Quality Management: Mutually beneficial supplier relationships.

Slides:



Advertisements
Similar presentations
ISO 9001:2000 Documentation Requirements
Advertisements

Transition from Q1- 8th to Q1- 9th edition
Ensuring Better Services and Fair Value “Introduction and roadmap to implementation of ISO in Zambia’s water utilities” Kasenga Hara March 2015.
Environmental Management System (EMS)
Understanding the Requirements Qimpro Standards Organization
 Contracts  Subcontracting  Suppliers  Complaints  Corrective and preventive actions (CAPA)  Internal audits  Management reviews Management requirements.
ISO 9001 : 2000.
EPSON STAMPING ISO REV 1 2/10/2000.
The ISO 9002 Quality Assurance Management System
Prepared by Long Island Quality Associates, Inc. ISO 9001:2000 Documentation Requirements Based on ISO/TC 176/SC 2 March 2001.
TS16949 requirements Subjects –Audit planning –Recertification audit requirements –Auditing Remote supporting functions.
ISO 9001:2000 Intro Presented By: Brad D. Agenda Overview of QMS Fundamentals ISO 9001:2000 Overview & Requirements.
ISO 9000 Certification ISO 9001 and ISO
ISO 9001:2008: Key changes and transition process
5.2 Personnel Use competent staff Supervise as necessary
4. Quality Management System (QMS)
4. Quality Management System (QMS)
ISO 9000 Introduction Imran Hussain.
Fundamentals of ISO.
Bodil Mose Pedersen, DHI Status for implementering af ”Quality Manual”
ISO/IEC A review of the new standard for laboratory accreditation
QUALITY MANAGEMENT SYSTEM ACCORDING TO ISO
Ships in Service Training Material A-M CHAUVEL QMS Terms & Definitions 2009.
ISO 9000 and Public Awareness and Information Session 22 February 2006 Owen Glave, MBA-TQM.
ISO 9001:2000 QUALITY MANAGEMENT SYSTEM REQUIREMENTS
Software Quality Assurance Lecture 4. Lecture Outline ISO ISO 9000 Series of Standards ISO 9001: 2000 Overview ISO 9001: 2008 ISO 9003: 2004 Overview.
Introduction to ISO 9001:2000.
ISO 14001:2004, Environmental Management System
ISO 9001:2008 to ISO 9001:2015 Summary of Changes
4.3 Document control 4.4 Review of requests, tenders and contracts
a guidance to conversion
ISO 9001:2000 The 5 Phase Plan to Implementation Sterling, VA Terry & Associates Quality.
It was found in 1946 in Geneva, Switzerland. its main purpose is to promote the development of international standards to facilitate the exchange of goods.
QUALITY MANAGEMENT SYSTEM
ISO 9001:2015 Subject: Quality Management System Clause 8 - Operation
WORKSHOP ON ACCREDITATION OF BODIES CERTIFYING MEDICAL DEVICES INT MARKET TOPIC 9 CH 8 ISO MEASUREMENT, ANALYSIS AND IMPROVEMENT INTERNAL AUDITS.
Quality Management Supplier Quality Requirements Clarification Meeting Civil work at Dinaledi Sub Station Presentation By: Mothusi Itumeleng 16 July 2014.
1 SMA/November 2007 ISO/IEC 17025: International Organization for Standardization.
DOCUMENTATION ISO/IEC 17025:2005 Documentation.
PRE-QUALIFICATION TENDER FOR THE PROVISION OF ENVIRONMENTAL SERVICES 11 JULY 2014.
QUALITY 10 July 2015 CORP 3268 – DIGITAL TRANSDUCERS.
Quality Management Supplier Quality Requirements The Manufacturer, testing at works and supply of various distribution cut- outs for wires business on.
ISO 9001: 2015 BUSINESS PROCESS IMPLEMENTATION GENERAL AWARENESS
A LOOK AT AMENDMENTS TO ISO/IEC (1999) Presented at NCSLI Conference Washington DC August 11, 2005 by Roxanne Robinson.
Quality Management Supplier Quality Requirements Clarification Meeting Media Monitoring Mothusi Itumeleng.
External Provider Control
UNDERSTANDING ISO 9001:2008.
Welcome to the FSSC Global Markets Webinar 11 September 2017, 4pm CET
ISO/IEC
The following training presentation is for all subcontract employees and is taken upon joining a contract or task order to which we are the Prime vendor.
External Validation of Quality Programs
Prepared by Rand E Winters, Jr. ASR Senior Auditor October 2014
Fundamentals of ISO.
UNIT V QUALITY SYSTEMS.
ISO 9001:2015 Auditor / Registration Decision Lessons Learned
KMCO CAPA System Training
Quality Management Systems – Requirements
Achieving ISO Compliance
QUALITY MANAGEMENT SYSTEM
Transition ISO 9001:2008 to ISO 9001:2015
International Organization
UNDERSTANDING FOR STANDARD
ISO 9000 Dr. S. Thomas Foster, Jr..
ISO 9001:2008 Quality Management Systems
How to conduct Effective Stage-1 Audit
ISO-9001:2000 Quality Management Systems
ACCREDITATION PROCESS
External Validation of Quality Programs
ISO 9001 – 2008 Changes Summary of Changes
Presentation transcript:

Quality Management: Mutually beneficial supplier relationships

19 May Content Background on Quality Requirements Quality Defined Background on Quality Requirements Quality Management Principles (ISO 9000) Understanding ISO 9001:2008 – Requirement for Quality Management System Quality Requirements as per Eskom QM58

19 May Quality Requirements Background Eskom is an ISO 9001:2008 certified company; the certification is managed and monitored divisionally; Clause 7.4 of the ISO 9001 standard requires organization to have a process for managing suppliers or outsourced functions. The type of control applied depends on the complexity (risk rating) of the product/service outsourced; Eskom, as an SOE is governed by PPPFA, which requires that purchasing of outsourced product/services need to go out on open tender to allow transparent, equitable and fair selection of the suppliers; Stage 1 of the PPPFA process requires Functionality evaluation of which (SHEQ) Quality forms part thereof;

Eskom Definition of Quality 19 May Quality is : Conformance to Requirements 1. The performance standard for Quality is: Zero deviation from Requirements 2. Impact of the errors or deviations is measured as the : Cost of non-conformance

19 May QM 58 QUALITY REQUIREMENTS Intention is to describe minimum quality requirements and define the quality criteria for the selection, evaluation, registration, monitoring, and auditing of suppliers. Eskom’s position is to partner with suppliers who fully demonstrate commitment to the development, implementation, and maintenance of a quality management system (QMS) that conforms to ISO 9001 The specification apply throughout Eskom Holdings Limited divisions, suppliers, and sub-suppliers and shall form part of all Eskom request for information (RFIs)/requests for quotation (RFQs)/request for proposal (RFPs) Quality Requirements as per QM 58

19 May Copy of the ISO 9001 (Latest applicable revision) certificate The supplier shall submit a copy of the ISO 9001 (latest applicable revision) certificate. The QMS should drive all the supplier’s business management processes to ensure that all of Eskom’s requirements are fully met on a consistent basis. Ensure that: Product / Service Scoping on ISO certificate is defined and relevant Certificate by Approved and Authorized certification authority Certification Authority is has Recognized International Accreditation Validity (expiry date) of certificate Quality Requirements as per QM 58

Example of ISO 9001Certificate 7 Product / Service Scoping Validity (expiry date) of certificate Certificate by Approved and Authorized certification authority Recognized International Accreditation

19 May Copy of an internal and external management system audit report The supplier shall submit copies of both internal and external management system audit reports. The audit reports must include: Non-conformity (NC) - Description of non-conformity to policy / standards / procedures or processes Corrective action (CA) – Defined requirements for reviewing nonconformities (including customer complaints) and determining the causes of nonconformities Preventive action (PA) - Actions to eliminate the causes of potential nonconformities in order to prevent their occurrence. Quality Requirements as per QM 58

19 May Draft contract quality plan The supplier shall submit a draft contract quality plan. The plan must address the minimum requirements as per ISO Supplier identified the persons responsible for drafting the CQP/PQP Scope of CQP/PQP is complete, as description in the Works Information. Allow for acceptance of CQP/PQP by Employer (meeting of Quality objectives) Preliminary Management authority & responsibility Matrix submitted Index of Documentation to be loaded to the QMS Data-book. Control of Quality Records- process to complete, keep and dispose records Quality Requirements as per QM 58

19 May Draft contract quality plan (Cntd) Resources- Quality department organogram of all QA & QC resources. Allow for Customer Requirement reviews / specifications adjustments Setup communication channel on quality issues (fixed contract meetings) Provide for Design reviews and development approval processes. Purchasing- Submit a list of all suppliers and subcontractors Production- Submit a list of items to be manufactured & to be refurbish items. Quality Requirements as per QM 58

19 May Draft contract quality plan (Cntd) Describe Identification and traceability of items. Describe Procedures in dealing with Customer property Submit process & procedures for Storage and handling Supply draft Concession request for Non-conforming products Describe monitoring and measurement procedures Identify Inspection and testing equipment and calibration certificates Submitted Audit schedule and process for audit and supplier assesments. Quality Requirements as per QM 58

19 May Quality Control plan (QCP) or Inspection and Test Plan (ITP) The supplier shall submit an example of an inspection and test plan (ITP) or quality control plan (QCP). The plan must address the minimum requirements as per ISO List products/processes that require special controls (e.g. welding, NDT,etc) QCP/ITP/checklists are well structured and designed per activity Index of all standards, specifications for all processes, products & materials. QCP has recorded a sequence of witness/verification points Proposed schedule of test and verification hold points recorded on QCP Quality Requirements as per QM 58

Example of Quality Control Plan 13 Approvals Intervention Points Method Controlling documentation Acceptance Criteria

19 May More QM 58 Quality requirements The supplier shall submit a copy of the appointment letter and CV/resume of its quality management representative (QMR) The supplier shall submit copies (minimum three) of its customer satisfaction survey reports. The reports must not be more than two years old The supplier must provide evidence in the form of a proposal and/or assessment results of any recognised national or international business excellent model, should it exist NB: specific requirements per tender will be selected using the Quality Assessment Criteria document Quality Requirements as per QM 58

19 May Post-Contract Award: Quality Requirements The supplier shall submit the following documents within 30 days after the contract date, prior to commencement of work, for acceptance by Eskom: The supplier shall complete a quality control plan and/or ITP(s) for review and acceptance by Eskom prior to the commencement of any work, inclusive of sub-contracted work, within 30 days after contract award Equipment lists and an indication of pressurised components and systems Method statements for works (describing how work will be executed) NB: these plans are to be compiled in line with Eskom’s requirements and will have to be discussed with, and approved by, Eskom prior to any work commencing

Thank you Questions?