Contract: EIE/07/069/SI2.466698 Duration: October 2007 – March 2010Version: July 7, 2009 How does ventilation impact global energy consumption- EN 15241.

Slides:



Advertisements
Similar presentations
Lecture Objectives: Model HVAC Systems –HW3 Asignemnet Learn about eQUEST software –How to conduct parametric analysis of building envelope.
Advertisements

Announcements Midterm Project Prepare groups of 3 to 4 students You can submit the list at the end of next class Midterm Exam 03/09/10 - In class Exam:
DESIGN AND CONSTRUCTION OF AN
World Health Organization
Lecture Objectives: Specify Exam Time Finish with HVAC systems –HW3 Introduce Projects 1 & 2 –eQUEST –other options.
The EWZ building Presentation of the building Presentation of the building The design issue The design issue The building concept The building concept.
World Health Organization
Lecture Objectives: Clarify issues related to eQUEST –for midterm project Learn more about various HVAC - economizer - heat recovery Discuss about the.
European Commission IDEAS - New Delhi 14 April 2005 European Commission DG Budget – Evaluation Unit.
Final Project Presentation On Monday, same classroom at noon PowerPoint (5 minutes presentation) Upload the file before the class Approximately 6-7 slides.
1 IRES, version 0: an overview Vladimir Markhonko United Nations Statistics Division The Oslo Group on Energy Statistics Fifth meeting, Cork, Ireland,
International Recommendations for Energy Statistics (IRES): A progress report Fourth Meeting of the UN Committee of Experts on Environmental-Economic Accounting.
Development of a new Building Energy Model in TEB Bruno Bueno Grégoire Pigeon.
Heat Pumps Presentation by: Rana Itani. Objective To familiarize audience on the components of a heat pump and how it works.
Contract: EIE/07/069/SI Duration: October 2007 – March 2010Version: July 7, 2009 Calculation of the integrated energy performance of buildings.
Contract: EIE/07/069/SI Duration: October 2007 – March 2010Version: July 7, 2009 Calculation of the integrated energy performance of buildings.
Contract: EIE/07/069/SI Duration: October 2007 – March 2010Version: March 2010 The series of EN ISO standards on thermal transmission properties.
Contract: EIE/07/069/SI Duration: October 2007 – March 2010Version: Nov. 30, 2009 Calculation of the integrated energy performance of buildings.
Contract: EIE/07/069/SI Duration: October 2007 – March 2010Version: March 2010 The common definitions and common symbols for EPBD related CEN standards.
Contract: EIE/07/069/SI Duration: October 2007 – March 2010Version: July 7, 2009 Calculation of the integrated energy performance of buildings.
Contract: EIE/07/069/SI Duration: October 2007 – March 2010 Calculation of the integrated energy performance of buildings EN 15316: Heating systems.
Contract: EIE/07/069/SI Duration: October 2007 – March 2010Version: March, 2010 Energy performance certification for new and existing buildings.
Contract: EIE/07/069/SI Duration: October 2007 – March 2010Version: July 7, 2009 Ventilation for buildings - Calculation methods for the determination.
Contract: EIE/07/069/SI Duration: October 2007 – March 2010Version: Nov. 30, 2009 EN 15459: Energy performance of buildings – Economic evaluation.
Contract: EIE/07/069/SI Duration: October 2007 – March 2010Version: July 8, 2009 EN ISO 13790, Energy performance of Buildings – Energy use for.
Contract: EIE/07/069/SI Duration: October 2007 – March 2010Version: July 7, 2009 Ventilation for buildings Energy performance of buildings Guidelines.
Contract: EIE/07/069/SI Duration: October 2007 – March 2010Version: July 7, 2009 Ventilation for non-residential buildings - Performance requirements.
Contract: EIE/07/069/SI Duration: October 2007 – March 2010Version: July 7, 2009 Calculation of the integrated energy performance of buildings.
Contract: EIE/07/069/SI Duration: October 2007 – March 2010Version: Nov. 30, 2009 Calculation of the integrated energy performance of buildings.
Contract: EIE/07/069/SI Duration: October 2007 – March 2010Version: July 7, 2009 Calculation of the integrated energy performance of buildings.
Contract: EIE/07/069/SI Duration: October 2007 – March 2010Version: January 18, 2010 A vehicle to energy-efficient lighting EN 15193: Energy performance.
Contract: EIE/07/069/SI Duration: October 2007 – March 2010Version: Nov. 30, 2009 How to integrate the CEN-EPBD standards in national building.
Contract: EIE/07/069/SI Duration: October 2007 – March 2010Version: January 14, 2010 The effects of passive heating and cooling on the energy performance.
Lecture Objectives: Review Psychrometrics Introduce Air Handling Unit
Contract: EIE/07/069/SI Duration: October 2007 – March 2010Version: March, 2010 Measured energy performance of buildings: CEN standards EN
Contract: EIE/07/069/SI Duration: October 2007 – March 2010Version: July 7, 2009 Calculation of the integrated energy performance of buildings.
Field Trip Time: Tomorrow (Tuesday) 8 am Duration 1 hour (you will be back latest at 10 am) Location Texas State University: Round Rock
Design & Analysis of Psychrometric Processes Various ways of Generating A Comfort… BY P M V Subbarao Associate Professor Mechanical Engineering Department.
Announcements Next class is the course evaluation
Lecture Objectives: Discuss HW3 parts d) & e) Learn about HVAC systems
Maria’s Restaurant Chapter 1 Section 4
Space heating emission systems EN : Emission and control
Indoor Environmental Criteria for Design and Calculation of Energy Performance of Buildings – EN15251 Bjarne W. Olesen International Centre for Indoor.
Kees Arkesteijn ISSO/the Netherlands
Johann ZIRNGIBL CSTB / France
The Data Center Challenge
Gerhard ZWEIFEL HSLU / Switzerland
Jürgen Schilling Viessmann Werke
Assessment of the Evaluation Culture
Brief introduction to the CENSE project and the CEN-EPBD standards Dick van Dijk (TNO, project coordination) TNO Built Environment.
HVAC Basics Arkan Arzesh HVAC – Heating, Ventilation, Air-conditioning.
Laurent SOCAL Ediclima s.r.l. / Italy
Lecture Objectives: Discuss HW3 parts d) & e) Learn about HVAC systems
Voyager II and III – Energy Recovery Modules
Standard on competence of persons in the R/AC/HP sector
Optimisation of Support Schemes for Renewable Energy Sources for Electricity Generation, Heating and Cooling Summary Slides Contract Number: EIE
Consultation LG members 2 papers in November 2006
About OI-Net.
SSG on Climate Change and Water SCG meeting May 2008 Marieke van Nood, Unit D.2, DG Environment, European Commission.
Lecture Objectives: Review Psychrometrics Introduce Air Handling Unit
Ag.11 Extra-EU CC currently in application
WP4 Proposed Structure of the Outcome “Tool Kit and Recommendations”
DG Environment, Unit D.2 Marine Environment and Water Industry
‘‘ BUILDING AUTOMATION’’
Extension of the European statistical programme Roadmap
Contractual and Regulatory Framework
United Nations Statistics Division
DG Environment, Unit D.2 Marine Environment and Water Industry
Task Force Peer reviews and quality Eurostat
Presentation transcript:

Contract: EIE/07/069/SI Duration: October 2007 – March 2010Version: July 7, 2009 How does ventilation impact global energy consumption- EN Hicham LAHMIDI CSTB / France

slide 2 Outline The EU CENSE project Scope of the Standard Principle of the methods Energy impact of the ventilation devices

slide 3 The EU CENSE project (Oct March 2010) Aim of the project: To accelerate adoption and improved effectiveness of the EPBD related CEN- standards in the EU Member States These standards were successively published in the years and are being implemented or planned to be implemented in many EU Member States. However, the full implementation is not a trivial task Main project activities: A.To widely communicate role, status and content of these standards; to provide guidance on the implementation B.To collect comments and good practice examples from Member States aiming to remove obstacles C.To prepare recommendations to CEN for a “second generation” of standards on the integrated energy performance of buildings

slide 4 Brief introduction A brief introduction to the CENSE project and the CEN-EPBD standards is provided in a separate presentation:

slide 5 More information More information and downloads: Disclaimer: CENSE has received funding from the Community’s Intelligent Energy Europe programme under the contract EIE/07/069/SI The content of this presentation reflects the authors view. The author(s) and the European Commission are not liable for any use that may be made of the information contained therein. Moreover, because this is an interim result of the project: any conclusions are only preliminary and may change in the course of the project based on further feedback from the contributors, additional collected information and/or increased insight.

slide 6 Scope of the Standard EN This standard aims to calculate : The air characteristics of the supply air The power required for air treatment The air characteristics of the supply air The air temperature The air humidity The air flow

slide 7 Principles of the methods For each system covered by the standard, the method provides the relation between the air characteristics before and after a component in the system, with or without air treatment and the power required if there is an air treatment. The components in the systems taken into account are : Ducts, Fans, Heat exchangers, Mixing boxes, Pre-heating devices, Pre-cooling devices, Humidifiers, Dehumidifiers. The standard describes three methods : A hourly method A monthly method A statistical method

slide 8 Energy impact of……… 1- Duct heat losses The standard takes into account : The position of the duct (inside or outside the conditioned area) The flow rates in the duct calculated according to EN 15242: The heat loss from the duct to the surrounding in W/K (conduction losses) Impact on air characteristics Description of the calculation of No variation on the air humidity No variation on the air flow Impact on energy consumption There is no power required

slide 9 2- Fan The standard takes into account : The type of system (VAV, DCV) The fan power in W The fan recovered ratio The air density The air specific heat The air flow through the fan The regulation of the fan. Impact on air characteristics Description of the calculation of No variation in air humidity The air flow through the fan is given by a design calculation Impact on energy consumption The power required depend on the air flow through the fan

slide Heat exchanger The standard takes into account : Defrosting issues and its associated heat power Free-cooling-limitation of supply temperature Impact on air characteristics The variation of supply air temperature There is no modification on air humidity There is an air flow variation through the heat exchanger Impact on energy consumption The power required by defrosting devices

slide Mixing boxes The input data : The ratio of recirculation air in supply air There is no air treatment considered in the mixing boxes

slide Pre-heating The pre-heating calculation takes into account the set value of the temperature. Impact on air characteristics The temperature is fixed to the set value The air humidity is unchanged The air flow is unchanged Impact on energy consumption The power needed for preheating is directly calculated 6- Pre-cooling The input data : The set value of air temperature Impact on air characteristics The temperature is set value when the systems is on The air humidity variation is calculated The air flow is unchanged Impact on energy consumption The formula for the pre-cooling power is similar to the pre-heating, with one exception: it includes also air humidity.

slide Humidifying air in winter The input data : The set value of air humidity Impact on air characteristics The temperature is unchanged by the device The air humidity variation is calculated The air flow is unchanged by this system Impact on energy consumption The air flow rate through the humidifying device The required air humidity. 8- Dehumidification The approach is the same as for the cooling calculation and pre-heating calculation. The standard introduces a bypass factor for the cooling coil.

slide 14 Conclusion This standard provides flexible methods to calculate the power needed for air treatment systems in buildings.

slide 15 More information More information and downloads: Disclaimer: CENSE has received funding from the Community’s Intelligent Energy Europe programme under the contract EIE/07/069/SI The content of this presentation reflects the authors view. The author(s) and the European Commission are not liable for any use that may be made of the information contained therein. Moreover, because this is an interim result of the project: any conclusions are only preliminary and may change in the course of the project based on further feedback from the contributors, additional collected information and/or increased insight.