RDR Controls Design Walk- Through Controls and LLRF EDR Kick-Off Meeting August 20-22, 2007.

Slides:



Advertisements
Similar presentations
1 Chapter 11: Data Centre Administration Objectives Data Centre Structure Data Centre Structure Data Centre Administration Data Centre Administration Data.
Advertisements

Wednesday July 19 GDE Plenary Global Design Effort 1 Instrumentation Technical System Review Marc Ross.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Shielding Workshop S. Buda Personnel Protective Systems March 27, 2007.
Argonne National Laboratory is managed by The University of Chicago for the U.S. Department of Energy ILC Controls Requirements Claude Saunders.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
DCS LEB Workshop ‘98, Rome, Detector Control System, H.J.Burckhart,1 Detector Control System H.J Burckhart, CERN u Motivation and Scope u Detector and.
Distributed Control Systems Emad Ali Chemical Engineering Department King SAUD University.
LCLS-II Linac LLRF Control System – L1, BC1 Zheqiao Geng Final Design Review May 7, 2012.
SNS Integrated Control System EPICS Collaboration Meeting SNS Machine Protection System SNS Timing System Coles Sibley xxxx/vlb.
IMPROUVEMENT OF COMPUTER NETWORKS SECURITY BY USING FAULT TOLERANT CLUSTERS Prof. S ERB AUREL Ph. D. Prof. PATRICIU VICTOR-VALERIU Ph. D. Military Technical.
ILC Control and IHEP Activity Jijiu. Zhao, Gang. Li IHEP, Nov.5~7,2007 CCAST ILC Accelerator Workshop and 1st Asia ILC R&D Seminar under JSPS Core-University.
NCSX NCSX Preliminary Design Review ‒ October 7-9, 2003 G. Oliaro 1 G. Oliaro - WBS 5 Central Instrumentation/Data Acquisition and Controls Princeton Plasma.
XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser Stefan Simrock, DESY LLRF-ATCA Review, Dec. 3, 2007 Requirements for the ATCA based LLRF.
Topics of presentation
Controls & LLRF ILC Controls Telecon August 17, 2006 John Carwardine RDR Report Writing.
Operations, Test facilities, CF&S Tom Himel SLAC.
Eugenia Hatziangeli Beams Department Controls Group CERN, Accelerators and Technology Sector E.Hatziangeli - CERN-Greece Industry day, Athens 31st March.
9 Systems Analysis and Design in a Changing World, Fourth Edition.
1 Global Design Effort Beijing GDE Meeting, February 2007 Controls for Linac Parallel Session 2/6/07 John Carwardine ANL.
Online Software 8-July-98 Commissioning Working Group DØ Workshop S. Fuess Objective: Define for you, the customers of the Online system, the products.
Design Team : Advisor: Dr. Edwin Project Web Site: Client: Paul
October, 2009 Controls System Kevin Brown/Brian Oerter October, 2009 Internal Review.
1 Global Design Effort: Control System Vancouver GDE Meeting, July 2006 Controls Global System Review John Carwardine, ANL (For Controls Global Group Team)
Managed by UT-Battelle for the Department of Energy SCL Vacuum Control System Upgrade Derrick Williams
1 Global Design Effort Beijing GDE Meeting, February 2007 Global Controls: RDR to EDR John Carwardine For Controls Global Group.
1 The ILC Control Work Packages. ILC Control System Work Packages GDE Oct Who We Are Collaboration loosely formed at Snowmass which included SLAC,
11 th February 2008Brian Martlew EPICS for MICE Status of the MICE slow control system Brian Martlew STFC, Daresbury Laboratory.
Timing System R+D for the NLC Josef Frisch. NLC and PEPII Phase and Timing Requirements (approximate)
Project X RD&D Plan Controls Jim Patrick AAC Meeting February 3, 2009.
XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser Wojciech Jalmuzna, Technical University of Lodz, Department of Microelectronics and Computer.
1 Global Control System J. Carwardine (ANL) 6 November, 2007.
ESS (vacuum) control system Daniel Piso Controls Division February 20, 2013.
Fermilab Control System Jim Patrick - AD/Controls MaRIE Meeting March 9, 2016.
Lecture 11. Switch Hardware Nowadays switches are very high performance computers with high hardware specifications Switches usually consist of a chassis.
Bernd Panzer-Steindel CERN/IT/ADC1 Medium Term Issues for the Data Challenges.
SCADA Supervisory Control And Data Acquisition Pantech Solutions Here is the key to learn more.
XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser Wojciech Jalmuzna, Technical University of Lodz, Department of Microelectronics and Computer.
Lesson 1 PLC BASICS. PLC Definition  Programmable Logic Controllers are industrial computers that control machine and other applications.  PLC have.
«My future profession»
MicroTCA Development and Status
BaBar Transition: Computing/Monitoring
Latency and Communication Challenges in Automated Manufacturing
Instructor Materials Chapter 1: LAN Design
Chapter 19: Network Management
Case Study: Real Life Unified Architecture Value
Network Video Switching Control System Presentation
Presented by Li Gang Accelerator Control Group
SNS Status Report Karen S. White 10/15/08.
SLC-Aware IOC LCLS Collaboration Jan 26, 2005
Current Status of ITER I&C System as Integration Begins
The ILC Control Work Packages
How SCADA Systems Work?.
Introduction to client/server architecture
Electronics requirements for special diagnostics for the XFEL
Storage Virtualization
Programmable Logic Controllers (PLCs) An Overview.
LLRF and Beam-based Longitudinal Feedback Readiness
Design Unit 26 Design a small or home office network
Business Continuity Technology
LLRF Control System Outline Scope Requirements Design Considerations
RF System (HLRF, LLRF, Controls) EDR Plan Overview
Cloud-Enabling Technology
RF Local Protection System
Chapter-1 Computer is an advanced electronic device that takes raw data as an input from the user and processes it under the control of a set of instructions.
Lessons Learned - SNS Linac PPS Phased Upgrade to Safety PLC
Operation of Target Safety System (TSS)
Vacuum Control System for Monolith Vacuum
Reliability, MPS, Operations and Tuning Work Packages
Presentation transcript:

RDR Controls Design Walk- Through Controls and LLRF EDR Kick-Off Meeting August 20-22, 2007

Controls & LLRF EDR Kick-off Meeting, Aug 20-22, Control System Reference Design The Control System Reference Design serves several purposes –Establish a functional and physical model for costing purposes –Establish a starting point for engineering design and R&D efforts –Communicate our vision of the control system

Controls & LLRF EDR Kick-off Meeting, Aug 20-22, Scope of Controls Computing Infrastructure –Computer Center –Business Computing –Computing Networks –Desktop Support –Engineering Support –Computer Security –Management Controls System –Central Computers –On Site Control Room –Controls Services Operator Interface Automation Logging databases Data Archival Alarms Diagnostics Interfaces to Technical Systems –Front Ends Hardware software –cabling Protection Systems –Machine Protection –Personnel Protection –Beam Containment Network Infrastructure Assembly and Testing of Controls Racks

Controls & LLRF EDR Kick-off Meeting, Aug 20-22, Requirements High Availability –Controls System allocation 2500 hour MTBF 5 hour MTTR 15 hours downtime per year CS availability – 99% to 99.9% Each system % available –Standardization –Diagnostic Layer Scalability –~100,000 devices, millions of control points Automation –Sequencing, automatic startup, tuning, etc. –Slow and Fast Beam Based Feedback Timing and Synchronization –Precision RF Phase References –0.1% amplitude & 0.1 degree phase stability Remote Operation –Enable Collaborators to participate more fully

Controls & LLRF EDR Kick-off Meeting, Aug 20-22, Cost & Technical Drivers High Availability –Redundancy –Automatic failure detection and fail-over –Remote Diagnosis and Repair –Long Mean Time to Failure Equipment –Hot Swap Timing –Tight timing tolerances over long distances –Correlation of Data from various systems

Controls & LLRF EDR Kick-off Meeting, Aug 20-22, Assumptions The design model is intended to be technology independent. Assumes a high degree of functional and technical standardization –ATCA assumed for FE architecture –COTS – no fabrication of controls equipment Functional and technical requirements will be placed on the technical systems –limited options for communication interfaces. Greenfield Site to support 2000 users –Manpower Based on Level of Effort at Fermilab Total Cost independent of Site Location Equipment Replacement needed over Seven Years

Controls & LLRF EDR Kick-off Meeting, Aug 20-22, Functional Model Client Tier GUIs Scripting Services Tier “Business Logic” Device abstraction Feedback engine State machines Online models … Front-End Tier Technical Systems Interfaces Control-point level

Controls & LLRF EDR Kick-off Meeting, Aug 20-22, Physical Model (global layer)

Controls & LLRF EDR Kick-off Meeting, Aug 20-22, Timing System Overview

Controls & LLRF EDR Kick-off Meeting, Aug 20-22, Physical Model (front-end field I/O)

Controls & LLRF EDR Kick-off Meeting, Aug 20-22, Front-end model Black Box Embedded IOC on a chip Micro- chassis supervisorSwitch blade Shelf manager Digitizer CPU Switch blade Black Box 1U Switch Micro- chassis Technical system rack Custom power supplies PLC Ion Pump Controller BPM RF cables 10/100/1G cntrls ethernet Cu in rack, FO otherwise 10 Gig cntrls ethernet 10/100 mgmt. net Technical Equipment Systems Front-end Controls Aggregator Switch Controls shelf Switch blade … Hosts gateways, nameserver, soft IOC Capacity Approx. 400 Ports per shelf Timing Card RG223/U timing patch cable 10 Gig Uplink to tunnel backbone

Controls & LLRF EDR Kick-off Meeting, Aug 20-22,

Controls & LLRF EDR Kick-off Meeting, Aug 20-22, Scope of Global Control System Engineering Manpower estimates for all Control System Tasks –Project Management and Administration –Integration and Testing –Hardware Design and Testing –Software Design, Implementation & Testing –Does NOT include LLRF Engineering M&S for Travel and Misc. expenses

Controls & LLRF EDR Kick-off Meeting, Aug 20-22, Assumptions The Controls System is derived from an existing Framework Applications Engineers are assigned to each Technical Area No Overhead for managing a globally distributed controls effort

Controls & LLRF EDR Kick-off Meeting, Aug 20-22, Manpower Counts Management and Administration 38 Integration and Testing 74 Electronic Engineering 46 Technical Support 98 Control System Global Software 76 Controls Computing 55 Technical Systems Applications 160 Total547 Person Yrs

Controls & LLRF EDR Kick-off Meeting, Aug 20-22, Assessment of CS Engineering The Control System Design is not complete The Project Organization influences overall manpower levels These levels were informally reviewed by Controls Managers at other facilities Qualitative comparisons with other large facilities (SNS, LHC, NLC, NIF etc.) were useful Technical Risk: Medium –Team assembled to do the work is experienced in similar work

Controls & LLRF EDR Kick-off Meeting, Aug 20-22, Scope of Global CS Equipment CS Computing and Network Infrastructure Archival storage Local Analysis Farm Controls Contribution to Simulation Farm One Local Control Center Hardware and Software Purchases to Run the facility for seven years

Controls & LLRF EDR Kick-off Meeting, Aug 20-22, Assumptions Only Commercial Off the Shelf Components are used Doubling of price/capacity in disk and tape storage is assumed in 4 years (doubling again in 8 years) Purchasing 75% of storage in the last 2 years Network back bone is 10 Gbps Based on existing COTS equipment and vendor roadmaps

Controls & LLRF EDR Kick-off Meeting, Aug 20-22, Global System Counts Server Blades Archiving/Feedback 140 Monitoring/Diagnostics 88 Central Processing 100 Data Archiving Robot 1 Drives 32 Tapes 4 PB Disk Cache 1PB Other Database MachineServer Class 1 Database Disk 300 TB Consoles 50 UPS 4

Controls & LLRF EDR Kick-off Meeting, Aug 20-22, Assessment of CS Equipment Detailed bottoms up understanding of the amount of data is not available now Network requirements may not fit within the 10 Gbps assumption Technical Risk: Medium –Teams assembled are experienced in similar work –Based on exiting COTS hardware

Controls & LLRF EDR Kick-off Meeting, Aug 20-22, Scope of RF Phase & Timing Distribution Master Oscillator 5 Hz Fiducial Generation Phase Reference Distribution System Central Event Generation & Distribution Local Timing Trigger Modules & Event Receivers Timing modules for Laser Wires, LOLAs, & BDS pulsed magnets and Synchrotron injection/extraction Timing and Phase Reference Generation for BCs, Synchrotrons & Electron Source Laser

Controls & LLRF EDR Kick-off Meeting, Aug 20-22, Assumptions Centrally Located Dual Redundant Timing Source Distributed via Redundant Fiber to all machine sector nodes Timing is Phase-locked to the RF system

Controls & LLRF EDR Kick-off Meeting, Aug 20-22, Assessment Based on Experience gained at SNS and APS R&D is required to refine the design Many module designs are only conceptual Technical Risk: – Phase Reference Pushes the State-of-the-Art in Design Advances the State-of-the-Art in Technology –Timing Requires some R&D

Controls & LLRF EDR Kick-off Meeting, Aug 20-22, Scope of Protection Systems Equipment Machine Protection System (MPS) –Beam Loss Monitors –Beam Abort Systems –Includes Control and Logic electronics (not sensors, actuators or beam dumps) Beam Containment System (BCS) –Duplicate of MPS to minimize personnel radiation exposure Personnel Protection System (PPS) –Access Control Door & Gate switches Electronic Control Logic Control and Status panels –Does NOT include Shielding Gates, beam dumps, etc.

Controls & LLRF EDR Kick-off Meeting, Aug 20-22, Assumptions No design exists for these systems Assuming a number of electronics modules per RF station PPS based on existing systems using COTS equipment

Controls & LLRF EDR Kick-off Meeting, Aug 20-22, Assessment These Systems are straight forward to Design Technical Risk: Low –There is a high level of experience in designing and implementing these systems

Controls & LLRF EDR Kick-off Meeting, Aug 20-22, Scope of the Front End Control System Equipment Includes controls equipment between technical equipment systems and in-tunnel backbone networking switches. Does not include LLRF –Exception: does include LLRF motor controllers… Fundamental function is to “normalize” the many disparate types of equipment and communication protocols into a single control point namespace, carried by a single standard protocol. Must enable High Availability, and remote diagnosis and repair Must interface to a variety of technical systems

Controls & LLRF EDR Kick-off Meeting, Aug 20-22, Assumptions Control of devices accounted for in 1 of 3 ways: 1.All instrumentation system cards will occupy controls slots. One exception: cavity bpm digitizers in main linac occupy LLRF slots instead 2.Most other devices will provide 2 ethernet ports for control. 3.10% of all devices will fit neither category and will be run using discrete I/O supplied by a controls micro-chassis. Controls Cabling All network cabling is redundant Some devices require timing signals distributed by a generic timing receiver card (ex. Instrumentation digitizers) Intra-rack network cabling is copper, Inter-rack network cabling is multimode fiber-optic. Local timing distribution is RG223/U patch cables. Some cable types pre-terminated, others have termination labor accounted for.

Controls & LLRF EDR Kick-off Meeting, Aug 20-22, Assumptions Standard controls shelf contains: –Redundant power supplies –Shelf manager –2 CPU’s –2 Switch cards –Timing receiver –9 payload slots after above populated Not all shelves, racks, switches will be 100% utilized –A utilization factor applied based on geographic distribution of equipment in given area system 2 other systems are estimated elsewhere but rolled up as a front-end controls cost 1.Motor controllers for LLRF in Linac 2.Cryo controls

Controls & LLRF EDR Kick-off Meeting, Aug 20-22, Controls Front End Equipment and Device Counts Controls equipment required… for control of … these Area System devices (note: LLRF motor-controllers and cryo not listed here)

Controls & LLRF EDR Kick-off Meeting, Aug 20-22, Assessment Bottoms-up approach worked reasonably well overall, with some challenges: –Negotiated boundary between controls and area system equipment changed over time, and has some special cases –Ownership of device counts was spread around, making aggregation difficult –Staying synchronized with area systems difficult, especially given evolving design –Names and categories for devices varied from area system to area system –Some very complex devices are counted as 1 device

Controls & LLRF EDR Kick-off Meeting, Aug 20-22, Linac Device Counts

Controls & LLRF EDR Kick-off Meeting, Aug 20-22, RTML Device Counts

Controls & LLRF EDR Kick-off Meeting, Aug 20-22, DR Device Counts

Controls & LLRF EDR Kick-off Meeting, Aug 20-22, E+ Source Device Counts

Controls & LLRF EDR Kick-off Meeting, Aug 20-22, E- Source Device Counts

Controls & LLRF EDR Kick-off Meeting, Aug 20-22, BDS Device Counts

Controls & LLRF EDR Kick-off Meeting, Aug 20-22, Scope of Controls/LLRF Relay Rack Assembly & Test Engineering and Technical Manpower Test Setups & Test Equipment Operation and Maintenance of Test Systems

Controls & LLRF EDR Kick-off Meeting, Aug 20-22, Assumptions The Relay Racks will be assembled and tested before installation All Crates, modules and cards are manufactured externally Assembly Group is self-contained including Engineering, Quality Assurance, and Testing Size of an assembly group is based on a build rate of 15 RR/wk over 4 years

Controls & LLRF EDR Kick-off Meeting, Aug 20-22, Assessment Total number of RRs and Complexity is not known Testing before installation should save time and improve overall quality of the Control System Risk: Minimal

Controls & LLRF EDR Kick-off Meeting, Aug 20-22, Reconciling RDR and BCD Differences between RDR and BCD –ATCA is identified as an alternative configuration in the BCD –The ATCA configuration in the BCD includes robotic equipment replacement not in the RDR

Controls & LLRF EDR Kick-off Meeting, Aug 20-22, EXTRA SLIDES

Controls & LLRF EDR Kick-off Meeting, Aug 20-22, Availability Considerations

Controls & LLRF EDR Kick-off Meeting, Aug 20-22, Timing & RF Phase Reference

Controls & LLRF EDR Kick-off Meeting, Aug 20-22, Phased Stabilized Reference Link

Controls & LLRF EDR Kick-off Meeting, Aug 20-22, Sector Timing Control Unit

Controls & LLRF EDR Kick-off Meeting, Aug 20-22, BCD Control Room Cluster Architecture

Controls & LLRF EDR Kick-off Meeting, Aug 20-22, BCD Sector Node Processors & FEs

Controls & LLRF EDR Kick-off Meeting, Aug 20-22, BCD Software Architecture

Controls & LLRF EDR Kick-off Meeting, Aug 20-22, BCD Alternative Configuration