Silicon Vertex Detector Schedule 23 July 2012 Christian Irmler (HEPHY Vienna) 12 th Open Meeting of the Belle II Collaboration.

Slides:



Advertisements
Similar presentations
23 July 2012 Thomas Bergauer (HEPHY Vienna) Belle II SVD Construction Database 12 th B2GM Bad Aibling.
Advertisements

SVD Serial Numbers M.Friedl (HEPHY Vienna) 6 May 2014.
A Low Mass On-chip Readout Scheme for Double-sided Silicon Strip Detectors 13th February 2013 C. Irmler, T. Bergauer, A. Frankenberger, M. Friedl, I. Gfall,
MICRO VERTEX DETECTOR ZEUS experiment at DESY (HAMBURG) PROJECT SPECIFICATIONS : Design and production of a silicon Micro Vertex Detector (MVD) for the.
L. Greiner 1HFT PXL LBNL F2F – March 14, 2012 STAR HFT The STAR-PXL sensor and electronics Progress report for F2F.
Electrical QA Markus Friedl (HEPHY Vienna) IPMU, 19 March 2012.
Milestones and Schedule of SVD Construction Markus Friedl (HEPHY Vienna) on behalf of the Belle II SVD Collaboration BPAC October 2012.
Summary of the SVD session 19 March 2009 T. Tsuboyama (KEK)
The Belle II Silicon Vertex Detector Readout Chain Markus Friedl (HEPHY Vienna) TWEPP2012, 19 September 2012.
Department of Semiconductor Detectors HEPHY Scientific Advisory Board 21 Oct Thomas Bergauer.
DC/DC Converter Update Markus Friedl (HEPHY Vienna) B2GM, 22 July 2012.
19 November 2009 Christian Irmler (HEPHY Vienna) APV25 and Origami Scheme 4 th Open Meeting of the Belle II Collaboration.
18 November 2010 Immanuel Gfall (HEPHY Vienna) SVD IR Mechanics 7 th B2GM.
SVD Mechanics 21th B2GM Florian Buchsteiner (HEPHY Vienna)
1 Mechanics news from KEK S.Tanaka (KEK) SVD/PXD meeting SVD parallel session.
18 November 2010 Immanuel Gfall (HEPHY Vienna) SVD Mechanics IDM.
26 April 2013 Immanuel Gfall (HEPHY Vienna) Belle II SVD Overview.
23 July 2012 Thoms Bergauer (HEPHY Vienna) Sensor Irradiations and Testbeams 12 th B2GM Bad Aibling.
1 Belle II IR 2 Shuji Tanaka KEK Joint Belle II & superB Background meeting 2012//Feb/ 8-9th 1.
7 th B2GM SVD Summary 19 November 2010 Markus Friedl (HEPHY Vienna)
Origami Chip-on-Sensor Design: Progress and New Developments 19th September 2012 TWEPP 2012, C. Irmler (HEPHY Vienna) TWEPP 2012, Oxford University.
DAQ Scheme and Beam Test Results H. Asano, M. Friedl, H. Hyun, T. Higuchi, C. Irmler, Z. Natkaniec, W. Ostrowicz, M. Pernicka, T. Tsubuyama.
Jigs and procedure for ladder assembly BelleIInote #8 6 th Feb 2012 Yoshiyuki Onuki University of Tokyo 1.
Status of SVD Readout Electronics Markus Friedl (HEPHY Vienna) on behalf of the Belle II SVD Collaboration BPAC October 2012.
Construction and Test of the First Belle II SVD Ladder Implementing the Origami Chip-on-Sensor Design 29 Sept TWEPP 2015, C. Irmler (HEPHY Vienna)
The Belle II Silicon Vertex Detector Florian Buchsteiner (HEPHY Vienna)
The Mechanical Structure for the SVD Upgrade
SVD Mechanics Markus Friedl (HEPHY Vienna) BPAC, 26 October 2015.
Tasks and time scale T. Tsuboyama (KEK). DSSD production Test production by Micron and SINTEF (Talk by M. Valentan) HPK decided to restart DSSD business.
11 June 2015 Thomas Bergauer (HEPHY Vienna) Belle II SVD beam Test SPS 2015 SPS users meeting.
10 September 2010 Immanuel Gfall (HEPHY Vienna) Belle II SVD Upgrade, Mechanics and Cooling OEPG/FAKT Meeting 2010.
Comments on ladder structure 5 Feb Toru Tsuboyama.
2 Oct C. Irmler (HEPHY Vienna) BPAC Preparation and SVD Schedule 6 th Belle II VXD workshop.
Overview SVD 21 Jan C. Irmler (HEPHY Vienna) 7 th Belle II VXD Workshop, Prague.
Next chance for Service test. In the next B2GM Use of old VXD KEK The screw connection may not work. -> double scotch tape for PXD PP mock 1/4.
APVDAQ Status Markus Friedl 22 January M.Friedl: APVDAQ Status2 Introduction What APVDAQ Can Do What APVDAQ Cannot Yet Do What APVDAQ Cannot Do.
Ladder Mount R&D T. Tsuboyama (KEK) 2 Oct T. Tsuboyama (KEK) 2 Oct
SVD DAQ Status Koji Hara (KEK) 2012/7/19 DAQ workshop1.
Origami and Cooling 24th September 2012 C. Irmler (HEPHY Vienna) Joint PXD and SVD Meeting Göttingen.
SVD IR mechanics status S.Tanaka SVD mechanics session.
25th April 2013 C. Irmler (HEPHY), Y. Onuki (IPMU) Ladder Assembly Procedure Belle II – New Collaborators Meeting.
L5 Assembly Plans in Vienna 5 February 2013 Christian Irmler (HEPHY Vienna) 3 rd PXD/SVD Workshop Wetzlar, Germany.
SVD Status Markus Friedl (HEPHY Vienna) SVD-PXD Göttingen, 25 September 2012.
VXD mechanics issues S.Tanaka. Remaining issues (short term) SVD ladder mount table –Mount arm design(KEK+SVD) –Origami cooling pipe assembly procedure.
13 Januar 2011 Immanuel Gfall (HEPHY Vienna) Annekathrin Frankenberger (HEPHY Vienna) SVD Cooling Cooling Meeting Karlsuhe.
Status & schedule of ladder parts production Oct. 2, 2014 Koji Hara (KEK)
24 September 2012 Immanuel Gfall (HEPHY Vienna) SVD Status of Mechanics PXD-SVD Meeting Göttingen.
24 September 2012 Immanuel Gfall (HEPHY Vienna) Annekathrin Frankenberger (HEPHY Vienna) SVD Status of Mechanics PXD-SVD Meeting Göttingen.
SVD FADC Status Markus Friedl (HEPHY Vienna) Wetzlar SVD-PXD Meeting, 5 February 2013.
SVD Docks Markus Friedl (HEPHY Vienna) B2GM, 23 July 2012.
Schedule 24 September 2012 Christian Irmler (HEPHY Vienna) Joint PXD and SVD Meeting Göttingen.
SVD Slow Control Markus Friedl (HEPHY Vienna) DAQ/SC Kickoff Meeting, 8 November 2012.
SVD Summary Markus Friedl (HEPHY Vienna) Wetzlar SVD-PXD Meeting, 6 February 2013.
8 September 2011 Belle II SVD/PXD Installation Procedure Mockup Meeting Munich Immanuel Gfall (HEPHY Vienna)
Florian Buchsteiner (HEPHY Vienna)
SVD FADC SVD-PXD Göttingen, 25 September 2012
SVD Electronics Constraints
SVD Introduction Wetzlar SVD-PXD Meeting, 4 February 2013
SVD Overview Christoph Schwanda Institute of High Energy Physics Austrian Academy of Sciences 8th Belle II VXD Workshop September 9-11, 2015 Trieste, ITALY.
Electronics & Machine Shop
Markus Friedl (HEPHY Vienna)
Update on the SVD construction
7th Belle II VXD Workshop, Prague
Christoph Schwanda (HEPHY Vienna) For the Belle II SVD group
Discussion items SVD mechanics session.
SVD Mechanics Group Organization & Work packages
Comments to the SVD4 structure
Electronics Sub-Group
SVD group organization, schedule, milestones
C. Irmler, M. Friedl, M. Pernicka HEPHY Vienna
Presentation transcript:

Silicon Vertex Detector Schedule 23 July 2012 Christian Irmler (HEPHY Vienna) 12 th Open Meeting of the Belle II Collaboration

SVD construction schedule 2Christian Irmler (HEPHY Vienna)23 July 2012 MS Project Considers dependencies between tasks Not complete yet Need information from collaborating institutes! Latest version (and history) online

Responsible persons Mechanics  I. Gfall Cooling & Services  A. Frankenberger End flanges, support shell  KEK? Electronics  C. Irmler, M. Friedl Ladder assembly  C. Irmler, Y. Onuki –L3, L4  India, Melbourne? –L5  Vienna, C. Irmler –L6  IPMU, Y. Onuki Sensors –Barrel sensors, HPK  T. Tsuboyama –Trapezoidal sensors, Micron  T. Bergauer Mockup  KEK? –who is responsible for which mockup?  need detailed information SVD assembly and installation –all groups –is not very detailed now 3Christian Irmler (HEPHY Vienna)23 July 2012

Mechanics – Ladder design Design of L4-6 has been fixed in March L3 design was critical task at March B2GM L3 solved now –Immanuel will present actual design –minor changes possible –improvement of APV cooling 4Christian Irmler (HEPHY Vienna)23 July 2012

Mechanics – End mounts Several designs (sliding mechanism / pin + screws / mixture) First prototypes available Evaluation & improvements SLM requires high precision Details  I. Gfall 5Christian Irmler (HEPHY Vienna)23 July 2012

Mechanics – CF parts Cooperation with IFCA / INTA –MoU not signed yet  costs! Ribs –use ready-made sandwich for ribs –MPI offered to assist, will try to mill ribs out of CF sandwich plate Cones –other CF manufacturer –can they made from metal? 6Christian Irmler (HEPHY Vienna)23 July 2012

Mockup Above schedule is a rough estimation. Needs to be defined in detail! Who is responsible? Work can be started, after (almost) final design has been fixed. 7Christian Irmler (HEPHY Vienna)23 July 2012

Cooling services & APV cooling Design in progress Details by Immanuel First prototypes in autumn 8Christian Irmler (HEPHY Vienna)23 July 2012

Front-end electronics prototypes successfully tested 9Christian Irmler (HEPHY Vienna)23 July 2012 design in progress prototypes available designed but yet not ordered prototypes tested  ok design very similar to +z L4-6  soon!

Back-end electronics Slightly postponed to speed up front-end design. Level translation daughter boards ready and tested. Controller board, FADC mainboard and FPGA daughter board will be designed soon. Prototypes scheduled for 1 st quarter 2013 Firmware development will be done once HW is designed (~ beginning of 2013) Details will be presented by Markus. 10Christian Irmler (HEPHY Vienna)23 July 2012

Sensors 11Christian Irmler (HEPHY Vienna)23 July 2012

Sensors 12Christian Irmler (HEPHY Vienna)23 July 2012 Micron DSSD –expect final prototypes end of July –will be tested in a combined beam test & irradiation in October 2012 –Need to be ordered in Dec (as soon as beam test results are available!) L3 sensor –should be specified & ordered from HPK soon. Please send me detailed information about HPK delivery plans!

Ladder assembly Detailed plan for L5 Need detail plans for other layers! Production can / must start in summer 2013! 13Christian Irmler (HEPHY Vienna)23 July 2012

SVD assembly & installation (preliminary) Many dependencies –ladder production –mechanics –global schedule We are still within the baseline schedule (physics run from end of 2015) 14Christian Irmler (HEPHY Vienna)23 July 2012

Thank you 15Christian Irmler (HEPHY Vienna)23 July 2012