure an integrated vacuum system design throughout the ESS complex. 2

3 Vacuum Standardization, an Integrated Approach Working closely with our partners across the project one of our primary goals was to promote the use of common vacuum equipment and standards. As a result a Vacuum Standardization meeting was held in February 2014 where equipment suitable for Standardization was agreed and reflected in the ESS Vacuum Handbook. An important element of this Standardization is the Procurement Policy applied for the procurement of all “major” vacuum equipment. This policy is outlined in the ESS Vacuum Handbook. The ESS Vacuum Handbook is primary a vacuum document that covers the requirements for the accelerator, target and instruments and is applicable to all ESS IKC Partners (ESS , , and ).

4 Example of Vacuum support: Warm LINAC Proton Source (PS) and Low Energy Beam Transport (LEBT) 4 Vacuum requirements agreed with the in kind for L2, L3 and L4 top-down and interfaces, including interface with other ESS groups, as ICS or Cryogenics.

5 Standardization and vacuum integrated approach: PS + LEBT Detailed list of components following the standardization model, including vacuum control signals Vacuum diagram. Vacuum control system wiring diagram, including interlock and signals.

Example of Vacuum support: Discussion on the possibility to eliminate the Proton Beam Window 6 Proton beam envelope representation Proton beam window Proton beam instrumentation plug Roots Blower Roots and/or rotary vane pumps Room above A2T and upstream of connections cell A Concept By Eric Pitcher Dep Head Target Div.

Beam expansion scheme adopted last year offers differential pumping opportunity 7 target wheel moderators connections cell helium vessel ~20 m neutron shield wall high-vacuum throughput pump 40mm diam x 2m long beam pipe By Eric Pitcher Dep Head Target Div. Monolith on HV (10 -5 mbar) following the ESS Vacuum Handbook guide lines. New updates for the ESS VH to cover the target requirements.

Instruments for standardization: Vacuum Catalog and blank orders ESS will have a Vacuum Catalog pre-approved with some suppliers. They will have off shelf items used on daily bases by the ESS users, to decrease the cost of acquisition and fast delivery, For major vacuum instruments such as turbo pumps, vacuum gauges, valves, residual gas analyzers or mass flow controller will follow a procurement- tendering process (pre-qualification documents, Statement of work and technical specification) to award suppliers on each item. 8

WP12 in kind = Daresbury/STFC 9 The ESS WP12 (Vacuum system) has a unique in kind for the cold LINAC: Daresbury Laboratory/STFC.