GEO Architecture and Data Committee Task AR-07-02 Architecture Implementation Pilot GEO Task AR-07-02 Team Representatives: - Doug Nebert, USA/FGDC - Larry.

Slides:



Advertisements
Similar presentations
GEOSS ADC Architecture Workshop Break-out summaries: Initial Operating Capability (IOC) Doug Nebert U.S. Geological Survey February 5,
Advertisements

GEOSS Architecture Implementation Pilot, Phase 3 - Call for Participation - George Percivall, Open Geospatial Consortium GEO Task AR-09-01b Task POC December.
GEOSS Architecture Implementation Pilot Water Information Services with GEOSS Interoperability Arrangements George Percivall Open Geospatial Consortium.
High level summary and recommendations from AIP-3 George Percivall Open Geospatial Consortium Task lead AR-09-01B ADC-16, May 2011.
Successful Implementations for SBAs using GEOSS Interoperability Arrangements George Percivall The Open Geospatial Consortium Jay Pearlman, IEEE Nadine.
© GEO Secretariat Agenda Item 3. GEO UPDATE. © GEO Secretariat Membership 67 members and 43 Participating Organisations – New Members:Latvia, Moldova,
Core Task Status, AR Doug Nebert September 21, 2008.
Standards and Interoperability Forum: Status, Issues & Plans GEO Architecture and Data Committee Kyoto, Japan 9 February 2009 Siri-Jodha Singh Khalsa.
GEOSS Common Infrastructure (GCI)
Geographic Interoperability Office ISO and OGC Geographic Information Service Architecture George Percivall NASA Geographic.
Slide # 1 Report to ADC AR Status Doug Nebert, POC U.S. Geological Survey.
GEOSS Community Portal Recommendations Team Report.
GEO Architecture and Data Committee Task AR Architecture Implementation Pilot George Percivall Open Geospatial Consortium Task AR Point of.
GEOSS Architecture Describes how components fit together for providing data and information that will be better …than the individual components or systems.
Page 1 LAITS Laboratory for Advanced Information Technology and Standards 9/6/04 Briefing on Open Geospatial Consortium (OGC)’s Web Services (OWS) Initiative.
Global Earth Observing System-of- Systems (GEOSS) Architectural Framework Doug Nebert FGDC, U.S. Geological Survey February 2008.
GEO Architecture and Data Committee Architecture Workshop Hosted by the European Commission At the Joint Research Centre February 2008 DRAFT.
Vision and architecture of GEOSS Information System GEOSS Design and Evolution George Percivall The Open Geospatial Consortium (OGC) GEO Task IN-05 coordinator.
GEOSS Task AR-09-01b Architecture Implementation Pilot Phase 6 (AIP-6) Bart De Lathouwer Open Geospatial Consortium (OGC) GEO-X Plenary, Geneva, Switzerland.
GEO Architecture and Data Committee Task AR Architecture Implementation Pilot George Percivall Open Geospatial Consortium GEO Task AR Point.
Slide # 1 GEO Task AR Architecture Implementation Pilot George Percivall GEO ADC Meeting, 14 & 15 May 2007.
GEOSS Architecture Implementation Pilot AIP February 2011 GeoViQua First Workshop George Percivall Open Geospatial Consortium Task Lead AR-09-01B - AIP.
AIP-2 Kickoff Workshop End-to-end use case: Discovery, access, and use with variations Doug Nebert GEOSS AIP-2 Kickoff September 2008.
ESA/FAO Contribution STATUS & PLANS ADC Full Committee Geneva 1 March 2007.
ENV proposal meeting, Geneva, Sep. 24, GCI Presentation Joost van Bemmelen, ESA
GEOSS Architecture Implementation Pilot, Phase 3 - AIP-3 Initial Concepts - Hervé Caumont George Percivall Open Geospatial Consortium GEO Task AR-09-01b.
GEO Architecture and Data Committee Task AR Architecture Implementation Pilot George Percivall September 2008.
GEOSS Common Infrastructure Internal Structure and Standards Steven F. Browdy (IEEE)
Rupa Tiwari, CSci5980 Fall  Course Material Classification  GIS Encyclopedia Articles  Classification Diagram  Course – Encyclopedia Mapping.
GEO ADC Co-Chair meeting, Tokyo, Japan, 13 May 2007 Slide # 1 Cross-GEO Coordination Report of C4 Meeting and follow-up discussion Ivan Petiteville, CEOS.
® GEOSS AIP 5 Water SBA Update HDWG June 2012 Matt Austin NOAA Stefan Fuest KISTERS Jochen Schmidt NIWA.
1 Using the GEOSS Common Infrastructure in the Air Quality & Health SBA: Wildfire & Smoke Assessment Prepared by the GEOSS AIP-2 Air Quality & Health Working.
ADC Portal & Clearinghouse GEO Architecture and Data Committee 2-3 March 2006 George Percivall OGC Chief Architect
Slide # 1 GEO Task AR Architecture Implementation Pilot George Percivall GEO ADC Meeting, 28 February & 1 March 2007.
1 ISO WAF Community Catalog Product Access Servers Registry Clearinghouse(s) GEO Portals Community Portals Users Client Apps GetCapabilities ISO
Core Task Status, AR Doug Nebert September 22, 2008.
GEOSS Common Infrastructure Initial Operating Capability Directions and Discussion Presented to GEO ADC Geneva May
1 Using the GEOSS Common Infrastructure in the Air Quality & Health SBA: Wildfire & Smoke Assessment Prepared by the GEOSS AIP-2 Air Quality & Health Working.
National Geospatial Enterprise Architecture N S D I National Spatial Data Infrastructure An Architectural Process Overview Presented by Eliot Christian.
Implementing GEOSS architecture with-and-for Users George Percivall Open Geospatial Consortium Task lead AR-09-01B.
GEOSS Common Infrastructure Access to Priority Earth Observations Data “ Sprint to Plenary” Group on Earth Observations Eighth Plenary Session - GEO-VIII.
ISWG / SIF / GEOSS OOSSIW - November, 2008 GEOSS “Interoperability” Steven F. Browdy (ISWG, SIF, SCC)
® Reference Architecture and Agile Development George Percivall OGC Chief Engineer 4 April 2014 Copyright © 2014, Open Geospatial Consortium.
Reference Architecture and Agile Development Presentation to NASA Standards Process Group Reference Architecture workshop at the ESIP Federation Meeting.
GEOSS Model Based System Engineering Challenge team report for GEOSS AIP-6 By Lawrence E. McGovern, DSC INCOSE/WYLE Aerospace/Timothy Woodard, Tellus /Kenneth.
ISWG / SIF / GEOSS OOS - August, 2008 GEOSS Interoperability Steven F. Browdy (ISWG, SIF, SCC)
GEOSS Architecture Implementation Pilot, Phase 2 (AIP-2) George Percivall, Open Geospatial Consortium GEO Task AR-09-01b Task POC 2 February 2009.
Observation Integration across Disciplines in the GEOSS Architecture Implementation Pilot George Percivall and Bart de Lathouwer The Open Geospatial Consortium.
GEO ADC Co-Chair meeting USGS, Reston, Dec Slide # 1 AR Interface implementations for GEOSS George Percivall
© 2007, Open Geospatial Consortium, Inc. Implementing the GEOSS Architecture using open standards Implementing the GEOSS Architecture using open standards.
INTRODUCTION: This report contains the results of the International Council of System Engineer (INCOSE) UML/SySML Team efforts to produce UML/SySML Architecture.
OGC’s role in GEO: Results from the Architectural Implementation Pilot (AIP) George Percivall Open Geospatial Consortium GEO Task IN-05 Coordinator
Grid Services for Digital Archive Tao-Sheng Chen Academia Sinica Computing Centre
ESA-FAO GEOPortal STATUS & PLANS
GEO Task AR Team Representatives: Doug Nebert, USA/FGDC
GEO Task AR Architecture Implementation Pilot
George Percivall, Open Geospatial Consortium
GEO Task IN-05 Architecture Implementation Pilot, Phase 5 AIP-5 Kickoff Workshop UNEP Geneva 3-4 May 2012.
AR Doug Nebert, POC-elect GEO ADC Co-Chairs Meeting,
GEO Architecture Implementation Pilot
Workplan for Updating the As-built Architecture of the 2007 GEOSS Architecture Implementation Pilot Session 7B, 6 June 2007 GEOSS Architecture Implementation.
GEOSS Architecture Implementation Pilot, Phase 2 (AIP-2)
George Percivall September 2008
Core Task Status, AR Doug Nebert September 22, 2008.
AIP-5 Kick-off Workshop Summary 3-4 May 2012, UNEP, Geneva
Closing Plenary.
GEOSS Future Products Workshop March 26-28, 2013 NOAA
Community Portal Interactions with GEOSS GEO-XII Plenary November 9, 2015 Ken McDonald/NOAA
FDA-08 FDA Whitepaper Update
Air Quality Data Systems and the GEOSS Architecture
Presentation transcript:

GEO Architecture and Data Committee Task AR Architecture Implementation Pilot GEO Task AR Team Representatives: - Doug Nebert, USA/FGDC - Larry McGovern, INCOSE/NGC - Herve´ Caumont, OGC/ERDAS - George Percivall, OGC ADC-7 May 2008

Task AR Architecture Implementation Pilot (AIP) AIP Plan for IOC Phase – Doug Nebert –Developing AIP Call for Participation (CFP) –Plans for IOC Augmentation CFP Enterprise Models – Larry McGovern CFP Information Model – Herve´ Caumont

AIP IOC Phase Themes (1 of 2) Support GEOSS Common Infrastructure –IOC Phase planned for one-year duration. –AIP to augment the IOC baseline UIC/ADC collaboration –SBAs emphasis as initially identified in Cape Town –Operational SBA functionality to support persistence Emphasize operational persistence; "persistent exemplars" ; –Operational services linked using GEOSS Architecture –Cross-application services beyond their original purpose

AIP IOC Phase Themes (2 of 2) Build on accomplishments of 2007 –Begin by updating the CFP from 2007 –Architecture Implementation Report, Dec 2007 –GEOSS User and Architecture Workshop proceedings –ADC Architecture Workshop, Feb 2008 Open Development Process for AIP –Involve GEO tasks in using IOC and architecture –AIP process is iterative; Anyone can join at anytime –Structured within a phase; e.g. kickoff, integration

AI Pilot Development Approach DevelopmentActivities Kick-offWorkshop Call for Participation ConceptDevelopment PersistentOperations(AR-07-01) Participation ArchitectureDocumentation Updates for each step Baseline AR Architecture Implementation Pilot Evolutionary Development Process Operational Baseline for next evolutionary spiral

CFP composed of three documents CFP Main Document –Master Schedule –Themes 2008 –How to respond to CFP Annex A: Development plan –Development phases; Communication Plan –Relationship to GCI task force Annex B: Architecture

CFP Annex B – Architecture Enterprise Viewpoint –Value of Earth Observations Information Viewpoint –Earth Observations schemas and encodings Computational Viewpoint –SOA services; broadcast; media distribution Engineering Viewpoint –Components types and interoperability arrangements Technology Viewpoint –Component Instances, Operational Criteria

Augmentations to IOC in the CFP SBA scenarios: collaboration of UIC and ADC Sensor Web services and components Build on Workflow and WPS from previous phase Intercalibration (TBD CEOS) Test Facility for Service Registration GEONetCast coordination Delivery of data without network or satellite links

CFP – Architecture – SBA SCENARIOS Disaster Response –Guy Sequin Air Quality –John White Biodiversity –Doug Muchoney Energy – Solar –Lionel Menard

GEO Web Site Client Tier Business Process Tier Access Tier GEOSS Web Portal GEOSS Registries Services Components Standards GEONETCast Other Services Data Access Services Model Access Services Community Portals Client Applications Requirements Community Catalogues Portrayal Services Workflow Management Processing Services Other Services GEOSS Clearinghouse Sensor Access Services CFP Architecture – Engineering Viewpoint

CFP Architecture – Operational Persistence Length of commitment –Upon registering a service, a service provider must specify the length of time for which the service will be offered (preferably ‘continuous operation’). –Consider multiple years Level of service –services are expected to be available at least 99% of the time, except when otherwise required by the nature of the service. –This allows for approximately 7 hours of down time a month –Being achieved regularly by servers, Biggest problem is network provider –Performance (perhaps by specifying number of simultaneous connections) Termination –GEO may “de-list” a server –non-functioning components of the Network will diminish the operational and marketing value of the Network in general for all participating organizations.

AIP – IOC Augmentation Phase Architecture WorkshopFebruary 2008 Call for Participation (CFP) –CFP Preparation Mar to May –CFP ReleaseJune –CFP Responses DueJuly Kickoff Workshop, 2 DaysSeptember –Hosted by USA - to be confirmed Deploy, Integrate, Test 4 mo.Sep ‘08 to Jan ‘09 GEO-V Plenary November 2008 Commit to Persistent OperationsFebruary 2009

User and Architecture Workshops for 2008 Accra, Ghana - 08 Water Security & Ecosystems Beijing, China-08 Air Quality & Health Kobe, Japan-08 Oceans & Water Quebec, Canada-08 Science Modeling & Data Policy Toronto, Canada-08 UIC workshop Boston, USA-08 Air Quality & coastal Ecosystems Spain-08 Architecture Of GEOSS Honolulu, Hawaii-08 Communications For disaster management

Coordinating Tasks

Global Earth Observation System of Systems (GEOSS) Architecture Development Using Viewpoint Specifications Lawrence McGovern, DSc International Council on Systems Engineering

Background Used UML standard for capturing architectural information as parts of viewpoint specifications 1 Developed viewpoint specifications as defined by RM_ODP standard 2 RM-ODP standard defines essential concepts required to define ODP systems in five viewpoints UML Standard provides framework for ODP systems (like GEOSS) using UML to depict five viewpoints 1 ISO/IEC 19793, ISO/IEC 10746, 56

View Point Specifications Enterprise Specification - Specifies the roles played by an IT system in its organizational environment Information Specification - Specifies system behavior to meet its objectives abstracted from implementation Computational Specification - Specifies computational structure in terms of units of functionality and distribution and their interactions Engineering Specification - Specifies the mechanisms and services to provide the distribution transparencies and meet Quality of Service (QoS) constraints required by the system Technology Specification - Specifies the hardware and software pieces from which the system is built.

Viewpoint Language Each viewpoint is associated with a viewpoint language –Enterprise Language Modeled by one or more enterprise objects Models ODP system in context of business or organization in which it operates Model has one or more enterprise objects within communities of enterprise objects that model its environment Roles are used to model users, owners and providers of information

Oil Spill Scenario Context Diagram

GEOSS Oil Spill Scenario Enterprise Specification

UML Specification of Ground Station Community

UML Specification GEOSS Catalog Community

GEOSS Catalog Processes Activity Diagram

GEOSS Oil Spill Action Plan Activity Diagram

GEOSS Oil Spill Action Plan Iteration Diagram (UML Sequence Diagram)

Enterprise Objects – Reusable for all scenarios Enterprise objects, and relationships between them, that have roles (actor or artifact), In the GEOSS Clearinghouse community are shown above. These objects can be used to represent objects of all GEOSS scenarios

GEOSS Clearing House State Diagram

Key Findings UML standard provides an excellent framework for providing thorough characterization of the GEOSS ODP system concept Views other than Enterprise View specifications of GEOSS scenarios will require integration and correlation analysis to reflect complete views Policies for GEOSS have not yet been developed for the SOS and individual scenarios Roles will have to be standardized in GEOSS Additional information available in extended presentation:

Task AR CFP Information Model Hervé Caumont ERDAS member of OGC IP Team

CFP – Architecture – Information Viewpoint Modeling Geospatial Information Geospatial information types for features, coverages, observations and maps Spatial referencing (new). Inter-calibration Registering geospatial information Metadata and Registry Information Models

Modeling Geospatial Information Map – picture of data Feature – discrete geometry, e.g., roads, boundaries Coverage – gridded data region, e.g., soil moisture, SST Observation – measurement at a location ISO feature modeling

Geospatial Information Types Features, coverages, observations and maps with data types may comply to some digital geographic product specifications Products specifications encompass scale, accuracy, quality, thematic content, encoding rules… Coordination with GEO Task DA ISO TC suite of standards provides normalization for these product aspects, e.g.: spatial schema, temporal schema, portrayal schema, coverage components and encodings…

Coordinate Reference Systems Terminology with spatial reference: –place names, spatial codes. –Valuable to have Gazetteer Coordinate Reference Systems –CRS consists of a coordinate system and a datum. –WGS84 commonly used –Registries for 1000s of CRS

Inter-calibration Why: to create the stable long-term data sets needed for monitoring climate change What: to inter-calibrate sensors on similar and different satellites. Also important is inter-calibration of satellite observations with in situ observations How: international efforts on relative calibration, channel validation, satellite radiances monitoring, absolute calibration… On-going : CEOS WGCV for GEOSS Data Quality Framework CEOS-GEO Cal/Val Portal: a Community Portal in AIP architecture

Registering geospatial information Registration of geospatial items offers the following benefits to the community: Wider use by providing international conformance recognition and public availability to potential users. Single mechanism to access information and manage temporal change (regular maintenance cycles, changes in technology), and maintain earlier versions of specified items. Standardized tags available for encoding of registered items in datasets, with support of multiple- languages.

Metadata and Registry Information Models Rising complexity of SOA deployments: –Dataset metadata (ISO 19115) –Service metadata (ISO 19119) –Feature catalogues, symbols, and many other types of artifacts (WSDL, XML Schema, BPEL, policies, XSLT, WSRP…) Need for governance of SOA artifacts –A single point of contact to enforce organizational policies –A Registry is a key service that enables SOA governance Many dependencies and relationships among artifacts: need a means for modeling a wide variety of metadata

Registry information models (ebRIM) OASIS Consortium defined the electronic business Registry Information Model (ebRIM) as a means to standardize the registration and management of distributed assets on a network : –The types of metadata and content that can be stored in an ebXML Registry. –The services and protocols for an ebXML Registry. Version 3.0 approved as OASIS standards May 2005 (ISO Standard, Part 3 and 4)

Registry information models (ebRIM)

GEO Architecture and Data Committee Task AR Architecture Implementation Pilot GEO Task AR Team Representatives: - Doug Nebert, USA/FGDC - Larry McGovern, INCOSE/NGC - Herve´ Caumont, OGC/ERDAS - George Percivall, OGC ADC-7 May 2008