News From CC-IN2P3 Tier 1 E.Vamvakopoulos and G.Rahal CAF meeting– CCIN2P3 24 Oct 2011.

Slides:



Advertisements
Similar presentations
CCIN2P3 Network FJPPL 2015
Advertisements

Overview of LCG-France Tier-2s and Tier-3s Frédérique Chollet (IN2P3-LAPP) on behalf of the LCG-France project and Tiers representatives CMS visit to Tier-1.
LCG 3D StatusDirk Duellmann1 LCG 3D Throughput Tests Scheduled for May - extended until end of June –Use the production database clusters at tier 1 and.
Computing and LHCb Raja Nandakumar. The LHCb experiment  Universe is made of matter  Still not clear why  Andrei Sakharov’s theory of cp-violation.
G.Rahal LHC Computing Grid: CCIN2P3 role and Contribution KISTI-CCIN2P3 Workshop Ghita Rahal KISTI, December 1st, 2008.
Introduction: Distributed POOL File Access Elizabeth Gallas - Oxford – September 16, 2009 Offline Database Meeting.
Site Report: Tokyo Tomoaki Nakamura ICEPP, The University of Tokyo 2013/12/13Tomoaki Nakamura ICEPP, UTokyo1.
Romanian Tier-2 Federation One site for all: RO-07-NIPNE Mihai Ciubancan on behalf of IT Department.
Database Administrator RAL Proposed Workshop Goals Dirk Duellmann, CERN.
UMD TIER-3 EXPERIENCES Malina Kirn October 23, 2008 UMD T3 experiences 1.
1 LCG-France sites contribution to the LHC activities in 2007 A.Tsaregorodtsev, CPPM, Marseille 14 January 2008, LCG-France Direction.
MW Readiness Verification Status Andrea Manzi IT/SDC 21/01/ /01/15 2.
LHCb Data Challenge in 2002 A.Tsaregorodtsev, CPPM, Marseille DataGRID France meeting, Lyon, 18 April 2002.
Sergey Baranov: PanDA Infrastructure at CERN 3 Sep PanDA Infrastructure at CERN Status Sergey Baranov 3 Sep 2013.
WLCG Operations Coordination Andrea Sciabà IT/SDC 10 th July 2013.
BNL dCache Status and Plan CHEP07: September 2-7, 2007 Zhenping (Jane) Liu for the BNL RACF Storage Group.
ATLAS Distributed Computing ATLAS session WLCG pre-CHEP Workshop New York May 19-20, 2012 Alexei Klimentov Stephane Jezequel Ikuo Ueda For ATLAS Distributed.
The RAL PPD Tier 2/3 Current Status and Future Plans or “Are we ready for next year?” Chris Brew PPD Christmas Lectures th December 2007.
CC-IN2P3 Tier-2s Cloud Frédérique Chollet (IN2P3-LAPP) on behalf of the LCG-France project and Tiers representatives ATLAS visit to Tier-1 Lyon, April.
Outcome should be a documented strategy Not everything needs to go back to square one! – Some things work! – Some work has already been (is being) done.
Click to edit Master title style Sytel’s High Availability Strategy © 2012 Sytel Limited. All rights reservedVersion 2.5.
Dario Barberis: ATLAS DB S&C Week – 3 December Oracle/Frontier and CondDB Consolidation Dario Barberis Genoa University/INFN.
CC-IN2P3: A High Performance Data Center for Research Dominique Boutigny February 2011 Toward a future cooperation with Israel.
CVMFS Alessandro De Salvo Outline  CVMFS architecture  CVMFS usage in the.
WLCG Operations Coordination Andrea Sciabà IT/SDC GDB 11 th September 2013.
The CMS Beijing Tier 2: Status and Application Xiaomei Zhang CMS IHEP Group Meeting December 28, 2007.
CERN IT Department CH-1211 Genève 23 Switzerland t EGEE09 Barcelona ATLAS Distributed Data Management Fernando H. Barreiro Megino on behalf.
The Frontier System For ATLAS E.Vamvakopoulos and G.Rahal CAF meeting– CCIN2P3 9 Sep 2011.
Eric, Sabine, Luc, Manu, Wenjing, Irena CAF dec Squad Report 19 Nov – 6 Dec 2010.
CMS-specific services and activities at CC-IN2P3 Farida Fassi October 23th.
Honolulu - Oct 31st, 2007 Using Glideins to Maximize Scientific Output 1 IEEE NSS 2007 Making Science in the Grid World - Using Glideins to Maximize Scientific.
Lessons learned administering a larger setup for LHCb
LHCONE Phase 1 Prototype architecture. Agenda LHCONE FR prototype target architecture LHCONE FR gateways Other tiers 2 connection to LHCONE FR.
Status of the SL5 migration ALICE TF Meeting
Alice Operations In France
Virtualisation & Containers (A RAL Perspective)
WLCG IPv6 deployment strategy
Running LHC jobs using Kubernetes
Database Replication and Monitoring
Virtualization and Clouds ATLAS position
Status report on LHC_2: ATLAS computing
ATLAS Grid Information System
Status Report on LHC_2 : ATLAS computing
Progress on NA61/NA49 software virtualisation Dag Toppe Larsen Wrocław
ATLAS Cloud Operations
Workload Management System
CC - IN2P3 Site Report Hepix Spring meeting 2011 Darmstadt May 3rd
Data Challenge with the Grid in ATLAS
Elizabeth Gallas - Oxford ADC Weekly September 13, 2011
Database Readiness Workshop Intro & Goals
Introduction to CVMFS A way to distribute HEP software on cloud
A full demonstration based on a “real” analysis scenario
How to enable computing
LCG-France activities
Farida Fassi, Damien Mercie
Readiness of ATLAS Computing - A personal view
Deployment of IPv6-only CPU on WLCG – an update from the HEPiX IPv6 WG
CC IN2P3 - T1 for CMS: CSA07: production and transfer
ATLAS Sites Jamboree, CERN January, 2017
Glexec/SCAS Pilot: IN2P3-CC status
ADC Requirements and Recommendations for Sites
Workshop Summary Dirk Duellmann.
An introduction to the ATLAS Computing Model Alessandro De Salvo
WLCG Collaboration Workshop;
C VCE
Acutelearn Technologies Tivoli Storage Manager(TSM) Training Tivoli Storage Manager Basics: Tivoli Storage Manager Overview Tivoli Storage Manager concepts.
Organization of ATLAS computing in France
Frontier Status Alessandro De Salvo on behalf of the Frontier group
T2D Idea Metrics T2 directly connected to T1s
Presentation transcript:

News From CC-IN2P3 Tier 1 E.Vamvakopoulos and G.Rahal CAF meeting– CCIN2P3 24 Oct 2011

2 Frontier News We finalized the setup of the New Frontier-Launchpad: ccsqfatlas02.in2p3.fr –(install,setup, logs and monitoring) This service can be use for the FR Cloud and for any failover scenario to other sites New site-squid for the FR Cloud sites : ccsqfatlas03.in2p3.fr We will go through the site squid / Frontier-Launchpad to reach Oracle: No more directly access. The New Frontier-Launchpad and site-squid are under production ?

3 Frontier News Frontier System Critical service in ADC –SLS monitoring followed by the shifters –We are going to install a second Frontier launchpad to increase the availability of the service Frontier is a front-end of the Atlas DB (Oracle DB): Oracle Atlas DB migrated on more stable storage system

4 Frontier News New site squids in FR Cloud : –RO-16-UAIC & RO-02-NIPNE RO-02-NIPNE acts as site squid for : –RO-14-ITIM & RO-07-NIPNE

5 CVMS and Pool Conditions VO_ATLAS_SW_DIR=”/cvmfs/atlas.cern.ch/repo/sw” ATLAS_LOCAL_AREA=”/afs/in/sftgroup/atlassl5/local” – afs dependence as the "local setup" will remain until AGIS is ready CDB PFC is taken from cvmfs (skip dcache hotdisk) –ATLAS_POOLCOND_PATH="/cvmfs/atlas.cern.ch/repo/conditions" –ATLAS INSTALLATION SOFTWARE can find automatically the CVMFS installation of a WN Interactive nodes will have CVMFS for local use. –under progress

6 Grouping of BQS and GE queues under the same Panda Analysis Queue for the Site IN2P3-CC-T2 ANALY_IN2P3-CC-T2_LONG [cccreamceli03.in2p3.fr:8443/cream-bqs-long] nickname = ANALY_IN2P3-CC-T2_LONG gridProxy = /opt/vobox/atlas/atlasana/proxy_repository/x509_atlasana override = True queue = cccreamceli03.in2p3.fr/cream-bqs nqueue = 15 depthboost = 5 #--- IN2P3-CC-T2 long [cccreamceli07.in2p3.fr:8443/cream-sge-long] nickname = ANALY_IN2P3-CC-T2_LONG gridProxy = /opt/vobox/atlas/atlasana/proxy_repository/x509_atlasana override = True queue = cccreamceli07.in2p3.fr/cream-sge nqueue = 7 depthboost = 3 #pilotlimit = 2 [cccreamceli08.in2p3.fr:8443/cream-sge-long] nickname = ANALY_IN2P3-CC-T2_LONG gridProxy = /opt/vobox/atlas/atlasana/proxy_repository/x509_atlasana override = True queue = cccreamceli08.in2p3.fr/cream-sge nqueue = 7 depthboost = 3 #pilotlimit = 2 Analysis pilots In long queue of bqs Analysis pilots In long queue of Grid Engine This configuration is working

7 Can we simplify the other Queues configuration ? IN2P3-CC_SGE_VL (Real Queue) –IN2P3-CC-cccreamceli05-sge-verylong –IN2P3-CC-cccreamceli06-sge-verylong IN2P3-CC_VL (Real Queue) –IN2P3-CC-cccreamceli02-verylong-bqs IN2P3-CC_VL (Real Queue) –IN2P3-CC-cccreamceli05-sge-verylong –IN2P3-CC-cccreamceli06-sge-verylong –IN2P3-CC-cccreamceli02-verylong-bqs e.g. The Very Long queues : two queues merged into only one Can be applied to all the other production queues to merge BQS and GE autopilot factory queues (?)

8 Panda Virtual Queue (?) Question: why ANALY are defined as virtual queues ? and PRODUCTION as real queues ? see the config of all sites

9 Reprocessing Vs Simulation (?) We saw high MC production during of Reprocessing ( Sep 2011 ): Is there any way to control the activity of the Reprocessing vs the production MC ? During official Reprocessing Campaign

10 Can we simplify the Panda Queues configuration ? IN2P3-CC (Real Queue) –IN2P3-CC-cccreamceli06-sge-long (Real queue nick name) –IN2P3-CC-cccreamceli05-sge-long IN2P3-CC_SGE_VL (Real Queue) –IN2P3-CC-cccreamceli05-sge-verylong –IN2P3-CC-cccreamceli06-sge-verylong IN2P3-CC_VL (Real Queue) –IN2P3-CC-cccreamceli02-verylong-bqs LYON –IN2P3-CC-cccreamceli02-long-bqs IN2P3-CC-T2 –IN2P3-CC-T2-cccreamceli07-sge-long –IN2P3-CC-T2-cccreamceli08-sge-long

11 Frontier System & French Atlas Cloud Frontiers CPPM LPC LPSC RO-14-ITIM RO-07-NIPNE SACLAY IRFU LPNHE LAL Sites LYON (primary) RAL (backup) Site Squids CC-IN2P3 GRIF LAPP RO-07-NIPNE RO-16-UAIC BEIJING TOKYO