TAC Rejection of NPRR Mitigated Offer Caps for RMR Units

Slides:



Advertisements
Similar presentations
NOVEMBER 18, 2013 | WESTBOROUGH, MA Administrative Pricing Rules for Forward Capacity Auction #8.
Advertisements

Ancillary Services and SCED Jeff Gilbertson Market Analyst Congestion Management Working Group 9/4/2013.
2004 Congestion Costs. 2 Transmission Congestion Occurs when analysis shows a given outage of a transmission element (contingency) will result in the.
Texas Deregulation – A Success Story The ERCOT Market Framework Has Been A Success Implementation  Bilateral Contracts - Participants contract up to 100%
ERCOT Load Forecast Uncertainty V2 August 2, 2006.
Costs of Ancillary Services & Congestion Management Fedor Opadchiy Deputy Chairman of the Board.
Valuing Economic Benefits from Transmission Planning ERCOT System Planning March 22, 2006.
1 PRR 776 in the Context of the ERCOT Market Design Eric S. Schubert Regulatory Affairs Advisor BP Energy Company.
Demand Response in Midwest ISO Markets February 17, 2008.
ERS Procurement Methodology 09/04/2013 ERS Workshop Presented By: ERCOT Staff.
THE PJM INTERCONNECTION STATE OF THE MARKET REPORT 2001 Joseph E. Bowring Manager PJM Market Monitoring Unit Federal Energy Regulatory Commission June.
CMSC Rules Changes under Consideration Market Operations Standing Committee December 3, 2003 PUBLIC.
1 Demand Response in Midwest ISO Markets 09 February 2007.
1 Capacity Markets Investment in Generation Capacity Payments October 31, 2005 J. W. Charlton.
1 WMS Report To TAC September In Brief Four Working Group Reports Four Working Group Reports One Task Force Report One Task Force Report Three.
LAREDO PLANT RMR EXIT STRATEGY Presentation to Board of Directors March 16, 2004 Transmission Services Operations.
January 21, 2010 Security Constrained Economic Dispatch Resmi Surendran.
Economic Planning – Theory and Current Practice Dan Woodfin Director, System Planning Joint PLWG/CMWG Meeting 2/4/2011.
Discussion of Reliability Must-Run (RMR) Protocol Provisions ERCOT Technical Advisory Committee November 6, 2002.
CMWG Update to WMS Report of CMWG Meeting of M Wagner Edison Mission Marketing & Trading.
Evaluation of Historical and Proposed Alert and EECP Pricing True North Associates 1.
1 Reliability Deployment Task Force (RDTF Meeting) December 20 th 2011 December 20, 2011.
Unit-Specific Bid Limits based on Modified Generic Cost.
Appeal of PRS Action NPRR 351, Calculate and Post Projected Non-Binding LMPs for the Next 15 Minutes Floyd Trefny Texas Steel Companies.
1 TAC Report to the ERCOT Board February 21, 2006.
2% Shift Factor rule and associated price discrepancies Kris Dixit 1.
SPP.org 1. Status Update for Reliability and Economic Assessments Stakeholder Meeting September 16, 2008 Austin, TX.
Wholesale Market Subcommittee Update May 2 nd, 2013 Technical Advisory Committee.
Floyd Trefny, P.E. Director of Wholesale Market Design Nodal Market Tools to Manage Wind Generation January 29, 2009 Presentation to the Renewables Technology.
Grid Operations Report To ERCOT Board Of Directors December 16, 2003 Sam Jones, COO.
ERCOT CSC – Vote “Yes” to 3b Jan A. Bagnall Sr. Director Transmission, Reliability & Compliance October 2008.
CMWG NATF 11/02/2010- CCT/DME update + Outages in the CRR Model follow-up Steve Reedy – Market Design and Analysis 1.
To Buy or To Build Is it really one or the other? APPA New Generation Workshop Portland, Oregon August 1, 2007.
Business Case NPRR 351 Floyd Trefny Amtec Consulting Brenda Crockett Champion Energy Services.
1/07/2014 QMWG – RUC and AS update QMWG – ERCOT Update ERCOT Market Analysis.
NPRR 649 Addressing Issues Surrounding High Dispatch Limit (HDL) Overrides Katie Coleman for Air Liquide (Industrial Consumer) ERCOT Board February 9,
Appeal of Proposed Real Time Market Mitigation Measures Texas Nodal Market May 18, 2004.
2% Shift Factor dispatchable rule discussion and alternatives for the 2% rule Kris Dixit 1.
RDTF June 1, Purpose “The effect of the Shadow Price cap for the Power Balance Constraint is to limit the cost calculated by the SCED optimization.
NPRR 520 Resmi Surendran ERCOT. Current CCT Process Annual CCT (ACCT) is run every year to feed the results to Monthly CCT (MCCT) MCCT is run every month.
RCWG Update to WMS March 7, Draft NPRR, Caps and Floors for Energy Storage Resources Chair of ETWG gave high level overview ERCOT had questions.
2004 CSCs & Zones. Goals for 2004 Increase ERCOT market efficiency Reduce out-of-merit energy and capacity deployments Reduce uplift of local congestion.
2009 ERCOT CSCs and Congestion Zones (10/8/08) C. Richard Ross American Electric Power Service Corporation.
Proposal for Consideration Regarding Holistic Solution to Congestion Irresolvable in SCED Issue:How do you identify when constraint is irresolvable Proposal:Adopt.
1 ECONOMIC TRANSMISSION PLANNING Wholesale Market Subcommittee March 22, 2006 CMWG Proposal #1.
Proposed Market Solution for Bates RMR Exit Strategy Frontera Power Station.
Technical Advisory Committee Presentation to the ERCOT Board of Directors April 18, 2007.
NPRR784 Mitigated Offer Caps for RMR Units Protocol Revision Subcommittee June 16,
ERCOT Market Education Market Role in Emergency Operations OTS 2016.
Bad Moon Rising in ERCOT RMR 1. “So you're going to be talking in a minute about an RMR contract in Houston, and that should concern you.” “…what other.
Wind Management at MISO
NPRR833 Workshop: Contingency Processing in CRR, DAM and SCED
TAC Report to the ERCOT Board
Appeal of PRS Rejection of NPRR 667
PRS Rejection of NPRR Mitigated Offer Caps for RMR Units
Southern Cross Directives Planning Items
Pilot Project Concept 30-Minute Emergency Response Service (ERS)
TAC Report to the ERCOT Board
ERCOT – Southern Cross Transmission ROS/WMS Working Group Assignments
A Midsummer Night’s DREAM
Interpreting DREAM NPRR 777.
NPRR829 Incorporate Real-Time Telemetered Net Generation for Non-Modeled Generation into the Real-Time Liability Estimate ERCOT PRS Meeting May 11, 2017.
The New Texas Wholesale/Retail Market
Regional Transmission Organizations
Transmission: the Critical Link
penetration of wind power
New England Resource Adequacy
FERC Order in Devon Power LLC, et al. ER
Market Pricing Initiatives Update September 9th, 2003
10 Years Later: Rethinking the Role of Distribution Utilities
Presentation transcript:

TAC Rejection of NPRR 784 - Mitigated Offer Caps for RMR Units TAC Advocate Presentation Phillip G. Oldham for Air Liquide

NPRR 784 Overview Today, when there is inadequate competition in a local area due to transmission constraints, all generator offers in that area are mitigated. This is consistent with PUC Subst. R. 25.502(f)(3), which specifically states that “a noncompetitive constraint will not be treated as a competitive constraint.” This treatment applies equally to Reliability Must Run (RMR) units, and it always has. In competitive scenarios, where transmission is not overly constrained, RMR units are offered at $9,000/MWh under either the status quo or NPRR 784. Under current mitigation practices, Greens Bayou 5 (GBY5) would be offered at around $50- $60/MWh. When it is offered at that price, it will be used solely to resolve congestion caused by a temporary lack of transmission into Houston—not for overall system capacity. NPRR 784 would instead require all RMR units, including GBY5, to be offered at the highest possible price that would still allow SCED to dispatch the unit for congestion in noncompetitive situations. This is in the $600-800/MWh range for GBY5. When GBY5 is used for congestion, this price would be paid to all generators in the area.

NPRR 784 is inconsistent with the ERCOT market design. Punitive to Loads. Customers should not be exposed to scarcity pricing without a valid purpose. The GBY5 RMR is temporary and will only be in place until the Houston Import Project is built. Pricing it at exorbitant prices serves no valid purpose—resource adequacy or otherwise. No resources will be developed or kept online purely in response to these temporary high prices. Customers are paying more than $60 million for the Greens Bayou 5 RMR unit to maintain local reliability until the Houston Import Project is in service. Customers should not be forced to pay $600-800/MWh (to the RMR unit and all other generators in the area) to use the unit for local reliability. Rewards Efforts to Balkanize the ERCOT Market. Generators do not build significant new generation in load pockets based on localized congestion pricing. This is because significant new generation will eliminate those profits. ERCOT has, therefore, historically planned robust transmission to facilitate overall resource adequacy by promoting competition and incentivizing new build based on market fundamentals. NPRR 784 would reward generators for fighting transmission and Balkanizing the market by using RMR units to provide scarcity pricing for other local generation. This would allow generators to do with an RMR unit what they could not do otherwise because of market power protections. Unduly Limits ERCOT’s Ability to Use the RMR to Maintain Reliability. NPRR 784 also precludes an GBY5 from being used to solve any constraint other than Singleton-Zenith. GBY5 was put under an RMR contract to solve multiple other constraints. NPRR 784 would prevent loads from getting the fair value of the contract and limit ERCOT’s ability to use the unit to maintain reliability.

There is no valid justification for NPRR 784 1. NPRR 784 does not support resource adequacy objectives. GBY5 is an RMR for local reliability, not system-wide capacity. Local RMR is a temporary substitute for transmission. If there were adequate import capability into Houston, there would be no need for the RMR because customers would have access to ample generation from outside the Houston Zone. It is inappropriate to treat the RMR like an ancillary service unit or allow it to set scarcity prices in non-competitive circumstances. The Houston Import Project is already the “exit strategy” for the GBY5 RMR. Using the RMR to set high prices in Houston between now and 2018 will not incentivize new resources because a transmission solution is already in process. Customers should not be punished with high prices purely due to the lead time on new transmission. High prices in Houston suppress prices in the North Zone, which undermines signals to develop new resources outside of Houston. This is much more detrimental to overall resource adequacy. Generation is built based on market fundamentals, not transient high prices in a load pocket.

There is no valid justification for NPRR 784 2. NPRR 784 is inconsistent with ERCOT’s scarcity pricing regime. When there is insufficient competition we do not allow out of market pricing. Again, PUC Subst. R. 25.502(f)(3) specifically provides that noncompetitive transmission constraints shall not be treated as competitive. Customers have always been protected by offer mitigation in this situation. NPRR 784 only applies in non-competitive situations by definition. RMR units are dispatched last (and at $9,000/MWh) when there is adequate competition and the unit is being dispatched for system capacity. NPRR 784 is an effort to inappropriately create scarcity pricing in a non- competitive situation that does not promote system-wide resource adequacy, but rewards generators for perpetuating load pockets and Balkanization of the grid.

There is no valid justification for NPRR 784 3. NPRR 784 is not necessary to minimize RMR run-time and uplift. The RMR contract already limits the periods where GBY5 can be used, effectively minimizing the overall cost to customers. There has been no analysis to show that running the unit less often and at a higher price will maximize revenue offsets for the RMR contract. Running the unit more often, and at a lower price, could provide a greater revenue offset. Even if there were significant benefits, those could be obtained through other methods of dispatching the RMR unit last. It is not necessary to price the unit at $600-800/MWh.

CONCLUSION: PRS and TAC both rejected NPRR 784. The ERCOT Board should give weight to this important stakeholder input. The RMR protocols are being holistically reviewed. Any issues related to the proper pricing of RMR units will be revisited through those discussions. The Board should reject NRG’s appeal.