Frothingham Hall Renovation Easton, MA June 21, 2010 architecture interior design urban design cbtarchitects.com.

Slides:



Advertisements
Similar presentations
2012 OLA Library Building Awards Public Libraries
Advertisements

TORONTO PUBLIC LIBRARY THORNCLIFFE BRANCH. PHOTOGRAPHS Interior view of library from entrance area……………………………………………………………………………………………… 3 Interior view.
RICHVIEW LIBRARY- Ground Floor Interior Renovation TABLE OF CONTENTS Submission for OLA Library Building Award 2012 Richview Library – Ground Floor Interior.
CAMBRIDGE LIBRARIES & GALLERIES QUEEN SQUARE LIBRARY.
Grimsby Secondary School
February 12, 2010 Government Center Station Reconstruction Project Green Line / Blue Line Public Meeting December, 2012.
PA Architects. PA Architects Presents SUNSET Elementary School Welcome to SUNSET Elementary School RENOVATIONS & CLASSROOM ADDITION SCHEMATIC DESIGN.
Front view of coach house (photographer facing west) Front view of coach house (facing north-west)Side view of coach house (facing south) Rear view of.
Magali Pauzié Magali Pauzié $1,000 $2,500 $5,000 $10,000 $25,000 $50,000 $75,000 $150,000 $1,000.
UPSTAIRS DOWNTOWN North Walnut Case Study for Reuse Anna Margaret Barris Project Designer Illinois Historic Preservation Agency.
RENOVATION & ADDITION OPTIONS TORONTO DISTRICT SCHOOL BOARD NORTH TORONTO COLLEGIATE INSTITUTE REDEVELOPMENT STUDY.
Classroom Addition Facility Planning funds to study a possible addition Enrollment Projections Increase capacity for 2300 students Program includes 19.
INTD 50A floor plan considerations.
Additions and Renovations to: Horace Mann School Additions and Renovations to: Horace Mann School Additions and Renovations to: Horace Mann School.
Housing Styles. Common Floor Plan Layouts: ► Single-Level ► Split-Level ► Daylight basement ► Two-story ► Dormer ► Multilevel.
Brought to you by: HISTORIC ITHACA 212 Center St, Ithaca, NY
Institutional Services Human Resources Facilities Maintenance Custodian Services Security Construction Wilmington Campus North Campus.
Welcome to the Perris Valley Museum Historical Archives.
Logo. PRELIMINARY SITE PLAN PROGRAM GOALS Embrace & live out our Mission Grow in commitment to Christian living through: Education, Worship, Stewardship,
Church Renovation/ Expansion Proposals Willowdale.
SHARON CITY SCHOOL DISTRICT Page 1 of 18. SHARON CITY SCHOOL DISTRICT Page 2 of 18 OPTION 1C – New Building on Case Avenue Site  Building Grades: K-6.
Chapter 16 Designing Homes for Today’s Needs Housing & Design Winter 2013.
Designing Functional Interiors &
NOTE: REFERENCE PROJECT MANUAL DATED 1/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS & SPECIFICATIONS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO. NO.DATE:
MICHIGAN STATE UNIVERSITY OWEN HALL REFURBISHMENT RE-ENERGIZING OWEN HALL.
254 East Beaver Avenue Residential/Mixed Use Project Tessa Bauman Abdullah Hajjyeah Alex Radkoff Group Members PICTURE HERE Introduction Proposed Site.
Floor Plan Considerations
FORUM Presented by ART GUADANO, AIA, LEED AP BD+C DURHAMTOWNHALL.
Schematic design presentation School of Business South Hall Renovation.
ENERGY EFFICIENT HOUSE DESIGN UDC, Van Ness Campus Student Architects: Sarah Alexander and Roberto Martin.
Basement Suite Renovations. Storage Room Under stairs East Bedroom West Bedroom Living Room Furnace Fridge Bathroom Previous Basement Entrance to stairs.
A PLAN TO BUILD AN ELEVATOR October 15, Long-Range Plan –Office-size Elevator –New Fireproof Stairs –Handicap-Accessible Restrooms –Large Multi-purpose.
  Provide a library link at an existing campus crossroads and a new face for the combined Deering Library/ University Library complex  Strengthen the.
The house Prof. Myrna Monllor Jiménez English 031.
October 15, 2012 Oakwood Presbyterian Church Feasibility Study Design Meeting 2 Copyright Hoffman Architecture /02/20121.
HKU SPACE Po Leung Kuk Community College Building Causeway Bay, Hong Kong 9 September 2008.
AT – 201 Introduction to Architecture Dan Trent August 28,
Learning, Health, and Safety Capital Project Alternates and Change Order
Codes.
Written by Helen Hawver Georgia CTAE Resource Network 2010
Option 1 New Construction (10,000 Square Feet) – Secure Entrance / Administrative Offices – Lobby / Connection to Greeno Building – Weight Room Renovations.
Library Renovation Projects Capital Improvement Plan 2009 – 2014.
Concept Design Community Center Proposed Spaces New Construction63,000 SF – Gym Spaces13,500 SF – Fitness Center 9,000 SF – Walking Track 4,000 SF – Multipurpose.
ASHLAND TOWN HALL May 10, Ashland Town Hall  Dedicated April 12, 1955  Plan for the next 50+ years  Strategic Plan:  Initiative – Develop.
Update on Student Housing College Senate May 6, 2016.
ACCESSORY DWELLING UNITS: CLEARING UP THE CONFUSION
A HOUSE.
The Campus 2.06 Acres or 89,734 sq ft of Land 25,058 sq ft Church Building 4,239 sq ft Sanctuary 497 sq ft Balcony 20,322 sq ft Multipurpose.
Brewster Ladies’ Library Design & Renovation Project
Cottage Armory Restoration Project
CHAPTER 2 Basic House Designs
Floor Plans.
Draft Indoor Recreation Facilities Master Plan
Building Committee April 20th, 2016.
Goding Elementary Existing Conditions Presentation February 13, 2013.
Penn Medicine Chester County Hospital
Interior Design Designing Functional Interiors & Floor Plans
Architectural Design Styles of Houses.
Cohasset Town Hall THRAC August 29th, 2017.
Housing Styles.
Open Doors – Storage Committee
Homes have Zones We are going to study the different areas of a home.
Special valuation 2728 S. Manito Blvd. Bonsall-Taylor House
DOVER ELEMENTARY Existing MPB (2/14/12).
Hotel Guest Rooms and Suites
Interior/Exterior Renovation SECTION EXISTING CONDITION PHOTOS
Concept Features Bus entry, exit and drive are separate from visitor and parent entry and drive Additional area behind building for bus traffic and turn-around;
WES Renovation Update Photo Gallery
Factors in residential design/Traffic patterns
Mowrey Hall Renovation
Presentation transcript:

Frothingham Hall Renovation Easton, MA June 21, 2010 architecture interior design urban design cbtarchitects.com

Frothingham Hall Renovation Easton, MA | Existing and Historic Exterior Photographs 2010 c.1920c.1902

Frothingham Hall Renovation Easton, MA | Historic Interior Photograph

Frothingham Hall Renovation Easton, MA | Existing Main Level Plan

Frothingham Hall Renovation Easton, MA | Existing Site Plan

Frothingham Hall Renovation Easton, MA | Building Program Area

Frothingham Hall Renovation Easton, MA | Option 1 First Floor Plan Advantages PROVIDES PROGRAM SPACES WITHIN EXISTING BUILDING MAINTAINS EXISTING SERVICE DOCK RELOCATES BASEMENT STAIR TO IMPROVE CIRCULATION PROVIDES MOVABLE PARTITION IN MEETING ROOM Disadvantages LACKS ADEQUATE OFFICE/ADMIN SPACE FOR PROGRAM NEEDS LACKS PROMINENT NEW MAIN ENTRANCE LIMITS PRE-FUNCTION GATHERING SPACE IN LOBBY REDUCES MULTI-PURPOSE ROOM REDUCES ACTIVITY ROOM REDUCES CONFERENCE/MEETING ROOM LIMITS TRANSPARENCY ON THE MAIN FAÇADE AT BATHROOMS Existing Building w/ 100 SF Addition

Frothingham Hall Renovation Easton, MA | Option 1 Site Plan

Frothingham Hall Renovation Easton, MA | Option 2 First Floor Plan Advantages MAINTAINS FRONT VIEWSCAPE OF HISTORIC BUILDING PRESERVES FULL SIZE MULTI-PURPOSE ROOM PROVIDES CONFERENCE/MTG ROOM SIZE TO MEET PROGRAM NEEDS PROVIDES DIRECT ACCESS BETWEEN ACTIVITY ROOM AND KITCHEN RELOCATES SERVICE DOCK TO MAXIMIZE USABLE BACKYARD RELOCATES BASEMENT STAIR TO IMPROVE CIRCULATION Disadvantages LACKS ADEQUATE OFFICE/ADMIN SPACE FOR PROGRAM NEEDS LACKS PROMINENT NEW MAIN ENTRANCE LIMITS PRE-FUNCTION GATHERING SPACE IN LOBBY REDUCES ACTIVITY ROOM LOCATES CONFERENCE/MTG ROOM REMOTELY SLIGHTLY MORE CONSTRUCTION COST Existing Building w/ 310 SF Addition

Frothingham Hall Renovation Easton, MA | Option 2 Site Plan

Frothingham Hall Renovation Easton, MA | Option 3 First Floor Plan Advantages MAINTAINS FRONT VIEWSCAPE OF HISTORIC BUILDING PRESERVES FULL SIZE MULTI-PURPOSE ROOM PROVIDES CONFERENCE/MTG ROOM SIZE TO MEET PROGRAM NEEDS PROVIDES DIRECT ACCESS BETWEEN ACTIVITY ROOM AND KITCHEN RELOCATES SERVICE DOCK TO MAXIMIZE USABLE BACKYARD RELOCATES BASEMENT STAIR TO IMPROVE CIRCULATION PRESERVES FULL SIZE ACTIVITY ROOM PROVIDES ADEQUATE WAITING/PRE-FUNCTION SPACE IN LOBBY PROVIDES OFFICE/ADMIN SPACE FOR MOST STAFF NEEDS Disadvantages LACKS ADEQUATE OFFICE/ADMIN SPACE FOR VOLUNTEERS LACKS PROMINENT NEW MAIN ENTRANCE LOCATES CONFERENCE/MTG ROOM REMOTELY PROVIDES ONLY 1 STAIR TO BASEMENT AND LIMITED BALCONY ACCESS SLIGHTLY MORE CONSTRUCTION COST. Existing Building w/ 780 SF Addition

Frothingham Hall Renovation Easton, MA | Option 3 Site Plan

Frothingham Hall Renovation Easton, MA | Option 3A First Floor Plan Advantages MAINTAINS FRONT VIEWSCAPE OF HISTORIC BUILDING PRESERVES FULL SIZE MULTI-PURPOSE ROOM & ACTIVITY ROOM PROVIDES CONFERENCE/MTG ROOM SIZE TO MEET PROGRAM NEEDS PROVIDES DIRECT ACCESS BETWEEN ACTIVITY ROOM AND KITCHEN RELOCATES SERVICE DOCK TO MAXIMIZE USABLE BACKYARD RELOCATES BASEMENT STAIR TO IMPROVE CIRCULATION PROVIDES ADEQUATE WAITING/PRE-FUNCTION SPACE IN LOBBY PROVIDES OFFICE/ADMIN SPACE FOR ANTICIPATED STAFF NEEDS PROVIDES PROMINENT NEW MAIN ENTRANCE Disadvantages LOCATES CONFERENCE/MTG ROOM REMOTELY FROM OTHER PROGRAM SPACES. (THIS MAY BE AN ADVANTAGE AS IT PROVIDES PRIVACY FOR MEETINGS AND HEALTH SCREENING CLINICS) PROVIDES ONLY 1 STAIR TO BASEMENT AND LIMITED BALCONY ACCESS LARGEST ADDITION WITH SLIGHTLY MORE CONSTRUCTION COST Existing Building w/ 945 SF Addition

Frothingham Hall Renovation Easton, MA | Option 3A Site Plan