10-Dec-2012-cesg-1 IOAG-17d telecon 19th Nov 2013 CCSDS Engineering Steering Group (CESG) Report to the IOAG.

Slides:



Advertisements
Similar presentations
30-March-2015-cesg-1 Martin Suess (AD) Rick Barton (DAD) SPACECRAFT ONBOARD INTERFACES SERVICES (SOIS) AREA.
Advertisements

PS 1 16 June 2006 SEA CESG SUMMARY Rome, Italy, 16 June 2006.
Apr12-cesg-1 Chris Taylor (AD) Stuart Fowell (DAD) SPACECRAFT ONBOARD INTERFACES SERVICES (SOIS) AREA.
1 11 April 2005 The CESG-CMC Work Planning Process Adrian J. Hooke Chairman, CCSDS Engineering Steering Group 09 April 2005 Joint Meeting of the CESG and.
Cesg-1 June 2010 Chris Taylor (AD) Stuart Fowell (DAD) SPACECRAFT ONBOARD INTERFACES SERVICES (SOIS) AREA.
10-Dec-2012-cesg-1 Chris Taylor (AD) Stuart Fowell (DAD) SPACECRAFT ONBOARD INTERFACES SERVICES (SOIS) AREA.
Cesg-1 CCSDS Engineering Steering Group: Report to the CCSDS Management Council (CMC) and Interagency Operations Advisory Group (IOAG): Fall 2010 BSI,
ESA UNCLASSIFIED – For Official Use Workshop #23 Pasadena, USA 23-27Mar15 Mario Merri, ESA/ESOC SM&C WG Plenary.
Cesg-1 SLS REPORT 7 May 2010 Jean-Luc Gerner (AD) Gilles Moury (DAD) SPACE LINK SERVICES (SLS) AREA SLP and NGU sections Only.
07-Apr-2014-cesg-1 Gian Paolo Calzolari (AD) Gilles Moury (DAD) Fall 2014 Meeting London (United Kingdom) SPACE LINK SERVICES (SLS) AREA Gippo / Gilles.
0 CCSDS Systems Engineering Area: Security Working Group Howard Weiss NASA/JPL/SPARTA (a Parsons Company) April.
PS 1 12 June 2006 SEA Opening Plenary Rome, Italy, 12 June 2006.
The Consultative Committee for Space Data Systems Report to CCSDS AGENC Y Note to CMC members: This template follows the CMC-agreed outline for agency.
0 CCSDS Systems Engineering Area: Security Working Group Howard Weiss NASA/JPL/PARSONS November 2014 BSI, London.
November MOIMS AREA PLENARY NAVIGATION WG REPORT November 2004 CONSULTATIVE COMMITTEE FOR SPACE DATA SYSTEMS.
10-Dec-2012-cesg-1 SLS AREA REPORT SLS-OPT: Optical Communications Working Group (1 of 10) StatusComment ProgressGood Progress overall, especially on the.
10-Dec-2012-cesg-1 Keith Scott (AD) Dai Stanton (DAD) SPACE INTERNETWORKING SERVICES (SIS) AREA REPORT.
May 2004 CCSDS Navigation WG Activity Report CCSDS Spring Series May 2004 CSA, Montreal, Canada Felipe Flores-Amaya CCSDS Navigation WG.
Wyn Cudlip BNSC/QinetiQ Presentation to WGISS25 China, February 2008 CCSDS Liaison Consultative Committee on Space Data Systems.
Cesg-1 22 October 2008 Bob Durst (AD) Dai Stanton (DAD) SPACE INTERNETWORKING SERVICES (SIS) AREA.
10-Dec-2012-cesg-1 SLS AREA REPORT SLS-OPT: Optical Communications Working Group (1 of 6) StatusComment ProgressGood Progress overall, especially on the.
1 19 September 2005 Space Link Services Area report to CMC Reston, Virginia, USA, 26 September 2005.
Delta-DOR WG: Report of the Spring 2010 Meeting Portsmouth, VA, USA May 7 th, 2010 Roberto Maddè ESA/ESOC,
CCSDS Engineering Steering Group: Report to the CCSDS Management Council CMC Meeting May 2004 CSA, Montreal, Canada Adrian J. Hooke Chairman, CESG.
1 24 January 2007 SIS Report to CESG/CMC 24 January 2007 R. Durst, D. Stanton.
Cesg-1 28 April 2009 Jean-Luc Gerner (AD) Gilles Moury (DAD) SPACE LINK SERVICES (SLS) AREA.
SLS AREA REPORT May SLS AREA REPORT CESG MEETING Montreal, 17 May 2004 CONSULTATIVE COMMITTEE FOR SPACE DATA SYSTEMS.
Cesg-1 28 April October 2008 Bob Durst (AD) Dai Stanton (DAD) SPACE INTERNETWORKING SERVICES (SIS) AREA.
08 April 2005 Athens, Greece AD-NP - 1 MOIMS AREA: STATUS REPORT, Start of Spring 2005 Meeting N. Peccia ESA R. Thompson BNSC Area Directors Joint CESG/CMC.
SM&C WG Plenary CCSDS Spacecraft Monitoring & Control WG (SM&C) Workshop #17, Darmstadt (D), Apr 2012 Mario Merri, ESA/ESOC, Chairman.
CCSDS Navigation Working Group David Berry 01/16/2007.
1 19 September 2005 Space Link Services Area report to CESG Atlanta, Georgia, USA, 19 September 2005.
Report to CCSDS AGENCY Note to CMC members: This template follows the CMC-agreed outline for agency reports Replace RED text with your agency’s name and.
1 20 April 2009 Cross Support Service Area Cross Support Service Area Opening Plenary Colorado Springs, Colorado, USA 20 April 2009 Erik Barkley (AD) /
Security WG: Report of the Spring 2013 Meeting Bordeaux, France 18 April, 2013 Howard Weiss NASA/JPL/PARSONS skype:
19-May-2015-cesg-1 Gian Paolo Calzolari (AD) Gilles Moury (DAD) Spring 2015 Meeting CalTech (Pasadena, CA, USA) SPACE LINK SERVICES (SLS) AREA Gippo /
19-May-2015-cesg-1 CESG Spring 2015: Project Schedule & Resources.
25-October-2016-cesg-1 CESG Fall 2016 MEETING STATISTICS.
SPACE LINK SERVICES (SLS) AREA
The CCSDS Security WG is chartered to:
CCSDS Engineering Steering Group (CESG): report to the
Security WG: Status Briefing
SPACE LINK SERVICES (SLS) AREA
Colorado Springs, CO, USA, 24 April 2009 Deputy – David Giaretta
JAXA CCSDS Secretary Office
AND INFORMATION MANAGEMENT SERVICES
[Area Name] Area Report [Name] (Area Chair) [Name] (Area Deputy Chair)
CCSDS Systems Engineering Area: Security Working Group
Joint CMC-CESG Meeting
SPACECRAFT ONBOARD INTERFACES SERVICES
Joint Meeting of the CCSDS and the OMG-SDTF
Security WG: Report of the Spring 2016 Meeting
SPACE INTERNETWORKING SERVICES (SIS) AREA
CCSDS Reference Architecture
SOIS-APP Working Group Report Jonathan Wilmot (WG Chair)
AND INFORMATION MANAGEMENT SERVICES
CCSDS Navigation Working Group
Security WG: Report of the Fall 2013 Meeting
CCSDS System Engineering
SLS AREA REPORT November 2004 November 2004.
Delta-DOR WG: Report of the Fall 2010 Meeting
Joint IPR/DAI Workshop
Atlanta, Georgia, USA, 16 September 2005
SPACECRAFT ONBOARD INTERFACES SERVICES
The Hague, Netherlands 06Nov17 Brigitte Behal, CNES Mario Merri, ESA
SPACECRAFT ONBOARD INTERFACES SERVICES
CCSDS Navigation Working Group
SPACE LINK AREA MID-TERM REPORT
JAXA CCSDS Secretary Office
CCSDS Liaison Consultative Committee on Space Data Systems
Presentation transcript:

10-Dec-2012-cesg-1 IOAG-17d telecon 19th Nov 2013 CCSDS Engineering Steering Group (CESG) Report to the IOAG

10-Dec-2012-cesg-2 SEA Area Progress Security WG Algorithm Green Book ready for publication in 1-2 months. Key Management Blue Book has been delayed due to limited ESA resources and focus on SDLS Blue Book application. Delta-DOR WG - Planning new projects: New Quasar Catalogue Magenta Book, procedures, validation & registry operations Considering possible new Delta-DOR implementation architecture MB and signal structures BB (with RF&M) Timeline Data Exchange BoF Discussion of Base concepts, Abstract syntax / multiple serialization format approach, Security architecture, Modeling approach, Need for a Type Registry, Minimum necessary metadata XML Standards & Guidelines SIG Proposed CCSDS namespace RFC, an approach to namespace use and versioning, and the draft XML policy and SANA registry management YB

10-Dec-2012-cesg-3 MOIMS Area Progress NAV WG Tracking Data Message (TDM): 5 years Review - Analysis of proposed changes Pointing Requests Message (PRM), Navigation Hardware Message (NHM) and Spacecraft Maneuver Message (SMM) reviewed SM&C WG Spacecraft Monitoring and Control MO Common Object Model (BB, ESA): Submitted for publication MO M&C Service (BB, ESA): To be submitted for 3rd Agency Review MO Space Packet Binding (BB, CNES): Currently under Agency Review MO Space Packet Binding Testing (YB, CNES/DLR). Already started Tel WG Telerobotics GB Review DAI WG Data Archive Ingestion PAIS BB / YB submitted for publication RAC WG Registry and Archive Certification Requirements on bodies for certification … is under Agency Review

10-Dec-2012-cesg-4 CSS Area Progress CSA WG Architecture (GB)Completed; released for CMC poll Architecture (MB)On Track; Secretariat Jan 2014 (as R1) CSTS WG Framework (BB)On Track; Secretariat Jan 2014 (as R2) MD CSTS (BB)On Track; Secretariat Mar 2014 (as R1) TD CSTS (BB)On Track; Secretariat Mar 2014 (as R1) CSSM WG SM Concept (GB)On Track; Secretariat Feb 2014 (CESG review) Schedule of Services (BB)On Track; Secretariat Jan 2014 (as R1) GFT BOF Concept PaperOn Track –> AD Mar 2014

10-Dec-2012-cesg-5 SIS Area Progress CFDP Revisions WG Agreement on proposed set of changes to CFDP CFDP-over-Encapsulation Working Group Submitted post-Red-1 book to secretariat for final formatting Motion Imagery and Applications Working Group Post-Red-1 book updated and submitted to secretariat Working interoperability test plan and report Delay Tolerant Networking Working Group About to start BP and LTP interoperability testing Discussed next documents; interest in network management and routing Voice Working Group Revising Blue Book; agreement on a lot of new technical material

10-Dec-2012-cesg-6 SLS Area Progress RFM WGRadio Frequency & Modulation Recommendation on suppressed carrier modulations ready for publication. Recommendations on 8 GHz EESS modulations ready for agency review. Recommendation on DDOR ready for agency review. Revised PN Ranging BB ready for publication with accompanying GB update. Work on 26 GHz EESS modulation recommendation initiated. PCOM GB initiated. C&S WGCoding & Synchronisation Proximity-1 Coding Layer (with PICS) finalized DLR Orange Book on Erasure Codes in progress. WG will start working on pink sheets to B to introduce slicing. WG to initiate selection of new code for TC uplink NGU WGNext Generation Uplink Finalized NGU Green Book delivered to CCSDS Editor OCM BOFOptical Communications (SLS-OPT WG) Work completed. Concept paper, charter and projects forms submitted to SLS-AD and CESG poll started Schedule foresees Kick Off of the Optical Communications (OPT) WG by Jan 2014

10-Dec-2012-cesg-7 SLS / SOIS Area Progress SLP WGSpace Link Protocols To Publish Proximity-1 Data Link BB / GB Update (Spring 2014) Publish new version of Overview of Space Communications Protocols GB MHDC WGMultispectral & Hyperspectral Data Compression WG requests new Blue Book to specify spectral decorrelation stage for Multispectral & Hyperspectral image compression (rather than as additional chapters in Issue 2 of B). SDLS WGSpace Data Link Security Consistency of SDLS protocol specification with SLP in progress with Agency Review ongoing for SDLS Red-3 and TM/TC/AOS Pink Sheets. Funds for Two prototypes ientified SDLS Extended procedures in progress. Framework specification agreed. SOIS App Sup WGApplication Support Good progress on EDS (Electronic Data Sheets); W B reviewed

10-Dec-2012-cesg-8 Other Items Status ICPA Updated status to be presented at next CMC meeting (Dec 13) IOAG will be informed officially before Christmas 2013 CCSDS-StratPlan-A01 New draft 11 has been delivered to CMC for comments Discussion at next CMC meeting planned Outcome of IOAG / IOP 3 Official response from CCSDS to IOAG before Christmas 2013 LEO 26 Ghz Recommendation on 26 GHz modulation is expected by mid Magenta Book on VCM is expected by end Magenta Book on ACM is expected by end OL BB for Optical Communications Physical Layer is expected by end 2016 BB for Optical Communications Coding & Synchronization is expected by end 2016 GB for Optical communications concepts and terminologies is expected by end 2015 GB for Real-Time Weather and Atmospheric Characterization Data is expected by end 2015