Technical Advisory Board, GANIL 2015 F. CHAUTARD Technical Advisory Board Ganil 2015 F. Chautard GANIL-Caen Sytze Brandenburg (KVI), Frédéric Chautard.

Slides:



Advertisements
Similar presentations
NUSTAR ECOS meeting held on the 27 of May 2005 in Paris (University of Jussieu): Three items: -The ECOS document for NuPECC -The ECOS town meeting.
Advertisements

Laboratoire Commun CEA/DSM-CNRS/IN2P3 Orsay June 4 th 2004 M-H MoscatelloHigh Intensity Stable Beams HIGH INTENSITY STABLE BEAMS -Available beams at GANIL.
Summary of the Design Report and Next Steps Edda Gschwendtner for the CERN AWAKE Project Team Edda Gschwendtner, CERN1.
Stable beams Radioactive beams Cluster beams 15 MV Tandem : beams from p to gold Cluster beams : C60 CnHm Au MeV electron Linac (10 µA) fission.
1 Roger Erickson 1 Coordination with Accelerator Systems NEH Accelerator Readiness Review Coordination with Accelerator Systems.
Mid Term Review Meeting, 26 September 2012S. GIRON1 * The research project has been supported by a Marie Curie Early Initial Training Network Fellowship.
HIE-ISOLDE (High Intensity and Energy) project Protection of superconducting solenoids MPE work shop – December 14, 2010 G.J. Coelingh TE-MPE-CP.
A facility for Nuclear, Atomic, Material and Radiobiology Sciences. Delivering stable (from C to U) and radioactive ions (from He to Xe) in the energy.
1 Kenneth Osborne, 9/14/07 Inter Group communications at the Advanced Light Source. Overview of the different methods of communication between different.
CERN NuPAC meeting Dec 2005 The future of ISOLDE: accelerated radioactive beams Peter Butler 1.HIE-ISOLDE 2.EURISOL.
Proposal for Experiment S291: " Residual radioactivity induced by U ions - experimental investigation and longtime predictions" GSI, Darmstadt: G.Fehrenbacher,
SPL, a driver for EURISOL? Yorick Blumenfeld* Isolde-CERN * On leave from IPN Orsay We acknowledge the financial support of the European Community under.
CRYOMODULES High Beta Low Beta Approved by CERN Research Board in December 2009.
Engineering Department ENEN What is changing in EN 1. Streamlining and boosting remote handling and manipulation activities 2. Bringing small works closer.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
1 Final Conference, 19th – 23rd January 2015 Geneva, Switzerland RP 9 Study of a logistic concept for Super-FRS RH components Faraz Amjad Helmut Weick.
RADIOACTIVE ION BEAMS AT B.RANNOU W.MITTIG M.G.ST LAURENT (GANIL France)
Status of renewal of Buildings 115 & 507 Borge & Erwin Siesling.
Agenda : CLIC Civil Engineering and Services (CES) WG.
Radioactive ion beam production at other facilities
Experimental part: Measurement the energy deposition profile for U ions with energies E=100 MeV/u - 1 GeV/u in iron and copper. Measurement the residual.
ISOLDE Activities for LS2 Richard Catherall EN-STI ISOLDE Technical Coordinator.
Workshop on Women in Science and Engineering Latifa Elouadrhiri Jefferson Lab November 16, 2009.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Construction of FAIR Phase-1 December 2005 J. Eschke, GSI Construction.
UK Research in Nuclear Physics P J Nolan University of Liverpool.
CERN, 15/03/05EURISOL - Beta Beam Task1 EURISOL and the Beta-Beam Task Status and Planning Michael Benedikt Mats Lindroos AB-Department, CERN.
Status of facility design Activities of the IPNS Nuclear/Particle Physics group Basic information for the working sessions Activities of Nuclear and Particle.
Few introductory remarks on topical meetings…. System safety review Dense schedule of meetings with LNGS and safety experts during last six months Various.
EUROnu Costing Workshop May 2011 Beta-Beam Costing Exercise Elena Wildner, CERN 25/05/11 1 EUROnu Costing Workshop, CERN May 2011.
Experiment Readiness Review P. Rossi – Hall C Coll. Meeting Jan 21, 2016.
Relativistic Nuclear Collisions (RNC) Group Nuclear Science Division (NSD), Lawrence Berkeley National Lab The Relativistic Nuclear Collisions (RNC) group.
Linda Bagby - SBN Program Electrical Coordinator T600 Installation 8 February 2016 SBN Program Operational Readiness Clearance.
Proton-Driven Plasma Wakefield Acceleration CERN Project Structure Edda Gschwendtner, CERN Lisbon Meeting, 22 June 2012Edda Gschwendtner, CERN2.
TE-CRG Activities D. Delikaris, TE-CRG.
A. Herlert, CERN PH-IS ISOLDE scientific coordinator’s report INTC meeting, May 19, 2008 ISOLDE scientific coordinator’s report INTC meeting, May 19, 2008.
Technical Board Summary Alan Bross MICE CM17 CERN February 25, 2007.
ATLAS Forward Project (AFP) Technical review outcome Review done on (morning) September 2013, see agenda
Liquid targets for positron production - ??? Jerry Nolen Physics Division, Argonne National Laboratory POSIPOL Workshop Argonne National Laboratory September.
Summary of IAP comments from 2007 EURISOL Town Meeting
Cryogenic safety organisation at CERN
The Next Generation of a Gamma Irradiation Facility GIF++
Environmental protection
Technical Services: Unavailability Root Causes, Strategy and Limitations Data and presentation in collaboration with Ronan LEDRU and Luigi SERIO.
Induced-activity experiment:
Access to material testing facilities (WP10)
The RIA Users Organization (RIAUO)
Updating the Regulation for the JINR Programme Advisory Committees
Emergency dumping of proton and ion beams in SIS100 F
for the EURISOL Steering Committee
Core Group for Prospective Study GANIL 2015
Affordable Energy Production from Renewable Fuel
News and brief overview of Beamline plans for the next few months
(Procurement, testing of magnets)
SPSC123 Summary Lau Gatignon/EN-EA IEFC, 4 November 2016.
Accelerator and Experiment Interface Session: LS2, LS3
Status of the beta-beam study
High Radiation to Materials 16th Project Team Meeting – May 20, 2010
Veksler and Baldin Laboratory
Elena Wildner, CERN EUROnu meeting Paris June
of secondary light ion beams
of secondary light ion beams
nuSTORM and the Physics Beyond Colliders workshop
Superbeams with SPL at CERN
Consultants’ Meeting to develop a guidance document on management of large amounts of radioactive waste after an emergency situation 04, Feb. – 08, Feb.
Introduction to Jefferson Lab
MINOS: a new vertex tracker for in-flight γ-ray spectroscopy
W. T. Weng Brookhaven National Laboratory
Status and perspectives of the LNS-FRIBS facility
SOLID Collaboration Meeting
The HIE-ISOLDE Design Study and the CATHI Fellow Participation
Presentation transcript:

Technical Advisory Board, GANIL 2015 F. CHAUTARD Technical Advisory Board Ganil 2015 F. Chautard GANIL-Caen Sytze Brandenburg (KVI), Frédéric Chautard (chair, GANIL), Antoine Daël (SACLAY), Bernard Launé (IPNO), Olivier Laurent (GANIL), Jerry Nolen (ARGONNE), Eric Petit (SP2/GANIL), Josiane Sauret (GANIL), Thierry Stora (CERN), Maurizio Vretenar (CERN) Will provide advice on the technical implications, including radio- protection and safety, of the future physics requirements and the possible large-scale maintenance needed.

Technical Advisory Board, GANIL 2015 F. CHAUTARD INTRODUCTION From the analysis of the cluster group documents by the TAB four major items emerged: 1. Source developments (stable and exotic), 2. Second station of irradiation for SPIRAL1 / 2, 3. The fragmentation at GANIL, 4. SPIRAL2 room adaptation. Safety issues For each topic, it will be underline the technical aspects that seems important to the TAB (report GANIL/SDA/611)

Technical Advisory Board, GANIL 2015 F. CHAUTARD 1 – Source developments Common to several cluster groups Of utmost importance for the future of GANIL. Technical proposals were discussed with the source experts of the committee. It appeared that various source design can be used at GANIL within a maximum of four year of development and construction. The choice and recommendation on the topic cannot be done within our committee due to the short time allowed. Meanwhile, a committee SDA/PHYSIQUE/SPIRAL2 was created at GANIL in which a ion source expert group, GANISOL, should investigate and realise the future sources at GANIL. Therefore, all demands identified from the clusters have been naturally sent to this committee.

Technical Advisory Board, GANIL 2015 F. CHAUTARD 2 - Second station of irradiation for SPIRAL1 / 2, New beamline for primary beams New beamline for the secondary beams Equipped the cave (remote handling, nuclear ventilation, gas storage …) … This requires also large amount of manpower for also a high cost.

Technical Advisory Board, GANIL 2015 F. CHAUTARD 2 - Second station of irradiation for SPIRAL1 / 2, An alternative is to use the existing target station: D2 (SIRa) and SPIRAL1 Cave. This configuration was used for SPIRAL1 beam developments where low power beam (<400W) production/source tests were performed on SIRa/D2. New sources/new targets could still be tested in SIRa (upgrades needed but known by the users of the room). Meanwhile, cave1 safety report upgrade can be started to extend the high power (>400W) beam production. Safety upgrade due to radioactive releases?

Technical Advisory Board, GANIL 2015 F. CHAUTARD SISSI2 From a technical and GANIL human resources points of view, the replacement of SISSI with identical functionality and in collaboration with cryogenic experts from IRFU/SACM laboratory seems the most optimize solution to follow. This solution induces no safety report foreseen.  April 2009: technical report of the chosen solution of replacement  June 2009: submission for competitive tendering  September 2009: return of the tendering. Meanwhile Scientific Council : “ While SISSI2 would provide some unique capabilities at non-relativistic energies for two-step reactions, the recommendation of the SC is to concentrate efforts on SPIRAL2”  April 6th : SDA/PHYSIQUE/SPIRAL2 Project review 3 – Fragmentation at GANIL

Technical Advisory Board, GANIL 2015 F. CHAUTARD 3 – Fragmentation at GANIL SPIRAL2 beams Fishbone New beamlines adapted to the fragmentation community demand and an attempt to dedicate part of the LISE spectrometer to the SPIRAL2 beams. D4, D5 and D6 room modifications The report [GANIL R 09 01] done in collaboration with IPNO defines:  The main building modifications,  The area where SPIRAL2 beams might be transported.  The cost and human resources.  The schedule (end 2010) Incidence on control access system (EIS) remains to be taken into account..

Technical Advisory Board, GANIL 2015 F. CHAUTARD 4 - SPIRAL2 room adaptations The rooms G1, G2, G3, D4, D5 and D6 are likely to receive SPIRAL2 beams and be modified. Beam dumps for SPIRAL2 beams requires the development that is not yet started.

Technical Advisory Board, GANIL 2015 F. CHAUTARD 4 - SPIRAL2 room adaptations It should also be pointed out that this new type of beamstop should probably also be implemented in other experimental setups where high intensity SPIRAL2 beams are to be used in the future (G2, SPEG, LISE3). G1

Technical Advisory Board, GANIL 2015 F. CHAUTARD 4 – Safety issues Tables per room used as inputs for the GANIL safety report (example). Beams characteristics Stable beams GANIL Exotic beams GANIL + SPIRAL1 Exotic beamsStable beams SPIRAL 2 Exotic beams SPIRAL2 post accelerated Beams of interest for physicists GANIL rangeNo restrictionsProduced in LISE Used only after CIME postacceleration Spiral 2 range Energy range [MeV/A] Maximum availableNo restrictionsFrom few MeV/u up to 100 MeV/u For calibration of the detectors and alignment of the beam, the same energy and characteristics as the radioactive beams. CIME range Beam intensity [pps] Maximum stable beams available and authorized in D3 (6 kW ?). Very low beams (1 Maximum availableBeams produced from fragmentation in D4 and D6, maximum Few nAe (10 10 pps),10 6 pps for direct studies.. Targets used (type, form, activity…) Solid targets. Be, Ni, Ta, W… Thickness: from few tens of microns to few millimetres. Solid, gaseous, cryogenic targets, usually thin targets (up to 1 mm). Solid, gaseous, cryogenic targets, usually thin targets (up to 1 mm) – used to calibrate detectors. Solid, gaseous, cryogenic targets, usually thin targets (up to 1 mm). Radioactive waste produced (solid, liquid, gas) YES - SolidNot really – mainly from the decay of the radioactive nuclei Not reallyNot really – mainly from the decay of the radioactive nuclei + reactions on a thin target Beam losses (localization) Mainly in the beam dump in the first dipole D3P1. In the selection slits In the selection slits + beam dump in D4 or D6 In the selection slits + beam dump in D4 or D6. Detectors : toxic matter used (fire, explosion …) CAVIAR -> gasAs it is in the present installation.

Technical Advisory Board, GANIL 2015 F. CHAUTARD Safety Milestones April 2009: Demand to ASN for radioactive release in the frame of the public inquiry: should take Into account ALL THE NEEDS (existing GANIL, SPIRAL 1, SPIRAL 2, news needs) GANIL SAFETY REPORT  2009: Analyse of the GANIL existing facility compare to the actual regulation  With actual beams (stable beams & SPIRAL 1)  With SPIRAL 2 beams injected in CIME and experimental areas  New needs (inputs from GANIL 2015)  End of 2009: New GANIL safety report sent to the ASN at the same time than the safety report of the 2 nd phase of SPIRAL : Modifications of the experimental area

Technical Advisory Board, GANIL 2015 F. CHAUTARD Conclusions The TAB report: Tried to help physicists to express their fundamental needs:  Because of SPIRAL2  With the existing machine To fill exhaustively the GANIL safety report and radioactive release demand (short term demand) Showed the importance to have tight collaboration between Physicist/ Engineers Now, we know what need to be done … how to manage it ?