JDN No. 1 EPS Electronics Power Systems Jens Dalsgaard Nielsen Section of Automation & Control Student Sat Lab Aalborg University – Denmark

Slides:



Advertisements
Similar presentations
AS Level Electricity - Circuits
Advertisements

Power Systems Design -II
Overview of this presentation: Introduction to the BLUEsat Project What are the objectives of this thesis project Overview of testing and integration.
Satellite Systems and Design By Peter Davidsen Systems Engineer, TERMA “Architecture of On-Board Systems”
Page 1 Aalborg University Communication system for the AAUSAT-II Communication System for the AAUSAT-II Kresten K. Sørensen Department.
University of Kansas EPS of KUTEsat Pathfinder Leon S. Searl April 5, 2006 AE256 Satellite Electrical Power Systems.
Introduction to Space Systems and Spacecraft Design Space Systems Design Power Systems Design -I.
Simulating A Satellite CSGC Mission Operations Team Cameron HatcherJames Burkert Brandon BobianAleks Jarosz.
Electrons Arrangement in the Atom Key words: Energy, wavelength, frequency, photon Use these terms in a sentence (s) which makes sense.
1 Electrical Power System By Aziatun Burhan. 2 Overview Design goal requirements throughout mission operation: Energy source generates enough electrical.
- Battery Pack Technical Specifications - Battery Pack Design Descriptions - Battery Pack Connection Diagram - Battery Pack Architecture EUSO-BALLOON DESIGN.
The NASA Ames PhoneSat Project Mike Safyan DCC 2011, Baltimore 9/16/11.
The Pursuit for Efficient S/C Design The Stanford Small Sat Challenge: –Learn system engineering processes –Design, build, test, and fly a CubeSat project.
Noah Garcia-Galan *Some information in this presentation comes from outside sources.
A Re-usable Software Architecture for Small Satellite AOCS Systems Authors: Associate professor Jan Dimon Bendtsen
Launching, Orbital Effects & Satellite Subsystems
08/09/2015PSC 2009 Christmas Reception1 AMSAT-UK’s first satellite.
AMSAT Fox-1 Overview AMSAT Engineering Team 2011 Space Symposium.
Renesas Electronics Europe GmbH A © 2010 Renesas Electronics Corporation. All rights reserved. RL78 Clock Generator.
USAFA Department of Astronautics I n t e g r i t y - S e r v i c e - E x c e l l e n c e Astro 331 Electrical Power Subsystem—Intro Lesson 19 Spring 2005.
Morehead State University Morehead, KY Prof. Bob Twiggs Power Systems Design
ELE22MIC Lecture 18 The AVR Sleep Modes The ATMEGA128’s Timer System
Why Design Tool? 93 年 10 月 21 日. EPS Course - 2 Simple Problems Close form solution Complex Problems Computer.
5.2.1Define electromotive force Describe the concept of internal resistance. Topic 5: Electric currents 5.2 Electric circuits.
DNR Equipment.  66 MHz processor, 32 bit  Expandable – I/O expandable with optional external I 2 C modules*  Scaleable — handles simple.
USAFA Department of Astronautics I n t e g r i t y - S e r v i c e - E x c e l l e n c e Astro 331 EPS—Design Lesson 20 Spring 2005.
Component Selection and PCB Fabrication Supervisor: Dr. Peter Driessen Presenter: Justin Curran.
JDN / No. 1 Telemetry Command & Control Jens Dalsgaard Nielsen.
Power Philip Luers NASA/GSFC Code 561 August 16-17, 2005.
Miami Beach Senior High School Mrs Diaz
ENERGY METER TO INDICATE BILLING IN RUPEES FOR LOAD WISE OR DAY WISE
SUBMITTED BY EDGEFX TEAM
Architectures of Digital Information Systems Part 1: Interrupts and DMA dr.ir. A.C. Verschueren Eindhoven University of Technology Section of Digital.
Describe why solar eclipses happen + draw a diagram to illustrate this
MODELS OF CONSUMER BEHAVIOUR
BATTERY CHARGING BY THYRISTOR TRIGGERING CONTROL
«TENSY GROUP» Moscow, Russia
Telemetry system The telemetry, tracking, and command (TT&C) subsystem performs several routine functions abroad a spacecraft. The telemetry or "telemetering"
Lesson 11: Electricity and magnetism Electric cells
Programmable Interval Timer
SUBMITTED BY EDGEFX TEAM
Collision Theory and Reaction Rate
A simple CANSAT KIT Jens Dalsgaard Nielsen
“Processing” easy coding Jens Dalsgaard Nielsen
Module 39 Solar, Wind, Geothermal, and Hydrogen
Motion and Phases of the Moon
Lesson 1: Simple Circuits
HA1L High Altitude 1U Laboratory
What is Biology? Biology A.
Motion and Phases of the Moon
Topic 5: Electricity and magnetism 5.3 – Electric cells
Potential Difference.
What is “ Matter ” ? -Anything that has mass and occupies space
Topic 5: Electricity and magnetism 5.3 – Electric cells
CubeSat vs. Science Instrument Complexity
Topic 5: Electricity and magnetism 5.3 – Electric cells
6.0 Module Operation and Specifications
JOSH STAMPS ROBIN HEGEDUS
A. The signal strength of received signals
Research about an electronic device
The FUNcube Project – the background
EagleSat 2 – Mission and Development Overview
Electron configuration explained
The Wave Nature of Light
Reducing Electrical Cost and Minimizing Downtime
Eclipses.
Launch and Operations Lessons Learned
What is “ Matter ” ? -Anything that has mass and occupies space
Presentation transcript:

JDN No. 1 EPS Electronics Power Systems Jens Dalsgaard Nielsen Section of Automation & Control Student Sat Lab Aalborg University – Denmark

JDN No. 2 EPS – Electronic Power System Be power source for whole satellite The first system to be active The last system to “die”

JDN No. 3 KISS KISS KISS Keep it Simple Stupid !!! But tendency is people forget WHY ? Because everybody rely on the powersystem Without power nothing will work May be the only sub system that run 24/7/365

JDN No. 4 Two types With or without energy storage (battery) Without battery :-) simple system, fewer components :-) minimising risk by no chemical reaction component(battery) Battery may explode/leak/... (case AAU CUBESAT) :-)System is cleaned up by reboot on every orbit(if orbit has an eclipse part) :-( Reboot on every orbit :-( No subsystem can have more power than produced A radio in TX mode can consume +2W P peak 1U ~ 1,5 W, 2U ~ 3W You may loose evening passes in winter time or all time

JDN No. 5 With battery Much (!) more complex Complex charging system Battery capacity and characteristics change a lot ! by temp.

JDN No. 6 With battery – II Battery degrade over time Most li-ion batteries has a 1000 x charge spec. On month = 465 orbits ! = 465charge cycles 2 month -> battery exceed spec's AAUSAT-II has had charge cycles

JDN No. 7 Mission success criterias Do you need batteries ? AAUSAT-II reboots 14 times a day so battery needed ? XXX-C3 had up to 3000 reboots a day – battery needed ?

JDN No. 8 EPS product suite Power 3.3V, 5,0 V Other volts ? Power budget A spreadsheet with system state Idling: eps, main obc, com system runing Beacon:.... Experiment 1: eps,.... A description of all system states incl power consumption A model describing power production as a function of Position (eclipse or not) Pointing vector towards sun Albedo effects

JDN No. 9 Pls make a system (!) state diagram

JDN No. 10 Pls make a system (!) state diagram - vrs II

JDN No. 11 EPS – product – power channels Power out to different sub systems on different channels You may switch off/on a subsystem You may be able to measure power consumption for each subs. HW: pins, connectors has limits (often < 1 A) Fuses ? In SW by supervision of current Planning When switching on you may decide when to switch off External Commands from ground Commands from other subsystem

JDN No. 12 Watch dog Sub systems may run into problems: Bit latch up (radiation) Hot components -> drift -> unstable attitude Bad components Unexpected experiment results

JDN No. 13 Case AAUSAT-II EPS PIC controller runs a 1 Mhz to be resilient to radiation. No reprogramming of flash in space Supervise Current consumption Issues watch dog communication to sub system Problems -> reboot Temperatures Whatif hothothot and it works ??? Some problems No indirectly watchdog facility No redundancy in network (canbus) Who watch the watchdog ? No system state facility

JDN No. 14 Simple solution Make power to all channels Do not care if sub systems are running or not Whatif battery is drained ? Will you be able to start again ? Hint: how will a battery react to be totally drained ???? Shutdown satellite if battery goes towards zero Or Switch off non essential energy consuming subsystems... Or ?

JDN No. 15 Advanced solution Simple plus... Current supervision Temperature supervision Watch dog facility Satellite state supervision facility More ? Simple system ? Easy to test

JDN No. 16 Keep an eye on sub systems behaviour On regulary intervals How are you? I'm fine What is 2+4 It is 6 What is yor current state ? It is 5 Up to you to select strategy

JDN No. 17