Process Knowledge Playback Maintenance Project Presented By- Alka Mehta(885026) Arpit Saran(838563) Kirti Singh(883796) Kumari Meenu(840291) Rishabh Jha(835286)

Slides:



Advertisements
Similar presentations
Process and Product Quality Assurance (PPQA)
Advertisements

SERVICE MANAGER 9.2 PROBLEM MANAGEMENT TRAINING JUNE 2011.
MODELING THE TESTING PROCESS Formal Testing (1.0) Requirements Software Design Risk Data Approved, Debugged, Eng. Tested Code Automated Test Tools Tested.
More CMM Part Two : Details.
A A A N C N U I N F O R M A T I O N T E C H N O L O G Y : IT OPERATIONS 1 Problem Management Jim Heronime, Manager, ITSM Program Tanya Friehauf-Dungca,
ITIL: Service Transition
Stepan Potiyenko ISS Sr.SW Developer.
Root Cause Analysis Procedure (IMSP525) Training
Dr. Wolfgang J. Schneider FUNDAMENTAL TEST PROCESS Dr. Wolfgang J. Schneider 2003 – 2006.
Release & Deployment ITIL Version 3
 A project is “a unique endeavor to produce a set of deliverables within clearly specified time, cost and quality constraints”
S/W Project Management
PMP® Exam Preparation Course
Copyright 2005 Welcome to The Great Lakes TL 9000 SIG TL 9000 Requirements Release 3.0 to Release 4.0 Differences Bob Clancy Vice President, BIZPHYX,
Page 1 MODEL TEST in the small GENERALIZE PROGRAM PROCESS allocated maintenance changes management documents initial requirement project infrastructure.
MSF Deployment Phase. MSF Deployment Phase Tasks Starting the deployment Going Live Stabilizing the deployment Transferring ownership to operations Closing.
Software Inspection A basic tool for defect removal A basic tool for defect removal Urgent need for QA and removal can be supported by inspection Urgent.
Formal and Informal Peer Reviews
© Mahindra Satyam 2009 Defect Management and Prevention QMS Training.
Phil Cronin Anne Hill Allen Schones CIS841 Summer on Campus 1998 IN-PROCESS INSPECTIONS FOR OBJECT ORIENTED DESIGNS.
Independent User Acceptance Test Process (IUAT)
Roles and Responsibilities
CEN rd Lecture CEN 4021 Software Engineering II Instructor: Masoud Sadjadi Phases of Software.
© Mahindra Satyam 2009 Proposal Handling QMS Training.
Project Tracking and Monitoring QMS Training. 2 Objective To track and monitor the progress of the project and take appropriate corrective actions to.
Georgia Institute of Technology CS 4320 Fall 2003.
Page 1 TEST in the large RELEASE REWORK ASSESS packaged application documentation models and source code management documents requirement alloc. matrix.
Inspection and Review The main objective of an Inspection or a Review is to Detect Defects. (Today -there may be some other goals or broader definition.
Project management Topic 1 Project management principles.
Software Quality Assurance SOFTWARE DEFECT. Defect Repair Defect Repair is a process of repairing the defective part or replacing it, as needed. For example,
Objectives Understand Corrective, Perfective and Preventive maintenance Discuss the general concepts of software configuration management.
QMS Training TM Module.
Management of Software Project CSM Review By:Nafas.
Introduction to ITSM processes. CONFIDENTIAL Agenda Problem Management  Overview  High Level process Change Management  Overview  High Level process.
BSBPMG501A Manage Project Integrative Processes Manage Project Integrative Processes Project Integration Processes – Part 2 Diploma of Project Management.
6/6/ SOFTWARE LIFE CYCLE OVERVIEW Professor Ron Kenett Tel Aviv University School of Engineering.
The Project Management Process Groups
CMMI for Services, Version 1.3 Speaker: Business Excellence Date:
Project Management PTM721S
Introduction for the Implementation of Software Configuration Management I thought I knew it all !
ITIL: Service Transition
Software Project Configuration Management
Software Quality Control and Quality Assurance: Introduction
Causal Analysis & Resolution (CAR) Support Category
Software Configuration Management (SCM)
Software Quality Engineering
Software Verification and Validation
Software Configuration Management
Software Quality Engineering
TechStambha PMP Certification Training
Software Quality Assurance
Development Projects / Analysis Projects / On-site Service Projects
CMMI – Staged Representation
Quality Management Systems – Requirements
Engineering Processes
Guidance notes for Project Manager
Inspection and Review The main objective of an Inspection or a Review is to detect defects. (Not for Giving Alternative Solutions) This activity and procedure.
Adaptive Product Development Process Framework
Engineering Processes
Project Management Group
Manage Business Continuity Introductory Brief
Configuration Management
Testing Workshop.
Service Delivery and Support Program Update – June 27, 2018
Executive Project Kickoff
Software Reviews.
3. Software Quality Management
Presentation transcript:

Process Knowledge Playback Maintenance Project Presented By- Alka Mehta(885026) Arpit Saran(838563) Kirti Singh(883796) Kumari Meenu(840291) Rishabh Jha(835286) Suraj Singh(847365)

A banking customer maintains their credit management system by a 15-member internal IT team. Customer decides to outsource the maintenance of credit management system to TCS. Maintenance Project

Maintenance Process Identify and Manage Problems Handle Change Requests Update Maintenance/ Support manual Conduct Review Meeting with ClientsPerform Support Process for Service Delivery Project Start-up Transition Wind Up Manage Incidents

Project Start-Up Identify and Manage Problems Handle Change Requests Update Maintenance/ Support manual Conduct Review Meeting with ClientsPerform Support Process for Service Delivery Project Start-up Transition Wind Up Manage Incidents

ENTRY: - Formal intimation from customer to start the project - The Contract has been authorize - Due Diligence Report is available - The common entry criteria have been fulfilled TASKS: - Handover from sales to delivery - Project initiation - Build team - Prepare project plan Project Start-Up

VALIDATION AND VERIFICATION - Review of detailed plan for the transition - Review of project plan EXIT CRITERIA - Work order is authorized - Project plan is released - Start-up requirement checklist is updated - Sales to delivery sign off completed - Project start-up sign off phase completed Project Start-Up

Transition Identify and Manage Problems Handle Change Requests Update Maintenance/ Support manual Conduct Review Meeting with ClientsPerform Support Process for Service Delivery Project Start-up Transition Wind Up Manage Incidents

ENTRY: - Detailed plan for transition is available - Items to be maintained are available - Environment requirements identified TASKS: - Study current practices and procedures - Formulate maintenance/support procedures - Set up environment - Perform pilots and training for inducted members Transition

VALIDATION AND VERIFICATION - Review maintenance and induction manual - Review initial baseline - Review project plan EXIT CRITERIA - SLAs are agreed upon - Maintenance/Support manual released - Maintenance/Support environment for transition is set up Transition

Manage Incidents Identify and Manage Problems Handle Change Requests Update Maintenance/ Support manual Conduct Review Meeting with ClientsPerform Support Process for Service Delivery Project Start-up Transition Wind Up Manage Incidents

ENTRY: - Incident repository, maintenance manual etc. is available - Incident is reported to/identified by the team - SLAs are available - Change management tool is available TASKS: - Log the incident and assign to team member - Prioritize the incident - Monitor SLA cases and re prioritize incidents - Keep user informed about status of the incident - Handle the incident Manage Incidents

VALIDATION AND VERIFICATION - In case of code fix, - Review incident - Test solution to the incident EXIT CRITERIA - Close incident by validating its correctness Manage Incidents

Identify and Manage Problems Identify and Manage Problems Handle Change Requests Update Maintenance/ Support manual Conduct Review Meeting with ClientsPerform Support Process for Service Delivery Project Start-up Transition Wind Up Manage Incidents

ENTRY: - Problem is assigned to the maintenance team - KEDB (Known Error Database) is accessible to the team members TASKS: - Study incident or potential issues - Analyze repeatedly occurring incidents - Prioritize the problems - Remove entry from KEDB on closure Identify and Manage Problems

VALIDATION AND VERIFICATION - On closure of the error - Review error - Test solution EXIT CRITERIA - Problem has been closed Identify and Manage Problems

PROJECT INITIATION (Roles of various actors) 1. Delivery Manager/group leader - Acknowledge complainant - Analyze causes for complaint - Ensure legal formalities for maintenance - Analyze, prioritize and resolve complaint as per criticality and SLA - Perform handover 2. Delivery Assurance Group (DAG) - Select project ID, review and authorize project plan - Ensure induction and training of project lead and team members Activities For Project Start-Up

3. Project Leader - Analyze and prioritize problems and defects - Assign roles and responsibilities to team members - Ensure project according to all legal clauses - Conduct project review meetings - Update changes in project - Consulting delivery of items to customer Activities For Project Start-Up

1. Opportunity Owner - Brief delivery manager on handover - Identify and invite relevant stakeholders - Intimate project win - Conduct induction meetings 2. Project Leader - Identify and invite relevant stakeholders - Conduct and record Minutes of Meeting (MOM) - Track action items to closure Project Start-Up Meeting With Customer (Roles Of Various Actors)